| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$15,000.00 |
$2,317.62 |
$5,628.32 |
$6,500.00 |
$27,874.15 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 56,089 | CY |
$4.75 |
$5.00 |
$3.87 |
$7.80 |
$4.50 |
$5.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 7,265 | CY |
$7.00 |
$8.15 |
$6.53 |
$12.07 |
$8.70 |
$7.86 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$9,200.00 |
$3,295.93 |
$9,315.20 |
$38,500.00 |
$6,724.57 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 16,600 | LF |
$3.50 |
$1.10 |
$1.20 |
$1.12 |
$1.25 |
$1.22 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 488 | LF |
$4.50 |
$9.15 |
$8.50 |
$9.12 |
$9.00 |
$8.67 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 67,480 | SY |
$2.00 |
$1.10 |
$1.03 |
$1.12 |
$1.10 |
$1.05 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 13.97 | AC |
$545.00 |
$431.50 |
$150.00 |
$429.37 |
$342.00 |
$331.50 |
| 9 | 241 2832 |
MOWING | 41.9 | AC |
$300.00 |
$71.00 |
$40.51 |
$70.71 |
$47.50 |
$45.90 |
| 10 | 307(D) 4230 |
LIME | 1,817 | TON |
$125.00 |
$172.60 |
$168.46 |
$161.77 |
$180.00 |
$178.50 |
| 11 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 100,921 | SY |
$2.35 |
$2.00 |
$1.94 |
$2.83 |
$2.75 |
$2.04 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 309 | TON |
$35.00 |
$32.60 |
$19.39 |
$23.50 |
$33.85 |
$22.11 |
| 13 | 407(B) 0250 |
TACK COAT | 31,216 | GAL |
$2.75 |
$3.50 |
$2.92 |
$2.28 |
$2.25 |
$2.99 |
| 14 | 408 5774 |
PRIME COAT | 18,272 | GAL |
$5.75 |
$5.50 |
$4.68 |
$4.71 |
$5.75 |
$4.95 |
| 15 | 409(A) 4242 |
FABRIC REINFORCEMENT | 245 | SY |
$3.00 |
$1.10 |
$7.81 |
$8.15 |
$14.25 |
$8.52 |
| 16 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 22,163 | TON |
$64.00 |
$67.14 |
$73.99 |
$68.85 |
$69.00 |
$74.39 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 41,237 | TON |
$60.00 |
$60.74 |
$67.94 |
$63.48 |
$62.00 |
$66.85 |
| 18 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 12,585 | TON |
$73.00 |
$72.10 |
$80.71 |
$74.08 |
$75.00 |
$80.30 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,367 | TON |
$70.00 |
$68.15 |
$73.90 |
$69.86 |
$73.00 |
$70.07 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 2,224 | SY |
$3.00 |
$4.40 |
$5.32 |
$4.56 |
$2.50 |
$6.38 |
| 21 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 65,370 | LF |
$0.1500 |
$0.0900 |
$0.1100 |
$0.1200 |
$0.1500 |
$0.1700 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$325.00 |
$309.00 |
$176.19 |
$614.28 |
$350.00 |
$485.10 |
| 23 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 27 | LF |
$60.00 |
$92.40 |
$124.45 |
$99.18 |
$95.00 |
$65.05 |
| 24 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 162 | LF |
$32.00 |
$41.20 |
$38.02 |
$45.43 |
$69.00 |
$37.10 |
| 25 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 56 | LF |
$36.00 |
$56.65 |
$44.63 |
$48.27 |
$86.00 |
$41.70 |
| 26 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 3 | EA |
$1,100.00 |
$1,340.00 |
$1,100.00 |
$1,920.70 |
$2,100.00 |
$1,108.40 |
| 27 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 1 | EA |
$1,150.00 |
$1,390.00 |
$1,150.00 |
$1,925.65 |
$2,250.00 |
$1,156.77 |
| 28 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 3 | EA |
$1,200.00 |
$1,545.00 |
$1,200.00 |
$1,898.98 |
$3,050.00 |
$1,214.60 |
| 29 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,400.00 |
$1,390.00 |
$1,400.00 |
$2,203.60 |
$3,940.00 |
$1,896.50 |
| 30 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$35,000.00 |
$30,750.00 |
$12,094.98 |
$24,985.78 |
$10,407.00 |
$7,221.71 |
| 31 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 23,007 | SY |
$3.50 |
$3.20 |
$4.35 |
$5.00 |
$0.5000 |
$4.26 |
| 32 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,001 | LF |
$0.2000 |
