| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$6,000.00 |
$5,000.00 |
$5,000.00 |
$6,000.00 |
$20,000.00 |
$19,500.00 |
$9,216.04 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$45,000.00 |
$88,000.00 |
$91,000.00 |
$94,000.00 |
$62,000.00 |
$125,000.00 |
$124,000.00 |
$342,200.98 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,000.00 |
$7,400.00 |
$5,500.00 |
$6,000.00 |
$7,000.00 |
$14,000.00 |
$9,000.00 |
$3,072.01 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 600 | LF |
$1.80 |
$2.00 |
$1.80 |
$2.20 |
$1.30 |
$2.20 |
$3.00 |
$2.46 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 600 | LF |
$7.00 |
$6.00 |
$6.50 |
$11.00 |
$6.30 |
$11.00 |
$8.00 |
$12.15 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 14,774 | SY |
$2.00 |
$1.80 |
$1.53 |
$1.52 |
$1.50 |
$1.60 |
$1.65 |
$1.71 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.27 | AC |
$800.00 |
$750.00 |
$400.00 |
$750.00 |
$260.00 |
$770.00 |
$500.00 |
$858.93 |
| 8 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 6,050 | SY |
$3.50 |
$5.00 |
$6.44 |
$5.00 |
$4.35 |
$5.00 |
$7.00 |
$8.80 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 325 | TON |
$35.00 |
$35.00 |
$36.77 |
$30.00 |
$53.00 |
$40.00 |
$40.75 |
$16.51 |
| 10 | 407(B) 0250 |
TACK COAT | 290 | GAL |
$4.00 |
$4.00 |
$2.48 |
$2.50 |
$3.00 |
$6.60 |
$2.70 |
$10.44 |
| 11 | 408 5774 |
PRIME COAT | 1,300 | GAL |
$7.00 |
$7.50 |
$7.43 |
$7.40 |
$6.50 |
$4.00 |
$8.10 |
$12.29 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,170 | TON |
$80.00 |
$69.85 |
$70.03 |
$68.00 |
$66.55 |
$70.00 |
$74.00 |
$73.20 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 570 | TON |
$90.00 |
$84.85 |
$86.63 |
$84.00 |
$80.80 |
$88.00 |
$92.00 |
$91.75 |
| 14 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$300.00 |
$250.00 |
$278.00 |
$350.00 |
$334.00 |
$300.00 |
$300.00 |
$192.92 |
| 15 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 310 | TON |
$30.00 |
$39.00 |
$43.94 |
$42.00 |
$57.00 |
$55.00 |
$55.00 |
$26.75 |
| 16 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 86 | LF |
$65.00 |
$38.00 |
$34.50 |
$40.00 |
$40.31 |
$58.00 |
$55.00 |
$57.99 |
| 17 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 92 | LF |
$50.00 |
$27.00 |
$25.00 |
$30.00 |
$53.86 |
$39.00 |
$37.00 |
$63.56 |
| 18 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$900.00 |
$850.00 |
$1,005.00 |
$1,300.00 |
$1,740.00 |
$750.00 |
$950.00 |
$474.24 |
| 19 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$1,300.00 |
$600.00 |
$1,545.00 |
$1,500.00 |
$2,590.00 |
$850.00 |
$1,840.00 |
$458.04 |
| 20 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$1,000.00 |
$3,000.00 |
$5,750.00 |
$1,500.00 |
$2,000.00 |
$3,700.00 |
$9,500.00 |
$3,072.01 |
| 21 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,601 | SY |
$4.00 |
$2.50 |
$2.50 |
$3.00 |
$1.80 |
$4.60 |
$1.35 |
$1.88 |
| 22 | 619(C) 0924 |
SAWING PAVEMENT | 45 | LF |
$5.00 |
$8.00 |
$9.00 |
$10.00 |
$45.00 |
$5.00 |
$5.00 |
$6.14 |
| 23 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 200 | LF |
$16.00 |
$16.00 |
$16.50 |
$17.00 |
$13.95 |
$16.60 |
$16.00 |
$17.14 |
| 24 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,300.00 |
$2,100.00 |
$2,277.00 |
$2,225.00 |
$2,000.00 |
$2,300.00 |
$2,400.00 |
$2,457.61 |
| 25 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$1,000.00 |
$1,985.00 |
$1,413.50 |
$2,400.00 |
$1,885.00 |
$1,450.00 |
$2,250.00 |
$2,316.30 |
