| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 20, 2023 | 61H99 | WillDistrict 1 | Reconstruction of Crete Road from Richton Road to Exchange Street in Crete. | — | Executed | Iroquois Paving Corporation $2,196,658 · | ||
| Jan 20, 2023 | 62M43 | DuPageWillDistrict 1 | (4,199-Ft) Designed Overlay, New Shoulders on Joliet Rd from I-55 to Sherman Road. The project also includes Diamond Grooving on I-55 NB off ramp to I-355. This Project is in the Villages of Romeoville, Bollingbrook and Woodridge. | — | Executed | P. T. Ferro Construction Co. $2,288,051 · | ||
| Jan 20, 2023 | 62U54 | WillDistrict 1 | The pickup, removal and disposal of debris/litter on a work order basis located on 1) FAI 94: I-94 from I-90/9 Project consists of the pickup, removal and disposal of debris/litter on a work order basis located on 1) FAI 94: I-94 from I-90/94 (Dan Ryan Expwy) to I-80; 2) FAP 341: Stony Island from I-94 to US 12 (95th St); 3) FAU 1574: 103rd St from Cottage Groove to Stony Island in Cook County. | — | Executed | The Final Connection, Inc. $198,656 · | ||
| Mar 10, 2023 | 62R55 | WillDistrict 1 | (980-Ft) project which includes replacement and widening of the bridge carrying Briggs Street over FAI 80 in Joliet Township within Will County. | — | Executed | D. Construction, Inc. $7,287,827 · | ||
| Mar 10, 2023 | 62R68 | WillDistrict 1 | Bridge joint replace/repairs of structure carrying Arsenal Road (SN 099-3392) over BNSF Railroad and Jackson C (575-Ft) Improvements consist of bridge joint replace/repairs of structure carrying Arsenal Road (SN 099-3392) over BNSF Railroad and Jackson Creek in the Village of Elwood, Will County. | — | Executed | P. T. Ferro Construction Co. $258,287 · | ||
| Apr 28, 2023 | 62P67 | WillDistrict 1 | The full replacement of the existing bridge along River Road over I-80 in Troy Township in Will County, IL (1,300-Ft) Improvement consists of the full replacement of the existing bridge along River Road over I-80 in Troy Township in Will County, IL. Work includes pavement reconstruction, shoulder reconstruction, guardrail replacement, retaining wall construction, construction of a multi-use path, and traffic control. | — | Executed | D. Construction, Inc. $6,338,106 · | ||
| Apr 28, 2023 | 62R93 | WillDistrict 1 | (1.20-Mile) Designed Overlay, ADA Improvements project on IL 7/ 53, 0.1-Mile N. of Caton Farm Road to IL 7 (Theodore St) and Bridge deck overlay, expansion joints repair/ replace) on IL 7/ 53 at Rock Run Creek Tributary, located in the Cities of Crest Hill and Joliet in Will County. | — | Executed | Austin Tyler Construction, Inc. $1,818,095 · | ||
| Apr 28, 2023 | 62U37 | WillDistrict 1 | Bridge painting of structure 099-9904 on US 6/ US 52 (McDonough St) over the Des Plaines River in the city of This improvement consists of bridge painting of structure 099-9904 on US 6/ US 52 (McDonough St) over the Des Plaines River in the city of Joliet in Will County. | — | Executed | Capital Industrial Services, LLC $3,633,300 · | ||
| Apr 28, 2023 | 62U52 | CookWillDistrict 1 | Debris and litter cleaning along I-80 from I-294 (Tri-State Tollway) to I-355 This contract consists of debris and litter cleaning along I-80 from I-294 (Tri-State Tollway) to I-355. | — | Executed | The Final Connection, Inc. $125,504 · | ||
| Apr 28, 2023 | 62U56 | WillDistrict 1 | Debris and litter cleaning along I-55 from I-355 to Reed Road This contract consists of debris and litter cleaning along I-55 from I-355 to Reed Road. | — | Executed | The Final Connection, Inc. $183,168 · | ||
| Apr 28, 2023 | 78918 | WilliamsonDistrict 9 | Superstructure repairs on SN 100-0072 carrying IL 37 over Crab Orchard Creek. | — | Executed | E. T. Simonds Construction Company $338,907 · | ||
| Apr 28, 2023 | 99695 | WilliamsonDistrict 9 | PCC Pavement, Curb and Gutter, sidewalk replacement, concrete median, decorative lighting, and landscaping on Park Avenue from Adams Street to Herrin Street in Herrin. | — | Executed | E. T. Simonds Construction Company $1,573,149 · | ||
| Jun 16, 2023 | 46621 | LakeWillDistrict 1 | Application of water borne, lead free, white and yellow paint pavement marking lines of 4, 6 and 8 inches at various locations. The work will be on various State-maintained highways in Lake and Will Counties. | — | Executed | Precision Pavement Markings Inc. $1,816,500 · | ||
| Jun 16, 2023 | 61J60 | WillDistrict 1 | Resurfacing Normantown Road from 135th Street to Weber Road in Romeoville. | — | Executed | Gallagher Asphalt Corporation $1,182,978 · | ||
