| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$100,000.00 |
$25,000.00 |
$45,000.00 |
$1,900.00 |
$105,345.85 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 65,302 | CY |
$4.00 |
$3.50 |
$7.00 |
$12.55 |
$8.32 |
| 3 | 202(C) 0184 |
UNCLASSIFIED BORROW | 27,479 | CY |
$5.50 |
$5.50 |
$8.00 |
$13.63 |
$7.75 |
| 4 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$65,000.00 |
$25,000.00 |
$95,000.00 |
$250,633.19 |
$122,248.61 |
| 5 | 222 2801 |
TEMPORARY BALE BARRIER | 1,425 | LF |
$4.00 |
$3.92 |
$2.66 |
$3.94 |
$2.66 |
| 6 | 223 2801 |
TEMPORARY SILT FENCE | 10,285 | LF |
$2.25 |
$1.86 |
$1.65 |
$1.87 |
$1.65 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 10,800 | LF |
$2.25 |
$1.86 |
$2.34 |
$1.87 |
$2.34 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 12,939 | SY |
$2.25 |
$2.48 |
$3.00 |
$2.49 |
$2.13 |
| 9 | 230(F) 2812 |
WATERING | 3,494 | MGAL |
$14.00 |
$9.80 |
$6.39 |
$9.84 |
$6.38 |
| 10 | 232(B) 2814 |
SEEDING METHOD B | 27.05 | AC |
$500.00 |
$361.21 |
$213.00 |
$362.68 |
$212.55 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 61.42 | AC |
$645.00 |
$258.01 |
$319.50 |
$259.06 |
$318.83 |
| 12 | 233(C) 2819 |
ASPHALT MULCHING | 40,586 | GAL |
$4.00 |
$2.66 |
$3.73 |
$2.67 |
$3.72 |
| 13 | 234(A) 2824 |
FERTILIZING (10-20-10) | 8.05 | TON |
$650.00 |
$670.83 |
$639.00 |
$673.56 |
$637.65 |
| 14 | 241 2832 |
MOWING | 30.71 | AC |
$60.00 |
$103.20 |
$53.25 |
$103.62 |
$53.14 |
| 15 | 327(K) 4300 |
(SP)STABILIZED SUBGRADE | 59,729 | SY |
$5.00 |
$7.90 |
$5.75 |
$5.53 |
$7.10 |
| 16 | 403(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 445 | TON |
$35.00 |
$64.33 |
$44.39 |
$61.80 |
$44.20 |
| 17 | 407 0250 |
TACK COAT | 2,330 | GAL |
$3.60 |
$4.00 |
$2.62 |
$2.53 |
$2.66 |
| 18 | 408 5774 |
PRIME COAT | 22,070 | GAL |
$5.00 |
$1.50 |
$4.45 |
$6.80 |
$6.38 |
| 19 | 411(S2) 5930 |
(SP)ASPHALT CONCRETE TYPE S2(PG 64-22 OK) | 1,438 | TON |
$57.00 |
$103.85 |
$76.68 |
$74.16 |
$89.28 |
| 20 | 411(S3) 5940 |
(SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) | 581 | TON |
$67.00 |
$110.60 |
$90.92 |
$87.93 |
$111.59 |
| 21 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 12,963 | TON |
$60.00 |
$105.00 |
$70.97 |
$68.64 |
$81.30 |
| 22 | 411(S3) 6210 |
(SP)ASPHALT CONCRETE TYPE S3(PATCHING)(PG 64-22 OK) | 94 | TON |
$110.00 |
$152.50 |
$129.55 |
$125.28 |
$185.98 |
| 23 | 411(S4) 5955 |
(SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | 440 | TON |
$72.00 |
$129.25 |
$100.09 |
$96.80 |
$119.02 |
| 24 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 3,501 | TON |
$66.00 |
$101.35 |
$81.50 |
$78.82 |
$97.78 |
| 25 | 413(D) 4868 |
(SP)RUMBLE STRIP-METHOD PCC-CON | 16,576 | LF |
$0.2500 |
$0.3500 |
$0.7500 |
$0.8500 |
$0.7800 |
| 26 | 414(A1) 5760 |
11" P.C. DOWEL JOINTED CONCRETE PAVEMENT | 51,106 | SY |
