| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$19,900.00 |
$25,000.00 |
$14,387.46 |
$20,590.75 |
$15,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 14,730.5 | CY |
$4.00 |
$8.25 |
$8.00 |
$9.19 |
$12.86 |
$15.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 3,630 | CY |
$5.50 |
$1.15 |
$0.2500 |
$1.00 |
$15.00 |
$15.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$10,200.00 |
$20,000.00 |
$24,984.57 |
$28,054.33 |
$28,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,500 | LF |
$2.00 |
$2.00 |
$2.00 |
$2.50 |
$2.80 |
$3.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 450 | LF |
$12.00 |
$6.60 |
$5.00 |
$7.38 |
$9.44 |
$5.00 |
| 7 | 221(H) 0450 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 17 | EA |
$48.00 |
$155.00 |
$50.00 |
$216.59 |
$211.10 |
$300.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 15,676.6 | SY |
$2.00 |
$1.20 |
$1.25 |
$1.31 |
$1.14 |
$1.50 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 6,871.6 | CY |
$35.00 |
$31.50 |
$35.00 |
$39.89 |
$34.51 |
$40.00 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 27,486.2 | SY |
$1.50 |
$1.10 |
$1.30 |
$1.42 |
$1.52 |
$1.25 |
| 11 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 27,000 | SY |
$3.50 |
$2.10 |
$2.50 |
$3.10 |
$2.68 |
$3.00 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 572 | TON |
$22.00 |
$26.00 |
$20.00 |
$16.87 |
$28.66 |
$20.00 |
| 13 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 7,798.5 | TON |
$60.00 |
$63.50 |
$54.00 |
$62.43 |
$64.83 |
$59.50 |
| 14 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 3,968.9 | TON |
$70.00 |
$74.90 |
$65.00 |
$78.78 |
$76.00 |
$75.00 |
| 15 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 39.5 | CY |
$450.00 |
$450.00 |
$750.00 |
$559.22 |
$602.93 |
$600.00 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$270.00 |
$315.00 |
$300.00 |
$307.97 |
$829.03 |
$825.00 |
| 17 | 511(A) 0332 |
REINFORCING STEEL | 4,794 | LB |
$1.00 |
$1.00 |
$2.00 |
$0.5700 |
$1.00 |
$1.00 |
| 18 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 36.25 | TON |
$50.00 |
$51.00 |
$35.00 |
$33.83 |
$31.15 |
$31.00 |
| 19 | 609(B) 0384 |
COMBINED CURB & GUTTER (8" BARRIER) | 6,949 | LF |
$12.00 |
$13.65 |
$12.00 |
$27.71 |
$12.91 |
$14.00 |
| 20 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 2,294 | SY |
$40.00 |
$33.00 |
$40.00 |
$28.04 |
$33.92 |
$37.00 |
| 21 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 1,168.6 | SY |
$55.00 |
$37.50 |
$60.00 |
$33.17 |
$42.96 |
$47.00 |
| 22 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 500 | SF |
$28.00 |
$20.00 |
$20.00 |
$19.05 |
$20.10 |
$22.00 |
| 23 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 1 | EA |
$5,000.00 |
$2,111.00 |
$3,000.00 |
$2,450.00 |
$2,110.27 |
$2,100.00 |
| 24 | 611(A) 2659 |
MANHOLE (6' DIAMETER) | 1 | EA |
$6,000.00 |
$2,500.00 |
$4,000.00 |
$2,700.00 |
$2,612.71 |
$2,600.00 |
| 25 | 611(A) 2661 |
MANHOLE (8' DIA.METER) | 3 | EA |
$8,000.00 |
$4,900.00 |
$6,000.00 |
$5,300.00 |
$4,220.54 |
$4,200.00 |
| 26 | 611(C) 4215 |
REPLACEMENT OF MANHOLE FRAME & COVER | 10 | EA |