| Jun 16, 2023 | 61J61 | WillDistrict 1 | HMA resurfacing with patching, sidewalk replacement, ADA improvements, detector loop replacements, and pavement markings on Normantown Road, from Crossroads Parkway to Montrose Drive, in Romeoville. | — | Executed | Austin Tyler Construction, Inc. $777,617 · | ||
| Jun 16, 2023 | 61J62 | WillDistrict 1 | Resurfacing 135th Street from the Chicago Ship and Sanitary Cnal Bridge to New Avenue in Romeoville. | — | Executed | Austin Tyler Construction, Inc. $331,797 · | ||
| Jun 16, 2023 | 62N88 | WillDistrict 1 | (2052-Ft); IL 394 at Burville Road: Intersection Improvement Conversion of the intersection to a Restricted Crossing U-Turn (RCUT)Ù; IL 394 at Exchange Street: Lengthening of the southbound left turn lane storage. The project is located on IL 394 in Unincorporated Crete Township in Will County. | — | Executed | Iroquois Paving Corporation $4,196,716 · | ||
| Jun 16, 2023 | 62T67 | WillDistrict 1 | (1.9-Mile) Crack and Joint Sealing project consisting of crack routing and filling of longitudinal joints, grading and shaping shoulders and pavement re-striping on IL 7 and IL 53 (Broadway Street) from Renwick Road to North of Caton Farm Road in the Cities of Lockport and Crest Hill in Will County. | — | Executed | Denler, Inc. $145,907 · | ||
| Jun 16, 2023 | 62U26 | WillDistrict 1 | The furnishing and storage of structural steel beams and bearings for the bridges along I-80 between east of R (1.98-Mile) The project consists of the furnishing and storage of structural steel beams and bearings for the bridges along I-80 between east of River Road and west of Houbolt Road (EB/WB I-80 over I-55 bridges) located in the Villages of Minooka and Shorewood and Township of Troy in Will County. | — | Executed | DeLong's Inc. of Missouri $4,017,035 · | ||
| Jun 16, 2023 | 78912 | JohnsonWilliamsonDistrict 9 | 13 miles of patching, resurfacing, shoulder work, repairs to 5 bridges and cleaning/painting of 2 bridges. | — | Executed | Samron Midwest Contracting, Inc. $21,648,901 · | ||
| Jun 16, 2023 | 78926 | WilliamsonDistrict 9 | Resurfacing and safety shoulders on Cambria Road north of Blairsville roundabout to 149; resurfacing of mainline and shoulders on Herrin Road east of the Blairsville roundabout to Division Street; resurfacing of mainline and shoulders on Division Street for approximately 1 mile to the state maintenance sign. | — | Executed | Samron Midwest Contracting, Inc. $2,117,873 · | ||
| Jun 16, 2023 | 78945 | WilliamsonDistrict 9 | Replacing SN 100-0044 carrying Grassy Road (CH 25) over I-57. | — | Executed | Samron Midwest Contracting, Inc. $4,288,284 · | ||
| Jun 16, 2023 | 78960 | WilliamsonDistrict 9 | 3 miles of patching and resurfacing, with ADA upgrades and safety shoulders in sections of the project, on IL 149 from the Jackson County line to the Franklin County line. | — | Executed | Samron Midwest Contracting, Inc. $1,383,930 · | ||
| Jun 16, 2023 | 99666 | WilliamsonDistrict 9 | HMA resurfacing with pavement patching, sidewalks, ADA ramps, and pavement markings on East Herrin Street from IL 148 to North 3rd Street, and on North 3rd Street from Bond Street to East Herrin Street in Herrin. | — | Executed | Samron Midwest Contracting, Inc. $673,149 · | ||
| Jun 16, 2023 | 99700 | WilliamsonDistrict 9 | Construction of a concrete multi-use trail from the Marion High School Sports Complex to Prison Road within the Crab Orchard National Wildlife Refuge. | — | Executed | Samron Midwest Contracting, Inc. $3,086,491 · | ||
| Jun 16, 2023 | 99708 | WilliamsonDistrict 9 | Resurface Pentecost Road from south of West DeYoung Street to Old Route 13, and Old Bainbridge Trail from Crab Orchard and Eqyptian Railroad to Old Route 13, and south of West DeYoung Street to Crab Orchard and Eqyptian Railroad, all within the City of Marion. | — | Executed | Samron Midwest Contracting, Inc. $621,140 · | ||
| Aug 4, 2023 | 62T35 | WillDistrict 1 | (2.6-mile) SMART Overlay project located on IL 113 (Coal City Rd.) from I-55 to IL 53, located in the Cities of Braidwood and Wilmington in Will County. | — | Executed | Austin Tyler Construction, Inc. $995,198 · | ||
| Aug 4, 2023 | 99704 | WilliamsonDistrict 9 | Pedestrian safety enhancements, lighting, landscaping, and resurfacing around the town square and along portions of Main street in Marion. | — | Executed | Samron Midwest Contracting, Inc. $3,131,313 · | ||
| Sep 22, 2023 | 62P11 | WillDistrict 1 | Mechanical repairs including refurbishing operating machinery, replacing trunnion bearing bolts, and the clean (395-Ft) Bridge repair of IL 53 (Ruby St) over Desplains River consist of mechanical repairs including refurbishing operating machinery, replacing trunnion bearing bolts, and the cleaning and painting of all span drive and trunnion assemblies in the City of Joliet, Will County. | — | Executed | GRANITE CONSTRUCTION COMPANY $2,743,965 · | ||