$44.00 |
$44.45 |
$48.00 |
$43.41 |
$47.49 |
| 27 | 414(A1) 6853 |
8.5" P.C. DOWEL JOINTED CONCRETE PAVEMENT | 30,452 | SY |
$36.00 |
$37.95 |
$39.00 |
$36.83 |
$39.91 |
| 28 | 501(G) 6315 |
CLSM BACKFILL | 4.6 | CY |
$200.00 |
$564.65 |
$165.97 |
$204.19 |
$239.10 |
| 29 | 509(B) 0321 |
CLASS A CONCRETE | 61.8 | CY |
$350.00 |
$204.34 |
$692.25 |
$204.19 |
$235.40 |
| 30 | 509(D) 0325 |
CLASS C CONCRETE | 570 | CY |
$270.00 |
$204.34 |
$284.36 |
$190.00 |
$283.52 |
| 31 | 611(E) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$3,500.00 |
$1,430.41 |
$1,278.00 |
$1,429.30 |
$5,348.40 |
| 32 | 611(L) 4210 |
DROP INLET GRATE (SMD-TYPE 2) | 1 | EA |
$1,200.00 |
$623.25 |
$1,278.00 |
$622.77 |
$519.22 |
| 33 | 613(B) 0492 |
24" R.C.PIPE CLASS III | 402 | LF |
$55.00 |
$95.00 |
$69.87 |
$81.67 |
$58.30 |
| 34 | 613(B) 0493 |
30" R.C.PIPE CLASS III | 534 | LF |
$75.00 |
$106.50 |
$78.57 |
$95.97 |
$71.60 |
| 35 | 613(B) 0494 |
36" R.C.PIPE CLASS III | 586 | LF |
$90.00 |
$125.00 |
$90.53 |
$111.28 |
$89.75 |
| 36 | 613(CC) 6105 |
(PL)SPEC. TRIPLE CULV. END TREATMENT | 1 | EA |
$5,000.00 |
$3,882.54 |
$3,993.75 |
$3,879.53 |
$3,234.21 |
| 37 | 613(CC) 6115 |
SPECIAL TRIPLE CULV.END TRT.(6:1SLP) | 3 | EA |
$5,000.00 |
$3,678.19 |
$5,058.75 |
$3,675.34 |
$3,704.97 |
| 38 | 613(CC) 6123 |
3-30" CULVERT END TREATMENT(RC-GR) | 1 | EA |
$5,000.00 |
$2,656.47 |
$4,792.50 |
$2,654.41 |
$3,247.36 |
| 39 | 613(CC) 7187 |
TYPE B4 CULVERT END TREATMENT | 3 | EA |
$800.00 |
$817.38 |
$1,863.75 |
$816.74 |
$2,262.13 |
| 40 | 613(CC) 7189 |
TYPE D4 CULVERT END TREATMENT | 1 | EA |
$1,500.00 |
$1,226.06 |
$2,396.25 |
$1,225.11 |
$3,504.14 |
| 41 | 613(CC) 7193 |
TYPE CC4 CULVERT END TREATMENT | 3 | EA |
$2,250.00 |
$1,021.72 |
$2,928.75 |
$1,020.93 |
$3,264.29 |
| 42 | 613(CC) 7197 |
TYPE B6 CULVERT END TREATMENT | 1 | EA |
$1,800.00 |
$817.38 |
$2,396.25 |
$816.74 |
$2,401.22 |
| 43 | 613(CC) 7198 |
TYPE C6 CULVERT END TREATMENT | 18 | EA |
$2,500.00 |
$1,226.06 |
$2,662.50 |
$1,225.11 |
$3,257.71 |
| 44 | 613(CC) 7199 |
TYPE D6 CULVERT END TREATMENT | 1 | EA |
$2,000.00 |
$1,430.41 |
$2,928.75 |
$1,429.30 |
$3,346.33 |
| 45 | 613(CC) 7203 |
TYPE CC6 CULVERT END TREATMENT | 1 | EA |
$2,500.00 |
$2,043.44 |
$3,461.25 |
$2,041.86 |
$3,472.38 |
| 46 | 613(D) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 698 | LF |
$65.00 |
$51.09 |
$49.05 |
$51.05 |
$61.26 |
| 47 | 613(P) 1091 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 200 | LF |
$15.00 |
$10.22 |
$7.50 |
$15.31 |
$8.04 |
| 48 | 613(Q) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$10.00 |
$10.22 |
$7.50 |
$10.21 |
$8.04 |
| 49 | 613(R) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 45 | CY |
$30.00 |
$35.76 |
$30.00 |
$35.73 |
$51.39 |
| 50 | 613(S) 1180 |