$350.00 |
$491.00 |
$500.00 |
$650.00 |
$351.71 |
$350.00 |
| 27 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 1 | EA |
$1,500.00 |
$3,080.00 |
$3,500.00 |
$1,800.00 |
$2,813.69 |
$2,400.00 |
| 28 | 611(G) 5113 |
INLET CI DES. 2 (B) | 1 | EA |
$2,600.00 |
$3,322.00 |
$5,200.00 |
$1,900.00 |
$3,014.67 |
$2,750.00 |
| 29 | 611(G) 5115 |
INLET CI DES. 2 (D) | 4 | EA |
$2,500.00 |
$3,780.00 |
$6,400.00 |
$2,150.00 |
$4,120.05 |
$4,100.00 |
| 30 | 611(G) 5116 |
INLET CI DES. 2 (2C) | 2 | EA |
$2,700.00 |
$4,555.00 |
$8,000.00 |
$2,950.00 |
$5,727.87 |
$4,900.00 |
| 31 | 611(G) 5117 |
INLET CI DES. 2 (2B) | 2 | EA |
$1.00 |
$3,925.00 |
$7,000.00 |
$2,150.00 |
$4,421.52 |
$4,000.00 |
| 32 | 611(G) 5119 |
INLET CI DES. 2 (2D) | 1 | EA |
$4,000.00 |
$6,000.00 |
$9,900.00 |
$4,600.00 |
$6,833.25 |
$5,800.00 |
| 33 | 611(G) 5327 |
INLET GPI TYPE 1 (DES. 1) | 3 | EA |
$3,000.00 |
$2,000.00 |
$3,700.00 |
$1,750.00 |
$2,813.69 |
$2,800.00 |
| 34 | 611(G) 5329 |
INLET GPI TYPE 1 (DES. 3) | 1 | EA |
$3,200.00 |
$2,030.00 |
$3,700.00 |
$1,800.00 |
$2,813.69 |
$2,800.00 |
| 35 | 611(G) 5336 |
INLET GPI TYPE 2 (DES. 10) | 1 | EA |
$4,000.00 |
$2,375.00 |
$4,100.00 |
$2,350.00 |
$2,813.69 |
$2,800.00 |
| 36 | 611(G) 5974 |
INLET W/SMALL JCT. BOX, CI, DES.2(D) | 5 | EA |
$4,800.00 |
$5,300.00 |
$9,700.00 |
$4,950.00 |
$5,325.91 |
$5,000.00 |
| 37 | 611(G) 5980 |
INLET W/SMALL JCT. BOX, CI, DES.2(2D) | 1 | EA |
$5,800.00 |
$5,740.00 |
$13,000.00 |
$5,850.00 |
$7,637.16 |
$6,700.00 |
| 38 | 611(G) 5992 |
INLET W/SMALL JCT. BOX, CI, DES.3(2D) | 1 | EA |
$6,000.00 |
$9,200.00 |
$15,000.00 |
$6,050.00 |
$14,168.94 |
$6,900.00 |
| 39 | 611(I) 4488 |
REPLACEMENT OFINLET FRM&GRT (SSIF-FRM,CIG-GRT-VG-F) | 38 | EA |
$350.00 |
$475.00 |
$500.00 |
$1,100.00 |
$401.96 |
$300.00 |
| 40 | 612(E) 0647 |
VALVE BOXES ADJUST TO GRADE | 2 | EA |
$250.00 |
$215.00 |
$200.00 |
$275.00 |
$301.47 |
$300.00 |
| 41 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 1,588 | LF |
$45.00 |
$56.00 |
$55.00 |
$47.00 |
$50.24 |
$50.00 |
| 42 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 300 | LF |
$60.00 |
$60.60 |
$61.00 |
$53.00 |
$57.28 |
$57.00 |
| 43 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 353 | LF |
$75.00 |
$76.00 |
$71.00 |
$70.00 |
$71.35 |
$71.00 |
| 44 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 312 | LF |
$90.00 |
$85.50 |
$80.00 |
$98.00 |
$78.38 |
$78.00 |
| 45 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 122 | LF |
$110.00 |
$137.00 |
$100.00 |
$120.00 |
$127.62 |
$127.00 |
| 46 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 6,700 | LF |
$5.00 |
$5.55 |
$4.00 |
$5.91 |
$5.33 |
$8.00 |
| 47 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 200 | LF |
$150.00 |
$14.00 |
$4.00 |
$9.37 |
$10.85 |
$8.00 |
| 48 | 613(O) 4373 |
SPECIAL END SECTION OF 18" RCP ROUND | 1 | EA |
$600.00 |
$555.00 |
$600.00 |
$550.00 |
$698.40 |
$695.00 |
| 49 | 613(O) 4379 |
SPECIAL END SECTION OF 36" RCP ROUND | 2 | EA |
$1,500.00 |
$1,070.00 |
$1,100.00 |
$1,050.00 |
$1,165.67 |
$1,160.00 |
| 50 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$39,400.00 |