$0.4000 |
$0.3500 |
$0.3900 |
$0.4000 |
$0.4000 |
| 33 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 14,700 | LF |
$0.4000 |
$0.7500 |
$0.5500 |
$0.7500 |
$0.8000 |
$0.7500 |
| 34 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 3,156 | EA |
$0.6600 |
$0.5000 |
$0.3500 |
$0.4500 |
$0.5000 |
$0.4600 |
| 35 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 6,600 | LF |
$0.2100 |
$0.2500 |
$0.2000 |
$0.2100 |
$0.2500 |
$0.2100 |
| 36 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,690 | SD |
$0.2100 |
$0.0800 |
$0.4000 |
$0.0800 |
$0.0800 |
$0.0800 |
| 37 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,850 | SD |
$0.5100 |
$0.4500 |
$1.25 |
$0.4400 |
$0.5000 |
$0.4500 |
| 38 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,100 | SD |
$0.4500 |
$0.4500 |
$0.2000 |
$0.4400 |
$0.5000 |
$0.4500 |
| 39 | 880(C) 8836 |
CONSTRUCTION BARRICADES(TYPE II) | 900 | SD |
$0.3000 |
$0.0200 |
$0.1000 |
$0.0200 |
$0.0200 |
$0.0200 |
| 40 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 540 | SD |
$0.4500 |
$1.05 |
$4.00 |
$1.01 |
$1.05 |
$1.02 |
| 41 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$0.5500 |
$1.05 |
$0.5000 |
$1.01 |
$1.05 |
$1.02 |
| 42 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,880 | SD |
$0.1200 |
$0.4500 |
$1.00 |
$0.4500 |
$0.5000 |
$0.4600 |
| 43 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 14,820 | SD |
$0.1000 |
$0.0200 |
$0.0500 |
$0.0200 |
$0.0200 |
$0.0200 |
| 44 | 880(F) 8878 |
DRUMS | 9,870 | SD |
$0.2500 |
$1.03 |
$0.3000 |
$1.01 |
$1.05 |
$1.02 |
| 45 | 880(G) 8890 |
CHANNELIZER CONES | 13,350 | SD |
$0.5000 |
$0.0200 |
$0.3000 |
$0.0200 |
$0.0200 |
$0.0200 |
| 46 | 880(I) 8902 |
FLAGGER | 8 | SD |
$150.00 |
$166.25 |
$2,032.24 |
$857.18 |
$3,500.00 |
$191.82 |
| 47 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 56 | SD |
$25.00 |
$25.75 |
$30.00 |
$25.23 |
$26.25 |
$25.50 |
| 48 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 30 | EA |
$60.00 |
$46.35 |
$45.00 |
$45.42 |
$47.25 |
$45.90 |
| 49 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$140.00 |
$92.70 |
$300.00 |
$90.85 |
$94.50 |
$91.80 |
| 50 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 819.52 | SF |
$18.00 |
$16.50 |
$15.00 |
$16.15 |
$16.80 |
$16.32 |
| 51 | 851(C) 8324 |
2" SQUARE TUBE POST | 1,052 | LF |
$8.00 |
$8.25 |
$7.50 |
$8.08 |
$8.40 |
$8.16 |
| 52 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 116 | LF |
$12.00 |
$9.25 |
$8.50 |
$9.08 |
$9.50 |
$9.18 |
| 53 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 85,100 | LF |
$0.5000 |
$0.3500 |
$0.3600 |
$0.3400 |
$0.4000 |
$0.3500 |
| 54 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,050 | LF |
$0.8000 |
$0.6000 |
$0.7000 |
$0.5600 |
$0.6000 |
$0.5600 |
| 55 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 1,400 | LF |
$1.20 |
$2.05 |
$1.20 |
$2.02 |
$2.10 |
$2.04 |
| 56 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 76 | LF |
$1.60 |
$3.10 |
$5.00 |
$3.03 |
$3.20 |
$3.06 |
| 57 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 38 | EA |
$600.00 |
$70.00 |
$100.00 |
$68.64 |
$71.40 |
$69.36 |
| 58 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,000.00 |
$71,450.00 |
$9,000.00 |
$68,395.45 |
$26,000.00 |
$81,954.36 |
| 59 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$10,250.00 |
$500.00 |
$1,514.07 |
$8,500.00 |
$6,722.92 |
| 60 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$6,000.00 |
$8,500.00 |
$2,730.00 |
$22,422.73 |
$27,000.00 |
$18,732.80 |
| 61 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$330,720.00 |
$337,425.00 |
$149,233.25 |
$160,205.47 |
$350,300.00 |
$387,543.98 |
| 62 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$24,806.00 |
$46,000.00 |
$47,390.00 |
$22,785.91 |
$170,000.00 |
$55,714.20 |