| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$100,000.00 |
$21,400.00 |
$31,000.00 |
$255,000.00 |
$130,000.00 |
$40,404.11 |
$20,435.75 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 206,378 | CY |
$5.50 |
$3.98 |
$4.00 |
$3.30 |
$5.00 |
$5.10 |
$4.76 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 30,000 | CY |
$8.50 |
$3.78 |
$4.50 |
$4.65 |
$0.0100 |
$6.49 |
$4.76 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$28,890.00 |
$32,000.00 |
$32,500.00 |
$30,000.00 |
$32,246.36 |
$94,214.81 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 8,000 | LF |
$3.00 |
$1.34 |
$1.20 |
$1.25 |
$1.40 |
$2.86 |
$2.75 |
| 6 | 221(E) 2804 |
TEMPORARY SEDIMENT BASIN | 1 | EA |
$1,000.00 |
$535.00 |
$2,400.00 |
$800.00 |
$500.00 |
$3,811.45 |
$1,131.70 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 500 | LF |
$7.50 |
$7.49 |
$5.91 |
$2.00 |
$10.00 |
$9.32 |
$7.55 |
| 8 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 6 | CY |
$50.00 |
$107.00 |
$116.00 |
$100.00 |
$120.00 |
$107.01 |
$82.71 |
| 9 | 229 4318 |
DITCH LINER PROTECTION | 1,475 | LF |
$1.58 |
$1.59 |
$1.72 |
$1.75 |
$2.00 |
$1.58 |
$2.37 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 107,835 | SY |
$1.34 |
$1.54 |
$1.45 |
$1.50 |
$1.50 |
$1.53 |
$1.74 |
| 11 | 232(A) 2813 |
SEEDING METHOD A | 14 | AC |
$700.00 |
$529.65 |
$500.00 |
$510.00 |
$1,200.00 |
$524.93 |
$1,231.52 |
| 12 | 233(A) 2817 |
VEGETATIVE MULCHING | 30.2 | AC |
$392.76 |
$850.65 |
$810.00 |
$810.00 |
$600.00 |
$843.07 |
$642.09 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 9,202 | CY |
$35.00 |
$38.96 |
$39.00 |
$40.00 |
$48.00 |
$43.90 |
$48.27 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 26,950 | SY |
$1.18 |
$1.37 |
$1.20 |
$1.25 |
$1.15 |
$1.36 |
$1.43 |
| 15 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 26,950 | SY |
$2.50 |
$2.13 |
$1.97 |
$2.00 |
$2.50 |
$2.01 |
$2.12 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,120 | TON |
$21.81 |
$22.00 |
$21.32 |
$24.50 |
$24.00 |
$27.23 |
$23.36 |
| 17 | 407(B) 0250 |
TACK COAT | 2,573 | GAL |
$3.00 |
$3.26 |
$2.00 |
$3.20 |
$3.40 |
$3.23 |
$3.83 |
| 18 | 408 5774 |
PRIME COAT | 9,466 | GAL |
$4.26 |
$3.55 |
$0.5000 |
$3.45 |
$3.70 |
$3.52 |
$4.16 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 8,213 | TON |
$70.00 |
$71.02 |
$70.00 |
$69.00 |
$73.00 |
$70.38 |
$83.23 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,244 | TON |
$75.00 |
$77.70 |
$76.00 |
$75.00 |
$80.00 |
$77.01 |
$91.07 |
| 21 | 412 5267 |
COLD MILLING PAVEMENT | 3,383 | SY |
$3.50 |
$2.30 |
$2.89 |
$2.50 |
$2.50 |
$2.28 |
$2.70 |
| 22 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 7,683 | LF |
$1.00 |
$0.8600 |
$1.04 |
$0.4000 |
$0.9000 |
$0.8500 |
$1.00 |
| 23 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 5 | CY |
$25.00 |
$26.75 |
$315.00 |
$250.00 |
$5.00 |
$378.51 |
$31.35 |
| 24 | 509(A) 0319 |
CLASS AA CONCRETE | 15.3 | CY |
$450.00 |
$786.45 |
$500.00 |
$1,600.00 |
$750.00 |
$600.00 |
$376.23 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 140 | CY |
$300.00 |
$251.45 |
$300.00 |
$240.00 |
$400.00 |
$600.00 |
$300.98 |
| 26 | 511(A) 0332 |
REINFORCING STEEL | 2,000 | LB |
$1.25 |
$2.14 |
$1.74 |
$2.75 |
$2.00 |
$1.50 |
$1.07 |
| 27 | 602(C) 4155 |
FILTER FABRIC | 1,920 | SY |
$3.00 |
$1.34 |
$2.36 |
$1.75 |
$1.00 |
$1.53 |
$2.26 |
| 28 | 611(G) 5388 |
INLET CDI RCB DES. 2 | 1 | EA |
$2,500.00 |
$3,424.00 |
$9,400.00 |
$2,500.00 |
$8,000.00 |
$5,551.16 |
$2,069.24 |
| 29 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 72 | LF |
$27.13 |
$25.24 |
$49.00 |
$42.50 |
$75.00 |
$44.45 |
$40.76 |
| 30 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 58 | LF |
$30.00 |
$29.82 |
$62.00 |
$47.50 |
$90.00 |
$55.23 |
$43.89 |
| 31 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,150 | LF |
$10.00 |
$15.10 |
$9.00 |
$4.25 |
$15.00 |
$10.33 |
$16.35 |
| 32 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 24 | LF |
$12.00 |
$15.10 |
$29.00 |
$15.00 |
$15.00 |
$46.55 |
$38.05 |