$30,000.00 |
$20,124.69 |
$37,882.26 |
$20,000.00 |
| 51 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 9,668 | SY |
$6.00 |
$1.65 |
$2.00 |
$3.33 |
$2.05 |
$5.50 |
| 52 | 619(B) 6118 |
REMOVAL OF PAVING BRICK ROADWAY | 2,620 | SY |
$10.00 |
$6.70 |
$5.00 |
$6.76 |
$6.76 |
$8.00 |
| 53 | 619(C) 0924 |
SAWING PAVEMENT | 613 | LF |
$1.50 |
$4.00 |
$2.00 |
$2.12 |
$4.58 |
$3.00 |
| 54 | 626(A) 1257 |
MONUMENTS | 1 | EA |
$1,000.00 |
$1,000.00 |
$800.00 |
$1,000.00 |
$989.16 |
$500.00 |
| 55 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 2,000 | LF |
$0.1600 |
$0.5300 |
$0.5500 |
$0.5800 |
$0.5000 |
$0.5500 |
| 56 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 2,000 | EA |
$0.5600 |
$1.05 |
$1.10 |
$1.16 |
$1.00 |
$1.10 |
| 57 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,000 | LF |
$0.1400 |
$0.5300 |
$0.5500 |
$0.5800 |
$0.5000 |
$0.5500 |
| 58 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,060 | SD |
$0.2200 |
$0.1100 |
$0.1100 |
$0.1200 |
$0.1000 |
$0.1100 |
| 59 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 6,120 | SD |
$0.6300 |
$0.1100 |
$0.1100 |
$0.1200 |
$0.1000 |
$0.1100 |
| 60 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,600 | SD |
$0.8500 |
$2.12 |
$2.20 |
$2.32 |
$2.01 |
$2.20 |
| 61 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,580 | SD |
$0.4900 |
$0.8000 |
$0.8500 |
$0.8700 |
$0.7500 |
$0.8000 |
| 62 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$0.7100 |
$1.05 |
$1.10 |
$1.16 |
$1.00 |
$1.10 |
| 63 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 14,760 | SD |
$0.1100 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.0600 |
| 64 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 2,520 | SD |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0500 |
$0.0600 |
| 65 | 880(F) 8878 |
DRUMS | 2,520 | SD |
$0.1100 |
$0.1100 |
$0.1100 |
$0.1200 |
$0.1000 |
$0.1100 |
| 66 | 880(G) 8890 |
CHANNELIZER CONES | 22,320 | SD |
$0.1100 |
$0.1100 |
$0.1100 |
$0.1200 |
$0.1000 |
$0.1100 |
| 67 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 360 | SD |
$13.05 |
$5.30 |
$5.00 |
$5.81 |
$5.02 |
$5.50 |
| 68 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 197.29 | SF |
$12.00 |
$11.70 |
$12.00 |
$12.78 |
$11.05 |
$12.00 |
| 69 | 851(C) 8321 |
1 3/4" SQUARE TUBE POST | 390 | LF |
$7.00 |
$8.50 |
$9.00 |
$9.30 |
$8.04 |
$8.80 |
| 70 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 10,106.8 | LF |
$0.5000 |
$1.05 |
$1.10 |
$1.16 |
$1.00 |
$1.10 |
| 71 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 7 | EA |
$80.00 |
$90.29 |
$100.00 |
$98.79 |
$85.42 |
$94.00 |
| 72 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$20,200.00 |
$24,000.00 |
$20,000.00 |
$19,997.30 |
$20,900.00 |
| 73 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$3,000.00 |
$2,905.39 |
$700.68 |
$1,500.00 |
| 74 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$6,200.00 |
$5,000.00 |
$5,000.00 |
$4,204.08 |
$5,000.00 |
| 75 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$75,000.00 |
$28,600.00 |
$135,000.00 |
$69,407.46 |
$81,054.00 |
$40,000.00 |