Filtered by: County: Will Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2025 | 61J25 | WillDistrict 1 | Widening and reconstruction of Plainfield-Naperville Road at 127th Street and Reagan Boulevard in Plainfield. Includes addition of left turn lanes, curb and Gutter, HMA and Aggregate shoulders, concrete medians, guardrail, traffic signals and lighting. | — | Executed | P. T. Ferro Construction Co. $3,803,259 · | ||
| Jan 17, 2025 | 61K81 | WillDistrict 1 | Widen and resurface Theodore Street from west of Staghorn Drive to Wesmere Parkway in Joliet. | — | Executed | Austin Tyler Construction, Inc. $2,764,372 · | ||
| Jan 17, 2025 | 61K84 | WillDistrict 1 | Construction of an HMA multi-use path, PCC Sidewalk, storm sewer, box culvert extension, retaining wall, and landscaping along Bridge Street in Channahon. | — | Executed | D. Construction, Inc. $2,494,970 · | ||
| Jan 17, 2025 | 62U88 | WillDistrict 1 | (4.32-Mile) Patching (full depth, class D patches) work includes: Earth excavation, aggregate subgrade improvement, subbase granular material, full depth Class D (HMA) patches, special, detector loops, pavement markings and and incidental and collateral work. Located on IL 53, from South of Arsenal Road to Hoff Road within the City of Wilmington and the Village of Elwood in Will County. | — | Executed | K-Five Construction Corporation $9,653,442 · | ||
| Jan 17, 2025 | 62W52 | WillDistrict 1 | Furnishing the structural steel and bearings for the I-80 bridges over the Des Plaines River The proposed scope of work consists of furnishing the structural steel and bearings for the I-80 bridges over the Des Plaines River. Steel will also need to be stored until it can arrive on-site as part of the Contract (62R23). Steel will be for WB and EB of I-80 (SN 099-8309 WB and 099-8325 EB) over the Des Plain River, CSX Railroad, US-6, as well as several existing and proposed local roads The project is in the City of Joliet in Will County. | — | Executed | Veritas Steel LLC $28,658,382 · | ||
| Jan 17, 2025 | 62X78 | CookWillDistrict 1 | Expressway Cleaning (Litter/Debris Removal), This work is located on I-57 expressway from I-90/94 (Dan Ryan Expressway) to Will / Kankakee County Line in Cook and Will Counties. | — | Executed | Orlando Lawn Service, Inc. $227,238 · | ||
| Jan 17, 2025 | 62X81 | CookWillDistrict 1 | Expressway Cleaning (Litter/Debris Removal), This work is located on FAI 80, I-80 Expressway from I-294 (Tri-State Tollway) to Will / Kendall County Line in Cook and Will Counties. | — | Executed | Thor General Contracting LLC $210,330 · | ||
| Jan 17, 2025 | 99687 | WilliamsonDistrict 9 | Construction of a Roundabout at Skyline Drive and Crenshaw Road. Work includes PCC Pavement, curb and gutter, storm sewers, pipe culverts, signage, and lighting . | — | Executed | Samron Midwest Contracting, Inc. $2,026,739 · | ||
| Mar 7, 2025 | 61L02 | WillDistrict 1 | Construct an HMA Multi-Use Path in Home Glen, from Coachman Lane to Heatherwood Drive. Includes HMA Pavement removal, sidewalks, ADA ramps, and signage. | — | Executed | D. Construction, Inc. $398,891 · | ||
| Mar 7, 2025 | 61L13 | WillDistrict 1 | HMA resurfacing on Highpoint Drive from Discovery Park to Weber Road in Romeoville. Additional work includes Class D patches, PCC driveways, sidewalks, drainage and utility structures, and pavement markings. | — | Executed | P. T. Ferro Construction Co. $392,397 · | ||
| Mar 7, 2025 | 62G55 | WillDistrict 1 | Pavement patching, milling of existing HMA surface, placing hot-mix asphalt leveling binder and surface course The Standard Overlay consists of pavement patching, milling of existing HMA surface, placing hot-mix asphalt leveling binder and surface course, drainage structures adjustment and cleaning, grading and shaping ditches, placement of pavement markings. Located on Illinois Route 171 (Archer Ave.) begins at Boula Ave. and extends in a northeasterly direction for 4,542.2 feet (0.86 mile ) to approximately 0.1 miles southwest of I-355. The improvement is in the City of Lockport, in Will County. | — | Executed | Gallagher Asphalt Corporation $1,427,655 · | ||