| 33 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$500.00 |
$203.24 |
$255.00 |
$250.00 |
$200.00 |
$551.12 |
$219.46 |
| 34 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$550.00 |
$252.87 |
$296.00 |
$300.00 |
$250.00 |
$582.94 |
$263.35 |
| 35 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 383 | CY |
$40.00 |
$37.70 |
$50.00 |
$39.00 |
$50.00 |
$43.22 |
$45.15 |
| 36 | 613(V) 1180 |
TRENCH EXCAVATION | 770 | CY |
$24.00 |
$8.42 |
$1.00 |
$6.00 |
$5.00 |
$7.86 |
$1.00 |
| 37 | 619(B) 4725 |
REMOVAL OF FENCE | 2,300 | LF |
$1.50 |
$0.2300 |
$3.47 |
$1.50 |
$2.00 |
$1.52 |
$2.51 |
| 38 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 18,810 | SY |
$2.44 |
$1.37 |
$1.18 |
$1.85 |
$2.25 |
$1.80 |
$2.25 |
| 39 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 777 | LF |
$2.47 |
$2.27 |
$1.00 |
$2.50 |
$10.00 |
$4.49 |
$6.27 |
| 40 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 970 | LF |
$4.08 |
$2.27 |
$6.24 |
$4.00 |
$5.00 |
$7.19 |
$5.02 |
| 41 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 33 | LF |
$10.00 |
$4.54 |
$32.00 |
$10.00 |
$20.00 |
$42.26 |
$21.95 |
| 42 | 619(C) 0924 |
SAWING PAVEMENT | 104 | LF |
$4.70 |
$3.40 |
$5.00 |
$4.00 |
$20.00 |
$16.32 |
$12.54 |
| 43 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,923 | LF |
$5.00 |
$4.82 |
$5.21 |
$5.00 |
$6.00 |
$4.72 |
$4.39 |
| 44 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 40,000 | LF |
$0.1200 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1500 |
$0.1100 |
$0.1300 |
| 45 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 20,000 | LF |
$0.1400 |
$0.2700 |
$0.2500 |
$0.5200 |
$0.2500 |
$0.2700 |
$0.3100 |
| 46 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,800 | LF |
$22.50 |
$27.55 |
$26.00 |
$12.50 |
$27.00 |
$27.31 |
$43.89 |
| 47 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,800 | LF |
$7.50 |
$4.01 |
$4.00 |
$1.50 |
$4.00 |
$3.98 |
$5.02 |
| 48 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 600 | SD |
$11.00 |
$1.07 |
$1.01 |
$2.06 |
$1.25 |
$1.06 |
$1.25 |
| 49 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 8,100 | SD |
$0.0800 |
$0.1100 |
$0.1000 |
$0.0200 |
$0.1500 |
$0.1100 |
$0.1300 |
| 50 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,900 | SD |
$2.75 |
$1.61 |
$1.70 |
$1.03 |
$2.00 |
$1.59 |
$1.88 |
| 51 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,900 | SD |
$1.25 |
$0.8000 |
$0.8000 |
$1.03 |
$1.00 |
$0.8000 |
$0.9400 |
| 52 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,800 | SD |
$0.2500 |
$0.2700 |
$0.2500 |
$0.0500 |
$0.3500 |
$0.2700 |
$0.3100 |
| 53 | 880(C) 8848 |
WING BARRICADES | 1,200 | SD |
$2.25 |
$0.3200 |
$0.3500 |
$0.0200 |
$0.4000 |
$0.3200 |
$0.3800 |
| 54 | 880(D) 8854 |
VERTICAL PANELS | 9,000 | SD |
$0.1200 |
$0.1100 |
$0.1200 |
$0.0200 |
$0.1500 |
$0.1100 |
$0.1300 |
| 55 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 14,700 | SD |
$0.2000 |
$0.1100 |
$0.1200 |
$0.0500 |
$0.1500 |
$0.1100 |
$0.1300 |
| 56 | 880(F) 8878 |
DRUMS | 20,250 | SD |
$0.1000 |
$0.0900 |
$0.0900 |
$0.0200 |
$0.1000 |
$0.0800 |
$0.1000 |
| 57 | 880(G) 8890 |
CHANNELIZER CONES | 20,250 | SD |
$0.1200 |
$0.0900 |
$0.0900 |
$0.0200 |
$0.1000 |
$0.0800 |
$0.1000 |
| 58 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 600 | SD |
$25.00 |
$10.70 |
$10.50 |
$5.16 |
$11.00 |
$10.60 |
$12.54 |
| 59 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 25,000 | LF |
$0.7000 |
$0.5400 |
$0.5500 |
$0.4100 |
$0.6000 |
$0.5300 |
$0.6300 |
| 60 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,000.00 |
$11,636.25 |
$24,000.00 |
$13,000.00 |
$35,000.00 |
$50,000.00 |
$85,278.09 |
| 61 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,210.00 |
$1,000.00 |
$3,000.00 |
$3,000.00 |
$11,955.23 |
$3,135.23 |
| 62 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$6,839.44 |
$4,280.00 |
$7,000.00 |
$15,000.00 |
$15,000.00 |
$10,604.63 |
$4,389.31 |
| 63 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$75,970.00 |
$80,000.00 |
$180,000.00 |
$160,000.00 |
$215,000.00 |
$146,492.98 |