| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,000.00 |
$4,000.00 |
$5,500.00 |
$5,000.00 |
$9,715.00 |
$4,000.00 |
$12,500.00 |
$8,000.00 |
$7,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$35,000.00 |
$35,000.00 |
$43,700.00 |
$56,000.00 |
$56,925.00 |
$35,000.00 |
$68,000.00 |
$72,400.00 |
$49,750.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$10,000.00 |
$7,000.00 |
$4,000.00 |
$10,535.00 |
$10,000.00 |
$8,500.00 |
$4,000.00 |
$6,800.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,000 | LF |
$3.00 |
$3.00 |
$2.50 |
$1.00 |
$1.95 |
$2.00 |
$1.68 |
$2.00 |
$2.25 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 300 | LF |
$7.50 |
$10.00 |
$10.00 |
$4.00 |
$7.60 |
$10.00 |
$7.00 |
$10.00 |
$11.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 12,975 | SY |
$2.25 |
$1.74 |
$2.00 |
$1.65 |
$2.00 |
$1.65 |
$1.92 |
$1.65 |
$1.85 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.68 | AC |
$600.00 |
$199.00 |
$700.00 |
$600.00 |
$230.00 |
$600.00 |
$500.00 |
$600.00 |
$600.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,116.2 | TON |
$30.00 |
$28.00 |
$32.00 |
$23.50 |
$33.80 |
$39.11 |
$31.83 |
$26.00 |
$30.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$350.00 |
$250.00 |
$100.00 |
$250.00 |
$450.00 |
$250.00 |
$303.00 |
$350.00 |
| 10 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 102 | LF |
$65.00 |
$31.00 |
$71.75 |
$70.00 |
$67.00 |
$41.52 |
$85.00 |
$76.00 |
$85.00 |
| 11 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 36 | LF |
$100.00 |
$48.00 |
$83.00 |
$100.00 |
$83.00 |
$65.74 |
$105.00 |
$90.00 |
$123.00 |
| 12 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,000.00 |
$720.00 |
$1,082.00 |
$750.00 |
$890.00 |
$986.66 |
$1,000.00 |
$625.00 |
$1,030.00 |
| 13 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$800.00 |
$585.00 |
$800.00 |
$950.00 |
$640.00 |
$787.54 |
$1,250.00 |
$488.00 |
$785.00 |
| 14 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 10.36 | SF |
$15.00 |
$15.00 |
$30.00 |
$15.00 |
$17.00 |
$15.00 |
$25.00 |
$20.00 |
$17.00 |
| 15 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 29 | LF |
$29.00 |
$8.00 |
$24.00 |
$12.00 |
$14.00 |
$12.00 |
$25.00 |
$9.00 |
$13.50 |
| 16 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 68 | CY |
$20.00 |
$30.50 |
$10.00 |
$60.00 |
$14.00 |
$12.00 |
$9.00 |
$18.00 |
$13.50 |
| 17 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 50 | CY |
$25.00 |
$55.00 |
$15.00 |
$40.00 |
$12.00 |
$10.00 |
$12.00 |
$18.00 |
$17.50 |
| 18 | 503(B) 6144 |
PRESTRESSED CONCRETE DOUBLE TEE | 628.5 | LF |
$225.00 |
$220.00 |
$198.00 |
$234.00 |
$200.00 |
$250.00 |
$210.00 |
$263.00 |
$216.00 |
| 19 | 504(E) 1380 |
CONCRETE RAIL (TR1) | 347 | LF |
$65.00 |
$55.00 |
$55.00 |
$88.00 |
$54.00 |
$56.00 |
$70.00 |
$73.00 |
$72.00 |
| 20 | 509(A) 1326 |
CLASS AA CONCRETE | 101.3 | CY |
$500.00 |
$400.00 |
$450.00 |
$450.00 |
$500.00 |
$450.00 |
$580.00 |
$378.00 |
$695.00 |
| 21 | 509(B) 1328 |
CLASS A CONCRETE | 70.7 | CY |
$450.00 |
$400.00 |
$450.00 |
$450.00 |
$540.00 |
$590.00 |
$610.00 |
$714.00 |
$640.00 |
| 22 | 511(A) 1332 |
REINFORCING STEEL | 28,370 | LB |
$1.00 |
$0.8000 |
$1.00 |
$1.25 |
$0.8500 |
$0.9500 |
$0.8800 |
$0.8000 |
$0.9000 |
| 23 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 715 | LF |
$30.00 |
$25.00 |
$24.00 |
$18.00 |
$28.50 |
$30.00 |
$26.60 |
$32.00 |
$36.00 |
| 24 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 715 | LF |
$15.00 |
$15.00 |
$15.00 |
$9.00 |
$6.00 |
$13.00 |
$11.40 |
$7.00 |
$21.00 |
| 25 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 276.5 | LF |
$550.00 |
$420.00 |
$399.00 |
$475.00 |
$550.00 |
$500.00 |
$509.00 |
$519.00 |
$565.00 |
| 26 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,677 | TON |
$38.00 |
$32.00 |
$36.00 |
$31.50 |
$33.00 |
$47.00 |
$36.04 |
$39.00 |
$41.00 |
| 27 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 628 | TON |
$33.00 |
$30.00 |
$34.00 |
$27.25 |
$28.50 |
$42.00 |
$31.33 |
$32.00 |
$36.00 |
| 28 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,000.00 |
$3,000.00 |
$6,000.00 |
$4,000.00 |
$3,850.00 |
$3,000.00 |
$8,000.00 |
$5,000.00 |
$14,250.00 |
| 29 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 80 | LF |
$25.00 |
$18.00 |
$25.00 |
$18.00 |
$19.75 |
$18.00 |
$21.85 |
$18.00 |
$20.00 |
| 30 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 3 | EA |
$2,500.00 |
$1,800.00 |
$2,200.00 |
$1,900.00 |
$1,975.00 |
$1,800.00 |
$2,200.00 |
$1,800.00 |
$2,150.00 |
| 31 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$1,650.00 |
$3,450.00 |
$2,850.00 |
$1,800.00 |
$3,600.00 |
$2,500.00 |
$1,650.00 |
$3,200.00 |
| 32 | 642(A) 0095 |
CONSTRUCTION STAKING LEVEL I | 1 | LSUM |
$8,000.00 |
$8,000.00 |
$6,500.00 |
$4,500.00 |
$8,500.00 |
$9,500.00 |
$8,500.00 |
$7,450.00 |
$8,400.00 |
| 33 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$3,650.00 |
$2,500.00 |
$1,350.00 |
$2,500.00 |
$4,250.00 |
$2,500.00 |
$6,500.00 |
| 34 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$32,000.00 |
$36,500.00 |
$35,000.00 |
$29,446.20 |
$7,700.00 |
$20,000.00 |
$35,000.00 |
$35,600.00 |
$9,500.00 |