| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,000.00 |
$3,000.00 |
$3,500.00 |
$5,000.00 |
$8,000.00 |
$11,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$25,000.00 |
$21,000.00 |
$20,000.00 |
$12,000.00 |
$16,000.00 |
$20,000.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$6,000.00 |
$4,000.00 |
$4,625.00 |
$5,000.00 |
$5,000.00 |
$3,500.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,700 | LF |
$3.00 |
$3.00 |
$1.70 |
$1.40 |
$2.25 |
$2.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 90 | LF |
$3.50 |
$8.00 |
$9.00 |
$15.00 |
$13.00 |
$8.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 2,407 | SY |
$6.50 |
$3.50 |
$2.00 |
$1.50 |
$1.60 |
$2.50 |
| 7 | 307(J) 4290 |
MODIFIED SUBGRADE | 2,432 | SY |
$6.00 |
$8.50 |
$8.47 |
$5.50 |
$8.75 |
$6.50 |
| 8 | 311(B) 0152 |
PROCESSING EXISTING BASE & SURFACE, METHOD B | 842 | LF |
$5.00 |
$7.50 |
$7.15 |
$8.00 |
$13.50 |
$9.50 |
| 9 | 407(B) 0250 |
TACK COAT | 105 | GAL |
$2.50 |
$5.00 |
$4.01 |
$2.00 |
$4.80 |
$2.35 |
| 10 | 408 5774 |
PRIME COAT | 950 | GAL |
$3.50 |
$7.70 |
$7.37 |
$7.50 |
$4.80 |
$8.75 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 500 | TON |
$77.00 |
$86.00 |
$82.28 |
$80.00 |
$106.00 |
$95.00 |
| 12 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 247 | TON |
$80.00 |
$118.50 |
$113.41 |
$100.00 |
$115.00 |
$119.00 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$250.00 |
$245.00 |
$314.00 |
$300.00 |
$225.00 |
| 14 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$25.00 |
$10.00 |
$9.00 |
$25.00 |
$11.00 |
$15.00 |
| 15 | 501(F) 6352 |
GRANULAR BACKFILL | 66 | CY |
$60.00 |
$65.00 |
$70.00 |
$44.00 |
$135.00 |
$80.00 |
| 16 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 164 | LF |
$250.00 |
$206.46 |
$205.77 |
$217.00 |
$223.00 |
$230.00 |
| 17 | 504(B) 1305 |
SAW-CUT GROOVING | 169 | SY |
$6.00 |
$20.00 |
$13.20 |
$11.84 |
$5.80 |
$25.00 |
| 18 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 166 | LF |
$65.00 |
$70.00 |
$77.50 |
$92.00 |
$95.00 |
$80.00 |
| 19 | 506(A) 1322 |
STRUCTURAL STEEL | 280 | LB |
$3.00 |
$3.00 |
$5.00 |
$3.00 |
$3.30 |
$3.70 |
| 20 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,000.00 |
$1,110.00 |
$900.00 |
$941.00 |
$894.00 |
$950.00 |
| 21 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$1,000.00 |
$1,110.00 |
$900.00 |
$941.00 |
$894.00 |
$950.00 |
| 22 | 509(A) 1326 |
CLASS AA CONCRETE | 45 | CY |
$500.00 |
$500.00 |
$550.00 |
$776.00 |
$690.00 |
$700.00 |
| 23 | 509(B) 1328 |
CLASS A CONCRETE | 61 | CY |
$550.00 |
$500.00 |
$545.00 |
$631.00 |
$420.00 |
$650.00 |
| 24 | 511(A) 1332 |
REINFORCING STEEL | 20,099 | LB |
$1.00 |
$1.05 |
$0.8900 |
$0.8000 |
$1.00 |
$1.00 |
| 25 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 228 | LF |
$32.00 |
$27.00 |
$28.00 |
$36.00 |
$35.00 |
$65.00 |
| 26 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 541 | LF |
$30.00 |
$32.15 |
$30.10 |
$43.00 |
$39.00 |
$77.00 |
| 27 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 228 | LF |
$12.00 |
$12.00 |
$12.00 |
$8.00 |
$9.50 |
$28.00 |
| 28 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 541 | LF |
$15.00 |
$12.00 |
$12.90 |
$8.00 |
$10.00 |
$30.00 |
| 29 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 460 | TON |
$35.00 |
$39.00 |
$42.30 |
$54.00 |
$44.50 |
$50.00 |
| 30 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 140 | TON |
$35.00 |
$38.00 |
$35.05 |
$45.00 |
$34.50 |
$40.00 |
| 31 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$25.00 |
$45.00 |
$35.00 |
$5.00 |
$9.00 |
$25.00 |
| 32 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$25.00 |
$7.00 |
$30.00 |
$5.00 |
$9.00 |
$25.00 |
| 33 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$4,250.00 |
$9,912.00 |
$15,000.00 |
$8,000.00 |
| 34 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,500.00 |
$2,200.00 |
$2,250.00 |
$1,900.00 |
$2,300.00 |
$2,300.00 |
| 35 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,800.00 |
$2,500.00 |
$1,520.00 |
$2,000.00 |
$2,000.00 |
| 36 | 642(A) 0095 |
CONSTRUCTION STAKING LEVEL I | 1 | LSUM |
$5,000.00 |
$4,500.00 |
$4,500.00 |
$3,850.00 |
$8,000.00 |
$7,500.00 |
| 37 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$2,500.00 |
$2,800.00 |
$2,000.00 |
$1,000.00 |
$6,000.00 |
| 38 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$15,000.00 |
$21,000.00 |
$29,500.00 |
$31,400.00 |
$23,500.00 |
$15,000.00 |