| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$6,600.00 |
$9,330.00 |
$17,000.00 |
$5,000.00 |
$18,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,010 | CY |
$6.00 |
$5.15 |
$4.70 |
$4.36 |
$5.00 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 5,833 | CY |
$8.00 |
$5.85 |
$4.80 |
$4.08 |
$7.00 |
$10.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$3,870.00 |
$3,700.00 |
$4,600.00 |
$3,848.00 |
$3,500.00 |
$7,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,650 | LF |
$3.00 |
$1.30 |
$1.17 |
$1.18 |
$3.00 |
$3.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 288 | LF |
$8.00 |
$6.95 |
$6.25 |
$7.40 |
$6.00 |
$8.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 5,566 | SY |
$3.25 |
$1.45 |
$1.39 |
$1.34 |
$2.00 |
$1.22 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.6 | AC |
$600.00 |
$500.00 |
$450.00 |
$717.60 |
$300.00 |
$1,300.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 860 | CY |
$36.00 |
$49.00 |
$55.00 |
$50.96 |
$50.00 |
$46.00 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 3,238 | SY |
$2.00 |
$2.00 |
$2.75 |
$1.61 |
$2.00 |
$1.40 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 175 | TON |
$30.00 |
$21.55 |
$27.50 |
$22.41 |
$30.00 |
$25.00 |
| 12 | 408 5774 |
PRIME COAT | 1,299 | GAL |
$6.00 |
$5.75 |
$6.30 |
$5.98 |
$7.00 |
$4.50 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 483 | TON |
$85.00 |
$96.50 |
$107.00 |
$100.36 |
$110.00 |
$120.00 |
| 14 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 205 | TON |
$25.00 |
$31.75 |
$33.31 |
$38.48 |
$45.00 |
$40.00 |
| 15 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 156 | LF |
$40.00 |
$24.25 |
$21.00 |
$24.86 |
$30.00 |
$38.00 |
| 16 | 613(P) 4571 |
28" X 20" GALV. STEEL CULVERT END SECTION ARCH | 10 | EA |
$420.00 |
$209.00 |
$230.00 |
$215.43 |
$250.00 |
$235.00 |
| 17 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 4,600 | LF |
$0.2500 |
$0.2400 |
$0.2800 |
$0.2400 |
$0.2500 |
$0.2400 |
| 18 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 92 | CY |
$10.00 |
$8.00 |
$8.00 |
$16.50 |
$10.00 |
$8.20 |
| 19 | 501(G) 6309 |
CLSM BACKFILL | 92 | CY |
$150.00 |
$116.00 |
$132.50 |
$115.02 |
$125.00 |
$118.00 |
| 20 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 336.67 | LF |
$225.00 |
$198.00 |
$183.00 |
$197.96 |
$200.00 |
$200.00 |
| 21 | 504(A) 1304 |
APPROACH SLAB | 116.4 | SY |
$150.00 |
$145.00 |
$145.00 |
$108.46 |
$145.00 |
$146.00 |
| 22 | 504(E) 1380 |
CONCRETE RAIL (TR1) | 235 | LF |
$55.00 |
$54.00 |
$59.00 |
$56.21 |
$65.00 |
$55.00 |
| 23 | 506(A) 1322 |
STRUCTURAL STEEL | 130 | LB |
$4.00 |
$2.95 |
$4.12 |
$3.20 |
$2.00 |
$3.00 |
| 24 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$740.00 |
$710.00 |
$1,020.00 |
$935.67 |
$1,000.00 |
$720.00 |
| 25 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$740.00 |
$710.00 |
$1,020.00 |
$935.67 |
$1,000.00 |
$720.00 |
| 26 | 509(A) 1326 |
CLASS AA CONCRETE | 68 | CY |
$450.00 |
$425.00 |
$454.00 |
$499.25 |
$450.00 |
$430.00 |
| 27 | 509(B) 1328 |
CLASS A CONCRETE | 55.2 | CY |
$425.00 |
$410.00 |
$474.00 |
$495.14 |
$450.00 |
$415.00 |
| 28 | 511(A) 1332 |
REINFORCING STEEL | 23,010 | LB |
$1.20 |
$0.8500 |
$0.8300 |
$1.04 |
$0.9000 |
$0.8700 |
| 29 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,086 | LF |
$25.00 |
$25.25 |
$23.80 |
$22.09 |
$30.00 |
$25.50 |
| 30 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,086 | LF |
$10.00 |
$8.00 |
$10.20 |
$12.64 |
$15.00 |
$8.10 |
| 31 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,060 | TON |
$25.00 |
$31.75 |
$30.50 |
$36.60 |
$38.00 |
$35.00 |
| 32 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 285 | TON |
$20.00 |
$24.40 |
$24.24 |
$28.86 |
$35.00 |
$25.00 |
| 33 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$15.00 |
$16.00 |
$25.50 |
$24.24 |
$20.00 |
$16.25 |
| 34 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$15.00 |
$15.00 |
$25.50 |
$29.85 |
$10.00 |
$15.25 |
| 35 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$2,000.00 |
$3,200.00 |
$3,920.00 |
$3,520.00 |
$5,000.00 |
$12,000.00 |
| 36 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,500.00 |
$2,000.00 |
$2,200.00 |
$2,310.00 |
$2,200.00 |
$2,100.00 |
| 37 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,000.00 |
$2,550.00 |
$2,950.00 |
$2,805.00 |
$3,500.00 |
$7,500.00 |
| 38 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$2,000.00 |
$6,160.00 |
$6,700.00 |
$6,776.00 |
$4,000.00 |
$9,000.00 |
| 39 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$2,200.00 |
$2,060.00 |
$1,500.00 |
$4,000.00 |
| 40 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$22,000.00 |
$22,000.00 |
$16,670.00 |
$25,000.00 |
$10,000.00 |
$27,000.00 |
| 41 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,439 | LF |
$5.00 |
$3.44 |
$4.00 |
$3.66 |
$4.00 |
$5.00 |