| Mar 7, 2025 | 62U89 | WillDistrict 1 | The building demolition at various locations The proposed scope of work consists of the building demolition at various locations. Each building removal will include removal any structure above and below the ground, including the main building frames, attached and detached buildings, and facilities. It will also include the removal of fences, sidewalk and_driveways, utilities and trees within the parcels limits. The project is in Will County. | — | Executed | Scanlon Excavating & Concrete, Inc. $498,400 · | ||
| Mar 7, 2025 | 62X76 | CookDuPageWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-55 Expressway from ILL 43 (Harlem Ave) to Reed Road in Cook, DuPage, and Will Counties. | — | Executed | Thor General Contracting LLC $305,910 · | ||
| Mar 7, 2025 | 62X77 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island. | — | Executed | Thor General Contracting LLC $477,405 · | ||
| Apr 25, 2025 | 61K44 | WillDistrict 1 | Construct an HMA shared-use path with pedestrial bridge and two boardwalks from 265th strett to the south end of the existing trail south of Burville Rd. | — | Executed | D. Construction, Inc. $3,654,428 · | ||
| Apr 25, 2025 | 61K61 | WillDistrict 1 | Construction of three 7'X 5' precast concrete box culverts to carry Woodcreek Drive over Lily Cache Lane Tributary in Bollingbrook. Includes; lighting, HMA Pavement, curb and gutter, and sidewalks. | — | Executed | D. Construction, Inc. $753,049 · | ||
| Apr 25, 2025 | 62T27 | WillDistrict 1 | (3,073-Ft) Bridge repairs on (S.N.099-0292), includes bridge deck scarification latex concrete overlay, joint reconstruction, bearings and substructures repair repairs and bearing painting. The roadway work encompasses concrete scarification, butt joints, asphalt overlay, removal and replacement of the median, and curb and gutter, reconstruction of a catch basin and adjustment of inlets. Located along IL 171 (N. State St.) over Fiddyment Creek in the City of Lockport in Will County, Illinois. | — | Executed | D. Construction, Inc. $1,260,740 · | ||
| Apr 25, 2025 | 62V35 | WillDistrict 1 | Hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement (4857.6-Ft) Smart overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement of thermoplastic pavement markings. Located on Illinois Route FAP 112, IL 53 (Independence Blvd), it begins N of University Pkwy and ends at Renwick Rd. in the City of Lockport in Will County. | — | Executed | Builders Paving, LLC $731,556 · | ||
| Apr 25, 2025 | 62X20 | CookWillDistrict 1 | (627-Ft) Bridge Painting project consisting of cleaning and painting steel surfaces. The project is located at the structure No. 1 (SN. 016-1062) carrying I-94 eastbound to I-55 southbound over Archer Avenue/BNSF and ICC RR in the City of Chicago in Cook County, and structure No. 2 (SN. 099-0198) carrying Maple Road Over I-80 in the Village of Mokena in Will County. | — | Executed | ERA-Valdivia Contractors, Inc. $649,580 · | ||
| Apr 25, 2025 | 62X22 | CookWillDistrict 1 | This is a bridge painting project includes cleaning and painting steel surfaces as designated on the plans. LOCATION #1: New Avenue over Long Run Creek Overflow City of Lockport in Will County (SN: 099-0299). LOCATION #2: US 45 over Hickory Creek Village of Frankfort in Will County (SN: 099-0293). LOCATION #3: IL 43 (Harlem Ave.) over I-80 Village of Tinley Park in Cook County (SN: 016-0325). | — | Executed | Capital Industrial Services, LLC $503,300 · | ||
