| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$7,500.00 |
$5,000.00 |
$15,950.00 |
$16,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,477 | CY |
$6.50 |
$8.00 |
$8.50 |
$8.25 |
$7.50 |
$34.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,406 | CY |
$9.51 |
$10.00 |
$8.50 |
$12.25 |
$20.00 |
$40.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$5,500.00 |
$4,000.00 |
$5,000.00 |
$13,000.00 |
$8,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 75 | LF |
$2.84 |
$4.00 |
$3.00 |
$11.00 |
$1.90 |
$8.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 152 | LF |
$7.60 |
$8.00 |
$9.00 |
$11.00 |
$7.50 |
$13.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 2,108 | SY |
$2.85 |
$3.00 |
$4.00 |
$4.00 |
$3.00 |
$2.50 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.73 | AC |
$614.63 |
$350.00 |
$800.00 |
$100.00 |
$790.00 |
$700.00 |
| 9 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 415.91 | CY |
$40.17 |
$35.00 |
$70.00 |
$50.00 |
$63.00 |
$68.00 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 1,453.77 | SY |
$1.35 |
$2.50 |
$5.00 |
$2.00 |
$2.25 |
$4.00 |
| 11 | 407(B) 0250 |
TACK COAT | 290.46 | GAL |
$3.68 |
$2.50 |
$2.50 |
$2.60 |
$1.75 |
$1.60 |
| 12 | 408 5774 |
PRIME COAT | 381.11 | GAL |
$7.09 |
$2.90 |
$3.00 |
$2.87 |
$2.00 |
$1.87 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 271.35 | TON |
$95.73 |
$100.00 |
$99.00 |
$105.86 |
$96.00 |
$96.00 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 318.07 | TON |
$109.53 |
$110.00 |
$100.00 |
$108.66 |
$98.00 |
$100.00 |
| 15 | 509(B) 0321 |
CLASS A CONCRETE | 37.53 | CY |
$541.00 |
$800.00 |
$600.00 |
$750.00 |
$1,200.00 |
$1,120.00 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 7 | CY |
$314.84 |
$300.00 |
$300.00 |
$750.00 |
$174.00 |
$1,230.00 |
| 17 | 511(A) 0332 |
REINFORCING STEEL | 2,704.33 | LB |
$1.14 |
$1.00 |
$2.00 |
$2.00 |
$1.65 |
$2.00 |
| 18 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 25 | LF |
$33.71 |
$35.00 |
$37.00 |
$30.00 |
$64.00 |
$55.00 |
| 19 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 211.16 | LF |
$18.70 |
$10.00 |
$40.00 |
$30.00 |
$12.00 |
$10.00 |
| 20 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$26.47 |
$10.00 |
$7.00 |
$30.00 |
$13.00 |
$10.00 |
| 21 | 613(P) 0761 |
24" GALV. STEEL CULVERT END SECTION ROUND | 2 | EA |
$110.00 |
$300.00 |
$350.00 |
$325.00 |
$425.00 |
$500.00 |
| 22 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 985 | SY |
$4.07 |
$4.00 |
$5.00 |
$3.60 |
$3.00 |
$4.10 |
| 23 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,404 | LF |
$1.54 |
$1.00 |
$1.33 |
$1.25 |
$1.00 |
$0.8500 |
| 24 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$2,500.00 |
$2,700.00 |
$2,400.00 |
$5,000.00 |
| 25 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 60 | CY |
$12.04 |
$15.00 |
$15.00 |
$18.00 |
$12.00 |
$34.00 |
| 26 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 40 | CY |
$16.58 |
$15.00 |
$20.00 |
$18.00 |
$41.00 |
$40.00 |
| 27 | 503(B) 6144 |
PRESTRESSED CONCRETE DOUBLE TEE | 272.5 | LF |
$220.00 |
$230.00 |
$215.50 |
$243.40 |
$245.00 |
$285.00 |
| 28 | 504(E) 1380 |
CONCRETE RAIL (TR1) | 155 | LF |
$70.84 |
$80.00 |
$65.00 |
$65.00 |
$107.00 |
$200.00 |
| 29 | 509(A) 1326 |
CLASS AA CONCRETE | 37.6 | CY |
$384.52 |
$850.00 |
$550.00 |
$725.00 |
$360.00 |
$915.00 |
| 30 | 509(B) 1328 |
CLASS A CONCRETE | 28.2 | CY |
$606.05 |
$850.00 |
$550.00 |
$725.00 |
$900.00 |
$2,200.00 |
| 31 | 511(A) 1332 |
REINFORCING STEEL | 11,420 | LB |
$1.01 |
$1.00 |
$1.05 |
$1.35 |
$1.20 |
$2.00 |
| 32 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 140 | LF |
$32.69 |
$50.00 |
$36.00 |
$46.00 |
$50.00 |
$80.00 |
| 33 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 140 | LF |
$11.81 |
$15.00 |
$30.00 |
$18.00 |
$16.00 |
$180.00 |
| 34 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 670 | TON |
$38.33 |
$35.00 |
$45.00 |
$41.50 |
$49.00 |
$90.39 |
| 35 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 145 | TON |
$31.26 |
$30.00 |
$40.00 |
$34.50 |
$44.00 |
$90.39 |
| 36 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$11,040.56 |
$10,000.00 |
$7,000.00 |
$8,500.00 |
$16,000.00 |
$24,000.00 |
| 37 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,272.90 |
$3,000.00 |
$2,200.00 |
$2,395.00 |
$2,300.00 |
$2,600.00 |
| 38 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$5,500.00 |
$3,750.00 |
$7,850.00 |
$4,000.00 |
| 39 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,308.15 |
$1,000.00 |
$2,800.00 |
$3,600.00 |
$1,500.00 |
$4,000.00 |
| 40 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$110,573.44 |
$15,000.00 |
$25,000.00 |
$15,500.00 |
$62,000.00 |
$68,000.00 |