| 26 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 5.18 | SF |
$28.00 |
$35.00 |
$14.00 |
$16.50 |
$20.00 |
$15.50 |
$24.00 |
$24.58 |
| 27 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 12.5 | LF |
$15.00 |
$30.00 |
$12.00 |
$14.00 |
$15.00 |
$13.80 |
$18.00 |
$18.43 |
| 28 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,200 | LF |
$0.2000 |
$0.6200 |
$0.2800 |
$0.3800 |
$0.3100 |
$0.2800 |
$0.4000 |
$0.3800 |
| 29 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 84 | CY |
$16.00 |
$10.00 |
$8.25 |
$10.00 |
$34.00 |
$15.00 |
$12.00 |
$11.09 |
| 30 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 80 | CY |
$20.00 |
$12.00 |
$10.00 |
$10.00 |
$34.00 |
$15.00 |
$18.50 |
$8.48 |
| 31 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 890 | LF |
$190.00 |
$164.25 |
$162.50 |
$165.00 |
$191.00 |
$175.00 |
$195.00 |
$198.13 |
| 32 | 504(B) 1305 |
SAW-CUT GROOVING | 828 | SY |
$5.00 |
$5.05 |
$4.40 |
$7.00 |
$4.05 |
$4.50 |
$6.50 |
$9.22 |
| 33 | 504(C) 6250 |
SEALED EXPANSION JOINT | 35.42 | LF |
$200.00 |
$260.00 |
$235.00 |
$270.00 |
$101.00 |
$220.00 |
$245.00 |
$188.79 |
| 34 | 504(E) 1380 |
CONCRETE RAIL (TR1) | 507 | LF |
$70.00 |
$48.00 |
$66.50 |
$65.00 |
$69.00 |
$95.00 |
$80.00 |
$63.65 |
| 35 | 506(A) 1322 |
STRUCTURAL STEEL | 734 | LB |
$3.00 |
$1.95 |
$3.25 |
$3.50 |
$2.00 |
$3.00 |
$4.00 |
$7.68 |
| 36 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$1,700.00 |
$625.00 |
$840.00 |
$1,000.00 |
$902.00 |
$760.00 |
$960.00 |
$579.59 |
| 37 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$1,700.00 |
$625.00 |
$840.00 |
$1,000.00 |
$902.00 |
$760.00 |
$960.00 |
$579.59 |
| 38 | 509(A) 1326 |
CLASS AA CONCRETE | 204.9 | CY |
$480.00 |
$420.00 |
$480.00 |
$500.00 |
$562.00 |
$580.00 |
$650.00 |
$463.79 |
| 39 | 509(B) 1328 |
CLASS A CONCRETE | 103.5 | CY |
$480.00 |
$420.00 |
$530.00 |
$500.00 |
$615.00 |
$480.00 |
$650.00 |
$430.69 |
| 40 | 511(A) 1332 |
REINFORCING STEEL | 69,240 | LB |
$0.8000 |
$1.02 |
$0.8800 |
$1.00 |
$0.8000 |
$0.9000 |
$1.00 |
$0.9400 |
| 41 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 977 | LF |
$30.00 |
$29.00 |
$23.80 |
$24.00 |
$36.00 |
$25.00 |
$37.00 |
$25.84 |
| 42 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 977 | LF |
$10.00 |
$10.00 |
$10.20 |
$11.00 |
$7.00 |
$18.00 |
$23.00 |
$10.94 |
| 43 | 516(A) 6095 |
DRILLED SHAFTS 54" DIAMETER | 197 | LF |
$530.00 |
$465.00 |
$500.00 |
$550.00 |
$607.00 |
$450.00 |
$590.00 |
$411.96 |
| 44 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,753 | TON |
$25.00 |
$39.00 |
$41.33 |
$40.00 |
$57.00 |
$55.00 |
$53.00 |
$38.22 |
| 45 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 596 | TON |
$30.00 |
$34.00 |
$35.36 |
$33.00 |
$49.00 |
$55.00 |
$46.00 |
$19.69 |
| 46 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$3,000.00 |
$25,000.00 |
$10,500.00 |
$7,000.00 |
$28,700.00 |
$22,000.00 |
$25,000.00 |
$24,576.10 |
| 47 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$3,700.00 |
$4,000.00 |
$4,000.00 |
$2,700.00 |
$4,000.00 |
$3,000.00 |
$3,624.98 |
| 48 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$4,000.00 |
$5,500.00 |
$5,000.00 |
$4,700.00 |
$4,250.00 |
$7,300.00 |
$10,000.00 |
$5,068.82 |
| 49 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$2,800.00 |
$3,400.00 |
$2,500.00 |
$2,000.00 |
$3,200.00 |
$8,000.00 |
$4,300.82 |
| 50 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$25,000.00 |
$40,000.00 |
$23,750.00 |
$40,000.00 |
$37,600.00 |
$51,187.00 |
$18,000.00 |
$61,440.26 |