| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$16,000.00 |
$5,000.00 |
$65,000.00 |
$91,995.50 |
$48,000.00 |
$40,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 44,336 | CY |
$5.25 |
$7.00 |
$5.00 |
$7.70 |
$9.96 |
$10.25 |
| 3 | 202(F) 0110 |
EMBANKMENTS | 8,515 | CY |
$7.00 |
$2.00 |
$5.14 |
$2.40 |
$5.25 |
$6.50 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 13,832 | LF |
$1.50 |
$1.10 |
$1.15 |
$1.89 |
$1.85 |
$3.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 2,366 | LF |
$6.90 |
$6.00 |
$5.00 |
$5.55 |
$13.34 |
$7.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 98,379 | SY |
$1.20 |
$1.40 |
$1.38 |
$1.37 |
$1.38 |
$1.50 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 13,212 | CY |
$34.00 |
$30.00 |
$28.00 |
$29.54 |
$33.14 |
$32.40 |
| 8 | 325 5271 |
SEPARATOR FABRIC | 37,459 | SY |
$1.00 |
$1.20 |
$1.00 |
$1.12 |
$1.28 |
$1.00 |
| 9 | 407(B) 0250 |
TACK COAT | 9,073 | GAL |
$2.50 |
$3.00 |
$2.00 |
$2.33 |
$2.58 |
$2.75 |
| 10 | 408 5774 |
PRIME COAT | 13,296 | GAL |
$3.50 |
$3.00 |
$0.5000 |
$6.73 |
$3.90 |
$4.25 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 11,942 | TON |
$66.00 |
$50.00 |
$61.00 |
$56.92 |
$56.75 |
$60.00 |
| 12 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 3,479 | TON |
$74.00 |
$70.00 |
$80.00 |
$77.51 |
$79.85 |
$82.50 |
| 13 | 412 5267 |
COLD MILLING PAVEMENT | 318 | SY |
$14.50 |
$15.00 |
$16.24 |
$13.24 |
$9.92 |
$15.00 |
| 14 | 414(C) 4425 |
CONT. REINF. P.C.C. PAVEMENT(PLACEMENT) | 317 | SY |
$42.00 |
$60.00 |
$103.55 |
$44.74 |
$47.59 |
$64.00 |
| 15 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 79 | CY |
$140.00 |
$120.00 |
$143.00 |
$103.35 |
$166.70 |
$220.00 |
| 16 | 416 0100 |
DOWEL BAR RETROFIT | 80 | EA |
$24.00 |
$125.00 |
$138.00 |
$13.50 |
$108.15 |
$115.00 |
| 17 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 1,498 | CY |
$15.25 |
$15.00 |
$7.86 |
$16.78 |
$7.50 |
$5.00 |
| 18 | 506(A) 1322 |
STRUCTURAL STEEL | 17,308 | LB |
$3.70 |
$1.50 |
$2.21 |
$1.18 |
$1.18 |
$2.50 |
| 19 | 509(A) 0319 |
CLASS AA CONCRETE | 396.78 | CY |
$400.00 |
$425.00 |
$688.00 |
$406.39 |
$416.11 |
$306.00 |
| 20 | 509(B) 0321 |
CLASS A CONCRETE | 99.54 | CY |
$376.50 |
$475.00 |
$680.00 |
$279.42 |
$488.49 |
$312.00 |
| 21 | 511(A) 0332 |
REINFORCING STEEL | 91,374 | LB |
$1.00 |
$0.8500 |
$0.5100 |
$0.6100 |
$0.6200 |
$0.8000 |
| 22 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 3,230 | TON |
$28.25 |
$25.00 |
$22.00 |
$23.91 |
$23.87 |
$30.50 |
| 23 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 2,546 | SY |
$1.75 |
$2.00 |
$1.27 |
$1.52 |
$5.85 |
$1.00 |
| 24 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 54 | LF |
$57.25 |
$70.00 |
$38.80 |
$54.48 |
$27.52 |
$57.00 |
| 25 | 613(A) 4499 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 42 | LF |
$206.00 |
$135.00 |
$149.00 |
$115.56 |
$77.36 |
$140.00 |
| 26 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 12 | LF |
$27.00 |
$30.00 |
$60.39 |
$34.10 |
$34.43 |
$57.00 |
| 27 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 20 | LF |
$42.00 |
$40.00 |
$39.95 |
$40.06 |
$45.08 |
$75.00 |
| 28 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 95 | LF |
$52.30 |
$60.00 |
$36.95 |
$50.04 |
$55.90 |
$99.00 |
| 29 | 613(B) 4531 |
49" X 33" CORR. GALV. STEEL PIPE ARCH | 266 | LF |
$61.30 |
$70.00 |
$53.00 |
$53.45 |
$61.04 |
$115.00 |
| 30 | 613(E) 4786 |
18" CORRUGATED POLYETHYLENE PIPE TYPE "S" | 882 | LF |
$32.00 |