| Apr 25, 2025 | 62X85 | WillDistrict 1 | (1.19-Mile) Pavement Patching includes asphalt surface removal, resurfacing asphalt binder and surface course, aggregate wedge shoulders, grading and shaping shoulders, pavement markings, raised reflective pavement marker. This project is located along I-55 West Frontage Road from South of Stripmine Road to IL 113 (Division Street) in the City of Wilmington and the Village of Diamond in Will County. | — | Executed | P. T. Ferro Construction Co. $410,872 · | ||
| Apr 25, 2025 | 62X93 | WillDistrict 1 | Modernizing bridge lift gates at structures carrying McDonough Street and Brandon Street over the Des Plaines The work on this improvement consists of modernizing bridge lift gates at structures carrying McDonough Street and Brandon Street over the Des Plaines River. This improvement has 2 locations: the first locations is at McDonough Street (SN: 099-9904) over the Des Plaines River and the second location is at Brandon Street (SN: 099-9903) over the Des Plaines River in Will County. | — | Executed | D. Construction, Inc. $1,901,944 · | ||
| Apr 25, 2025 | 78373 | WilliamsonDistrict 9 | 3.6 miles of roadway reconstruction including adding lanes, reconstruction of 4 bridges and intersection reconstruction on IL 13 from Spillway Road to Shawnee Trail. | — | Executed | Samron Midwest Contracting, Inc. $40,895,392 · | ||
| Apr 25, 2025 | 78B10 | WilliamsonDistrict 9 | 1.5 miles of resurfacing and patching on Moellers Road from IL 13 to Pittsburg Road. | — | Executed | Samron Midwest Contracting, Inc. $526,107 · | ||
| Apr 25, 2025 | 78B12 | WilliamsonDistrict 9 | 3.2 miles of HMA surface removal, HMA surfacing and patching on Old IL 13 from the east city limits of Carterville to IL 148. | — | Executed | E. T. Simonds Construction Company $974,757 · | ||
| Jun 13, 2025 | 60R76 | WillDistrict 1 | Construction of a retaining wall, guardrail replacement, shoulder widening, headwall replacement and culvert e (1225-Ft) Bridge Deck Replacement consists of construction of a retaining wall, guardrail replacement, shoulder widening, headwall replacement and culvert extension located on I-57 at Pauling Road (Overhead) in Will County. | — | Executed | D. Construction, Inc. $4,142,053 · | ||
| Jun 13, 2025 | 62G52 | WillDistrict 1 | (1.716-Mile) Designed Overlay improvements include: Curb and gutter spot repair , asphalt surface removal and replacement with new binder and surface (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, pavement markings, raised reflective pavement markers, detector loops replacement. Location: IL 53 (Independence Boulevard), from Joliet Road to Belmont Drive within the Village of Romeoville. | — | Executed | K-Five Construction Corporation $3,382,064 · | ||
| Jun 13, 2025 | 62U39 | WillDistrict 1 | Removal and replacement of the Bridge (SN 099-0205) carrying Francis Road over I-80 and the subsequent pavemen Project consists of removal and replacement of the Bridge (SN 099-0205) carrying Francis Road over I-80 and the subsequent pavement improvements necessary for this replacement. Located on FAI 80 (I-80) at Francis Road, Will County, IL. | — | Executed | D. Construction, Inc. $5,328,033 · | ||
| Jun 13, 2025 | 62W15 | WillDistrict 1 | (1.59-Mile) Replace light towers with poles, LED luminaries, foundations, conduits/cables, restorations. Project located in the Villages of Mokena, Orland Park, and Tinley Park in Will County, at I-80 and US-45 interchange. | — | Executed | John Burns Construction Company $1,709,237 · | ||
| Jun 13, 2025 | 62X34 | WillDistrict 1 | Asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, conc (2.88-Mile) Designed overlay and pedestrian ramp (ADA) project consists of asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, concrete sidewalk removal replacement, resurfacing with asphalt binder course and asphalt surface course, pavement markings. The improvement is in the Cities of Braidwood and Wilmington in Will County. | — | Executed | Iroquois Paving Corporation $1,353,712 · | ||
