BRIDGE AND APPROACHES COUNTY ROAD (EW-50): OVER PANTHER CREEK , 3.2 MILES EAST OF I-44. PROJECT LENGTH = 0.198 MILES

Let date
Thursday, August 18, 2011
Contract
110392
J/P numbers
21490(04)
District
Division 8
County
Rogers
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (EW-50): OVER PANTHER CREEK , 3.2 MILES EAST OF I-44. PROJECT LENGTH = 0.198 MILES
Project number
BRO-166D(139)CI

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$520,771
1 B & B BRIDGE COMPANY, LLC Low bidder $456,120 -12.4%
2 BELK BRIDGE, INC. $484,932 -6.9% +6.3%
3 BRIDGECO CONTRACTORS, INC. $499,998 -4.0% +9.6%
5 K & R BUILDERS, INC. $538,987 +3.5% +18.2%
6 OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV) $565,819 +8.7% +24.1%
7 BECCO CONTRACTORS, INC. $616,209 +18.3% +35.1%

Bid tab: unit prices 46 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 B & B BRIDGE CO…#2 BELK BRIDGE, IN…#3 BRIDGECO CONTRA…#5 K & R BUILDERS,…#6 OBC, INC./PLAIN…#7 BECCO CONTRACTO…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $5,000.00 $5,000.00 $5,800.00 $5,500.00 $7,840.00 $5,200.00 $15,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION2,305CY $5.00 $3.75 $5.75 $4.80 $5.84 $5.20 $6.00
3202(D) 0184 UNCLASSIFIED BORROW2,750CY $7.00 $6.00 $9.00 $6.75 $7.40 $12.48 $9.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $5,000.00 $4,000.00 $4,000.00 $3,600.00 $4,540.00 $8,320.00 $10,000.00
5221(C) 2801 TEMPORARY SILT FENCE2,000LF $2.00 $1.55 $1.55 $1.10 $1.25 $2.96 $2.00
6221(F) 0100 TEMPORARY SILT DIKE200LF $8.00 $7.00 $7.00 $5.00 $8.00 $19.84 $8.00
7230(A) 2806 SOLID SLAB SODDING5,000SY $2.50 $1.40 $1.40 $1.75 $1.43 $1.91 $1.35
8233(A) 2817 VEGETATIVE MULCHING2.1AC $750.00 $600.00 $630.00 $245.00 $300.00 $717.60 $250.00
9303(B) 2110 AGGREGATE BASE TYPE B800CY $40.00 $32.30 $36.00 $50.25 $51.00 $41.60 $45.00
10402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E45TON $35.00 $17.00 $24.00 $25.00 $25.00 $36.40 $24.00
11407(B) 0250 TACK COAT120GAL $5.00 $2.31 $2.50 $2.75 $2.60 $2.60 $4.00
12408 5774 PRIME COAT1,060GAL $6.00 $7.24 $7.00 $8.00 $8.00 $7.28 $4.00
13411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)633TON $90.00 $96.72 $81.00 $115.00 $110.00 $84.24 $80.00
14509(D) 0325 CLASS C CONCRETE10CY $250.00 $200.00 $220.00 $200.00 $242.00 $203.22 $330.00
15613(B) 0689 18" CORR. GALV. STEEL PIPE56LF $28.00 $23.25 $40.00 $19.50 $21.50 $34.32 $58.00
16613(B) 0690 24" CORR. GALV. STEEL PIPE86LF $30.00 $27.50 $50.00 $22.40 $23.50 $36.40 $64.00
17613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND4EA $750.00 $275.00 $300.00 $150.00 $212.50 $780.00 $420.00
18613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND4EA $800.00 $310.00 $350.00 $176.50 $237.50 $832.00 $520.00
19619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $5,000.00 $1,000.00 $2,000.00 $500.00 $5,000.00 $5,200.00 $4,000.00
20619(B) 4728 REMOVAL OF ASPHALT PAVEMENT2,090SY $4.00 $3.00 $5.00 $3.00 $5.00 $3.64 $4.00
21619(C) 0924 SAWING PAVEMENT40LF $5.00 $5.00 $10.00 $6.00 $10.25 $5.20 $10.00
22623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE250LF $17.00 $15.00 $15.00 $18.00 $16.90 $20.80 $17.00
23623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,000.00 $2,200.00 $2,200.00 $2,300.00 $2,410.00 $2,444.00 $2,400.00
24501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON90CY $12.00 $22.50 $15.00 $10.00 $7.84 $21.60 $25.00
25501(G) 6309 CLSM BACKFILL102CY $100.00 $93.00 $100.00 $120.00 $129.00 $127.42 $90.00
26503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)317LF $195.00 $185.00 $190.00 $171.61 $183.50 $177.46 $205.00
27504(A) 1304 APPROACH SLAB108SY $170.00 $125.00 $100.00 $220.00 $141.00 $111.49 $178.00
28504(D) 6239 CONCRETE RAIL (TR3)225LF $60.00 $55.00 $85.00 $60.00 $62.35 $58.07 $97.00
29506(A) 1322 STRUCTURAL STEEL1,880LB $2.75 $2.15 $4.30 $1.40 $3.08 $3.13 $3.00
30507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY8EA $750.00 $650.00 $700.00 $480.00 $600.00 $411.33 $500.00
31509(A) 1326 CLASS AA CONCRETE76CY $450.00 $375.00 $400.00 $400.00 $465.00 $489.05 $700.00
32509(B) 1328 CLASS A CONCRETE89CY $300.00 $375.00 $400.00 $400.00 $484.00 $484.47 $700.00
33511(A) 1332 REINFORCING STEEL30,272LB $0.8000 $0.8000 $1.00 $0.9400 $0.8600 $1.02 $1.50
34514(A) 6010 PILES, FURNISHED (HP 10X42)298LF $25.00 $30.00 $18.00 $27.57 $35.35 $31.12 $50.00
35514(B) 6292 PILES, DRIVEN (HP 10X42)298LF $10.00 $23.50 $9.00 $18.00 $15.15 $16.20 $15.00
36601(B) 1353 TYPE I-A PLAIN RIPRAP1,100TON $25.00 $27.00 $33.50 $27.00 $29.00 $32.16 $35.00
37601(C) 1355 TYPE I-A FILTER BLANKET220TON $20.00 $30.00 $28.00 $26.00 $22.60 $26.79 $30.00
38601(I) 6312 FILTER FABRIC (RIPRAP)900SY $2.50 $2.50 $1.25 $2.00 $2.92 $2.63 $2.00
39613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND60LF $25.00 $20.00 $40.00 $25.00 $24.25 $24.58 $30.00
40613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.60LF $25.00 $20.00 $30.00 $10.00 $24.25 $24.58 $25.00
41619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $10,000.00 $5,000.00 $6,500.00 $4,475.00 $4,340.00 $12,420.00 $4,000.00
42855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)4,200LF $0.6000 $0.5000 $0.5000 $0.7000 $0.6000 $0.8900 $0.5500
43880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $3,000.00 $2,800.00 $2,800.00 $3,500.00 $3,150.00 $2,310.00 $3,000.00
44642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $3,000.00 $2,500.00 $3,000.00 $6,800.00 $10,050.00 $6,875.00 $5,000.00
45220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $2,000.00 $2,250.00 $1,500.00 $3,050.00 $2,100.00 $3,000.00
46641 1399 MOBILIZATION1LSUM $45,448.00 $22,750.00 $14,000.00 $21,000.00 $26,500.00 $42,482.20 $30,000.00