TRENCH EXCAVATION | 1,084 | CY |
$12.00 |
$8.17 |
$12.00 |
$8.17 |
$0.0800 |
| 51 | 613(T) 1181 |
STANDARD BEDDING MATERIAL | 639 | CY |
$50.00 |
$20.43 |
$30.00 |
$20.42 |
$18.03 |
| 52 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$45,000.00 |
$18,000.00 |
$4,605.79 |
$5,832.79 |
| 53 | 619(B) 0291 |
REMOVAL OF HEADWALL | 1 | EA |
$1,250.00 |
$2,554.30 |
$1,200.00 |
$2,552.32 |
$635.32 |
| 54 | 619(B) 4725 |
REMOVAL OF FENCE | 25,577 | LF |
$1.50 |
$0.4800 |
$2.25 |
$0.4900 |
$0.5000 |
| 55 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 59,289 | SY |
$5.00 |
$6.09 |
$5.00 |
$3.34 |
$3.72 |
| 56 | 619(B) 4780 |
REMOVAL OF GUARD RAIL | 1,245 | LF |
$6.00 |
$1.99 |
$2.25 |
$4.00 |
$2.07 |
| 57 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 494 | LF |
$20.00 |
$20.00 |
$35.00 |
$18.38 |
$12.82 |
| 58 | 619(C) 0924 |
SAWING PAVEMENT | 7,158 | LF |
$6.50 |
$5.00 |
$2.87 |
$2.00 |
$1.65 |
| 59 | 624(C) 4459 |
(SP)FENCE-STYLE SWF (5 BARBED WIRE) | 28,018 | LF |
$4.00 |
$2.06 |
$4.33 |
$2.10 |
$2.15 |
| 60 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$100.00 |
$30.95 |
$106.50 |
$104.13 |
$216.07 |
| 61 | 629(C) 4960 |
MAILBOX | 1 | EA |
$30.00 |
$77.36 |
$26.63 |
$26.03 |
$55.02 |
| 62 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 850 | CY |
$12.00 |
$5.11 |
$5.33 |
$5.10 |
$5.31 |
| 63 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 177 | CY |
$20.00 |
$7.15 |
$3.20 |
$7.15 |
$5.31 |
| 64 | 509(A) 1326 |
CLASS AA CONCRETE | 387.7 | CY |
$550.00 |
$275.00 |
$425.00 |
$250.13 |
$300.76 |
| 65 | 511(A) 1332 |
REINFORCING STEEL | 51,020 | LB |
$1.00 |
$0.8700 |
$0.9100 |
$0.8700 |
$0.6400 |
| 66 | 619(B) 2500 |
(PL)REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$4,000.00 |
$16,150.00 |
$2,130.00 |
$6,125.57 |
$807.70 |
| 67 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 280 | CY |
$15.00 |
$10.52 |
$5.33 |
$10.52 |
$5.31 |
| 68 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 109 | CY |
$20.00 |
$12.26 |
$3.20 |
$12.25 |
$5.31 |
| 69 | 509(A) 1326 |
CLASS AA CONCRETE | 299.9 | CY |
$550.00 |
$275.00 |
$425.00 |
$250.13 |
$317.77 |
| 70 | 511(A) 1332 |
REINFORCING STEEL | 42,240 | LB |
$1.00 |
$0.8700 |
$0.9100 |
$0.8700 |
$0.6400 |
| 71 | 619(B) 2500 |
(PL)REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$3,000.00 |
$15,110.00 |
$2,130.00 |
$5,104.64 |
$4,665.49 |
| 72 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 86 | SF |
$20.00 |
$31.98 |
$17.04 |
$31.95 |
$17.00 |
| 73 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 126.6 | LF |
$12.00 |
$9.80 |
$10.65 |
$9.79 |
$10.63 |
| 74 | 854(C) 8525 |
(SP)TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 4 | EA |
$250.00 |
$412.61 |
$350.00 |
$412.00 |
$265.69 |
| 75 | 854(C) 8530 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 54,540 | LF |