| Jun 13, 2025 | 62X99 | WillDistrict 1 | Building demolition for ten (10) residential and/or commercial parcels and outbuildings, include removing any The work consists of building demolition for ten (10) residential and/or commercial parcels and outbuildings, include removing any structure above and below the ground, main building frames, attached and detached buildings, facilities, and filling of basements, removal of fences, sidewalks and driveways, utilities, and trees, grading and seeding. Located in the City of Joliet, in the vicinity of FAI Route 80 (Interstate 80) and Des Plaines River in Will County. | — | Executed | C & D Recycling Services, Inc. $469,833 · | ||
| Jun 13, 2025 | 78831 | WilliamsonDistrict 9 | Replacement of SN 100-0053 carrying Stiritz Road (TR 23) over I-57, approximately 0.6 miles west of IL 37. | — | Executed | E. T. Simonds Construction Company $4,956,078 · | ||
| Jun 13, 2025 | 78A33 | WilliamsonDistrict 9 | Signal modifications, pedestrian crossings and sidewalks at the intersection of IL 13 and Halfway Road in Marion. | — | Executed | Brown Electric, Inc. $1,056,436 · | ||
| Jun 13, 2025 | 78B31 | WilliamsonDistrict 9 | 1.1miles of pavement patching and resurfacing on IL 37 from 0.1 miles north of 18th Street to south of 4th Street in Johnston City. | — | Executed | E. T. Simonds Construction Company $685,210 · | ||
| Jun 13, 2025 | 99756 | WilliamsonDistrict 9 | HMA Overlay with Aggregate Wedge Shoulders on Power Plant Road from County Club Road to McKinny Chapel Road. | — | Executed | E. T. Simonds Construction Company $660,852 · | ||
| Aug 1, 2025 | 62X50 | WillDistrict 1 | Milling existing asphalt surface, pavement patching, HMA surface course and HMA binder course, sidewalk remova (2,067-Ft) Designed Overlay, Curb Ramps improvements (ADA), Sidewalk Replacement consists of milling existing asphalt surface, pavement patching, HMA surface course and HMA binder course, sidewalk removal and replacement, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, pavement markings, curb ramps for sidewalks, raised reflective pavement markers, Location: IL 53 (Baltimore Street), from Kankakee Street to West of Forked Creek within the | — | Executed | Gallagher Asphalt Corporation $975,357 · | ||
| Aug 1, 2025 | 62X86 | WillDistrict 1 | Asphalt surface removal, pavement patching, (Hot Mix Asphalt) binder course, polymerized binder course and sur (3,435-Ft) Design and Standard Overlay consists of asphalt surface removal, pavement patching, (Hot Mix Asphalt) binder course, polymerized binder course and surface course, thermoplastic pavement markings. Located on Illinois Route FAU 388, I-55 Frontage Road NB in the Village of Channahon in Will County. | — | Executed | D. Construction, Inc. $250,346 · | ||
| Aug 1, 2025 | 78916 | WilliamsonDistrict 9 | Signal modifications, railroad interconnects and fiber optic installation on IL 37 from IL 13 to Boyton Street in Marion. | — | Executed | Gerstner Electric, Inc. $1,302,315 · | ||
| Aug 1, 2025 | 78A74 | JohnsonWilliamsonDistrict 9 | 9.5 miles of resurfacing on IL 166 from 0.1 miles south of Tune Road to US 45. Also includes ADA improvements in Creal Springs. | — | Executed | E. T. Simonds Construction Company $3,949,325 · | ||
| Aug 1, 2025 | 99284 | WilliamsonDistrict 9 | Extend Ritter Road north to Grand Avenue in Herrin. | — | Executed | Samron Midwest Contracting, Inc. $2,069,759 · | ||
| Aug 1, 2025 | 99760 | WilliamsonDistrict 9 | Construction of a PCC multi-use path from the RIDES Mass Transit Center and VA Hospital along Main Street and Halfway Road in Marion. | — | Executed | Samron Midwest Contracting, Inc. $2,142,142 · | ||