$30.00 |
$19.00 |
$22.79 |
$37.21 |
$57.00 |
| 31 | 613(E) 4787 |
24" CORRUGATED POLYETHYLENE PIPE TYPE "S" | 84 | LF |
$39.00 |
$40.00 |
$38.00 |
$32.51 |
$43.71 |
$63.00 |
| 32 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$600.00 |
$400.00 |
$775.00 |
$360.03 |
$109.03 |
$570.00 |
| 33 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 40 | EA |
$1,800.00 |
$700.00 |
$57.00 |
$1,090.80 |
$1,096.95 |
$2,400.00 |
| 34 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$1,800.00 |
$800.00 |
$138.00 |
$1,089.77 |
$1,095.92 |
$3,000.00 |
| 35 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 16 | EA |
$2,200.00 |
$1,100.00 |
$90.00 |
$1,239.31 |
$1,246.30 |
$3,400.00 |
| 36 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 1 | EA |
$1,200.00 |
$1,100.00 |
$35.00 |
$1,239.31 |
$1,246.30 |
$3,500.00 |
| 37 | 613(N) 7505 |
TYPE F4 SLOPED CONCRETE END SECTION | 2 | EA |
$3,000.00 |
$4,000.00 |
$1,100.00 |
$4,557.79 |
$4,583.50 |
$4,000.00 |
| 38 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 64.25 | CY |
$20.00 |
$30.00 |
$22.00 |
$21.49 |
$26.33 |
$45.00 |
| 39 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$11,500.00 |
$5,000.00 |
$19,000.00 |
$17,859.52 |
$36,000.00 |
$28,000.00 |
| 40 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 26,736 | SY |
$2.25 |
$2.00 |
$1.75 |
$2.19 |
$4.20 |
$3.80 |
| 41 | 619(C) 0924 |
SAWING PAVEMENT | 167 | LF |
$4.00 |
$5.00 |
$23.00 |
$5.41 |
$1.07 |
$3.00 |
| 42 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,900 | LF |
$15.75 |
$15.00 |
$17.00 |
$15.36 |
$16.22 |
$17.00 |
| 43 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,176.50 |
$2,000.00 |
$2,400.00 |
$2,304.50 |
$2,240.25 |
$2,375.00 |
| 44 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 6 | EA |
$65.50 |
$70.00 |
$257.00 |
$66.58 |
$66.95 |
$70.00 |
| 45 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 2 | EA |
$102.25 |
$160.00 |
$257.00 |
$153.64 |
$154.50 |
$165.00 |
| 46 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 8 | EA |
$9.50 |
$20.00 |
$80.00 |
$20.49 |
$20.60 |
$22.00 |
| 47 | 508 7100 |
PRECAST REINFORCED CONCRETE BOX | 52 | LF |
$1,350.00 |
$550.00 |
$257.00 |
$583.07 |
$564.17 |
$420.00 |
| 48 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,072.00 |
$2,400.00 |
$2,000.00 |
$1,792.39 |
$2,060.00 |
$2,200.00 |
| 49 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 94.08 | SF |
$13.30 |
$16.00 |
$16.00 |
$15.88 |
$15.97 |
$17.00 |
| 50 | 851(C) 8324 |
2" SQUARE TUBE POST | 212.5 | LF |
$9.50 |
$9.00 |
$9.00 |
$8.71 |
$8.76 |
$9.50 |
| 51 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 41,306 | LF |
$0.4000 |
$0.4500 |
$0.4700 |
$0.4600 |
$0.4600 |
$0.5000 |
| 52 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 2 | EA |
$95.50 |
$80.00 |
$85.00 |
$76.82 |
$77.25 |
$85.00 |
| 53 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$12,786.00 |
$5,000.00 |
$5,400.00 |
$5,223.54 |
$5,253.00 |
$5,600.00 |
| 54 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,240.00 |
$3,000.00 |
$1,200.00 |
$1,116.40 |
$5,665.00 |
$2,000.00 |
| 55 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$2,500.00 |
$4,000.00 |
$5,582.01 |
$9,000.00 |
$9,000.00 |
| 56 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$155,450.00 |
$165,000.00 |
$40,000.00 |
$26,924.36 |
$56,000.00 |
$100,000.00 |
| 57 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$10,000.00 |
$40,000.00 |
$44,348.85 |
$35,000.00 |
$38,000.00 |