$0.4000 |
$0.5000 |
$1.50 |
$0.4900 |
$0.6000 |
| 76 | 856(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 30,296 | LF |
$0.2500 |
$0.3000 |
$1.50 |
$0.3000 |
$0.2700 |
| 77 | 856(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 1,000 | LF |
$0.7500 |
$0.6200 |
$1.07 |
$2.06 |
$1.06 |
| 78 | 856(G) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 1,000 | EA |
$0.5500 |
$0.4300 |
$1.07 |
$2.06 |
$1.06 |
| 79 | 859(A) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 30,296 | LF |
$0.2500 |
$0.0800 |
$0.2700 |
$0.0800 |
$0.2700 |
| 80 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,000 | SD |
$0.5000 |
$0.6200 |
$2.13 |
$0.6200 |
$2.13 |
| 81 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,500 | SD |
$2.30 |
$0.3100 |
$2.13 |
$0.3100 |
$2.13 |
| 82 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,000 | SD |
$3.35 |
$0.0200 |
$2.13 |
$0.0200 |
$2.13 |
| 83 | 880(B) 8827 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 1,000 | SD |
$3.50 |
$0.0200 |
$2.13 |
$0.0200 |
$2.13 |
| 84 | 880(C) 8836 |
BARRICADES(TYPE II) | 400 | SD |
$0.2500 |
$0.0200 |
$0.2700 |
$0.0200 |
$0.2700 |
| 85 | 880(C) 8842 |
BARRICADES(TYPE III) | 1,000 | SD |
$2.50 |
$0.0200 |
$1.07 |
$0.0200 |
$1.06 |
| 86 | 880(C) 8848 |
WING BARRICADES | 1,000 | SD |
$1.00 |
$0.0200 |
$2.13 |
$0.0200 |
$2.13 |
| 87 | 880(D) 8854 |
VERTICAL PANELS | 1,000 | SD |
$0.5000 |
$0.8300 |
$0.5300 |
$0.8200 |
$0.5300 |
| 88 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 12,000 | SD |
$0.3000 |
$0.0200 |
$0.2700 |
$0.0200 |
$0.2700 |
| 89 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 5,000 | SD |
$0.1500 |
$0.3100 |
$0.2700 |
$0.3100 |
$0.2700 |
| 90 | 880(F) 8878 |
DRUMS | 1,000 | SD |
$0.2500 |
$0.0200 |
$0.5300 |
$0.0200 |
$0.5300 |
| 91 | 880(G) 8890 |
CHANNELIZER CONES | 25,000 | SD |
$0.0500 |
$0.3600 |
$0.2700 |
$0.3600 |
$0.2700 |
| 92 | 880(I) 8902 |
FLAGGER | 125 | SD |
$200.00 |
$1,000.00 |
$1,000.00 |
$3,431.38 |
$2,170.97 |
| 93 | 880(W) 8800 |
PILOT CAR | 1 | LSUM |
$30,000.00 |
$100,000.00 |
$275,000.00 |
$173,209.74 |
$167,720.64 |
| 94 | 882(B) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 250 | SD |
$18.50 |
$21.66 |
$53.25 |
$21.64 |
$53.14 |
| 95 | 642 0098 |
STAKING | 1 | LSUM |
$55,000.00 |
$30,000.00 |
$95,000.00 |
$66,360.37 |
$27,312.79 |
| 96 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$4,500.00 |
$2,500.00 |
$15,000.00 |
$13,974.61 |
| 97 | 640 1426 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$7,500.00 |
$5,968.00 |
$44,000.00 |
$6,267.80 |
| 98 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$260,000.00 |
$335,000.00 |
$325,000.00 |
$445,428.08 |
$830,557.00 |
| 99 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$30,000.00 |
$40,000.00 |
$55,000.00 |
$78,000.00 |
$112,916.66 |