| Sep 19, 2025 | 62R22 | WillDistrict 1 | (3,775-Ft) Realignment and Reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, storm sewer, drainage structures, detention ponds, earth excavation and grading, retaining and noise walls, barrier and moment slab construction, bridge rehabilitation and replacement, roadway lighting, traffic signals, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, d | — | Executed | D. Construction, Inc. $93,597,946 · | ||
| Sep 19, 2025 | 62U11 | CookWillDistrict 1 | Drainage Improvements. Work includes ditch regrading, culvert replacement and other drainage improvements. Locations: US 30 between 84th Avenue and 82nd Avenue in Will County; US 52 at Draves Road and Offner Road in Will County; Intersection of 115th Street and Homan Avenue in Cook County; Intersection of Taft Avenue and Elm Avenue in Cook County; Along Palatine Road, West of Roselle Road in Cook County. | — | Executed | Everlast Blacktop Inc. $1,530,704 · | ||
| Sep 19, 2025 | 62W62 | CookDuPageWillDistrict 1 | This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals, installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals. Installations are various locations in District 1. | — | Executed | John Burns Construction Company $2,170,856 · | ||
| Sep 19, 2025 | 62X01 | WillDistrict 1 | (7.04-Mile) Designed Overlay and Shoulder Reconstruction includes (HMA) removal earth excavation, pavement patching, resurfacing with HMA asphalt, full depth HMA shoulder, pavement markings, raised reflective markers, curb and gutter removal and replacement. Project located on US 45/52 (96th Ave / LaGrange Road) from North of Monee Manhattan Road to Wilmington Peotone Road in the Townships of Green Garden, Peotone and Wilton Center in Will County. | — | Executed | Iroquois Paving Corporation $7,332,294 · | ||
| Nov 7, 2025 | 61L73 | WillDistrict 1 | Extension of Old Renwick Road Trial from the DuPage River to West Renwick Road. | — | Executed | D. Construction, Inc. $352,856 · | ||
| Nov 7, 2025 | 62R51 | WillDistrict 1 | (3,400-Ft) Intersection Improvement (channelization, pavement widening, resurfacing),traffic signal Installation at railroad crossing, traffic signal modernization, Interconnect, minor lighting improvements, drainage Improvements (including new storm sewer at Monee Maintenance Yard), Location: IL 50 (Cicero Avenue) at Dralle Road, at Governors Hwy and at Monee Maintenance Yard, located withing the Villages of University Park and Monee. | — | Executed | Iroquois Paving Corporation $3,192,530 · | ||
| Nov 7, 2025 | 62Y00 | WillDistrict 1 | Building demolition for eleven (11) residential and/or commercial parcels and outbuildings The work consists of building demolition for eleven (11) residential and/or commercial parcels and outbuildings. Each parcel removal will include removing any structure above and below the ground, including the main building frames, attached and detached buildings, facilities, and filling of basements, removal of fences, sidewalks and driveways, utilities, and trees within the parcels' limits. Interim grading and seeding. The project located in the City of Joliet, in the vicinity of FAI Route 80 | — | Executed | C & D Recycling Services, Inc. $346,900 · | ||
| Nov 7, 2025 | 78209 | WilliamsonDistrict 9 | Replacement of SN 100-0031 carrying IL 166 over Sugar Creek at the east corporate limits of Creal Springs. | — | Executed | Samron Midwest Contracting, Inc. $2,526,591 · | ||
| Nov 7, 2025 | 78B74 | WilliamsonDistrict 9 | Patching on IL 166 from IL 13 to Tune Road east of Marion. | — | Executed | E. T. Simonds Construction Company $118,588 · | ||
| Nov 7, 2025 | 80B72 | WillDistrict 1 | Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim This project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes located within the county of Will. | — | Executed | Central Sweeping of Illinois, LLC $1,303,855 · |
1–51 of 51
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.