| Sep 22, 2023 | 62R27 | WillDistrict 1 | The reconstruction of I-80 mainline pavement from west of Houbolt Road to west of Joliet Junction Trail The project consists of the reconstruction of I-80 mainline pavement from west of Houbolt Road to west of Joliet Junction Trail. The work also includes the superstructure replacement and widening of the EB/WB I-80 bridges over Houbolt Road and partial reconstruction of the entrance and exit ramps at the I-80 and Houbolt Road interchange. Other work includes drainage system improvements, signing, lighting, traffic signals, ITS improvements, and noise abatement walls The project is located in the | — | Executed | D. Construction, Inc. $78,889,799 · | ||
| Sep 22, 2023 | 62R29 | WillDistrict 1 | 14,465 feet (2.74 mile) project which includes widening and reconstruction of mainline I-80 from Rowell Ave. to Gougar Rd., reconstruction and traffic signal modernization at Briggs St ramps, lighting, noise abatement walls, and ITS in Joliet Township and the Village of New Lenox in Will County. | — | Executed | D. Construction, Inc. $79,968,962 · | ||
| Sep 22, 2023 | 62T09 | WillDistrict 1 | Bridge deck and approach slab repair, bridge deck scarification, placement of bridge deck latex concrete overl Length: 1106.9 ft (0.21 mi); Bridge Preservation Project: consist of bridge deck and approach slab repair, bridge deck scarification, placement of bridge deck latex concrete overlay, construction of hot-mix asphalt butt joint, hot- mix asphalt overlay of approach slab, curb and gutter replacement, corrugated median removal, hot-mix asphalt median pavement construction, sidewalk replacement of SN 099-0284 carrying IL 59 over DuPage River in Will County. | — | Executed | D. Construction, Inc. $1,148,722 · | ||
| Sep 22, 2023 | 62U32 | CookWillDistrict 1 | This work includes trombone mast arm and pole replacement, installation of LED of LED signal heads, traffic signal posts, installation of accessible pedestrian signals in various locations in District 1. | — | Executed | Hecker and Company, Inc. $2,055,975 · | ||
| Nov 17, 2023 | 61H25 | WillDistrict 1 | Remove existing dual metal pipe culverts and replace with double-barrel box culvert to carry Indian Boundary Road over Spring Hole Creek in Plainfield. | — | Executed | D. Construction, Inc. $1,850,558 · | ||
| Nov 17, 2023 | 61J78 | WillDistrict 1 | Resurfacing 191st Street from Wolf Road to LaGrange Road in Mokena. | — | Executed | Iroquois Paving Corporation $2,384,949 · | ||
| Nov 17, 2023 | 61J80 | WillDistrict 1 | HMA resurfacing with patching, sidewalks, ADA improvements, multi-use path construction, traffic signal modifications, lighting, drainage adjustments, pavement markings, and other necessary work on 135th Street from Weber Road to IL 53 in the Village of Romeoville. | — | Executed | K-Five Construction Corporation $2,885,523 · | ||
| Nov 17, 2023 | 62H63 | WillDistrict 1 | Parking lot and drainage improvement. Full depth removal and replacement of existing pavement. Location: I-55 Maintenance Yard (151 E South Frontage Rd, Bolingbrook) in Will County. | — | Executed | P. T. Ferro Construction Co. $492,298 · | ||
| Nov 17, 2023 | 62R28 | WillDistrict 1 | The reconstruction of the existing I-80 mainline pavement from east of River Road to west of Houbolt Road and The project consists of the reconstruction of the existing I-80 mainline pavement from east of River Road to west of Houbolt Road and the partial reconstruction of the entrance and exit ramps at the I-80 and I-55 interchange and the W. Frontage Road. The work also includes reconstruction and widening of the EB/WB I-80 Bridges over DuPage River, EB/WB I-80 Bridges over Frontage Road, EB/WB I-80 Bridges over I-55, EB/WB I-80 Bridges over Rock Run Creek, and EB/WB I-80 Bridges over future Ramp AA. | — | Executed | D. Construction, Inc. $90,647,017 · | ||
| Nov 17, 2023 | 62R87 | WillDistrict 1 | (282-Ft) Bridge Preservation Project: bridge repair, joint replace/ repair and deck overlay on bridge carrying Old Chicago Road over Forked Creek (0.5 mi N of Manteno Rd) Located in Wesley Township in Will County. | — | Executed | Iroquois Paving Corporation $499,318 · | ||
| Nov 17, 2023 | 99673 | WilliamsonDistrict 9 | Resurfacing East Grand Avenue from Hurricane Road to IL 148. | — | Executed | Samron Midwest Contracting, Inc. $402,402 · | ||
| Nov 17, 2023 | 99716 | WilliamsonDistrict 9 | Remove and replace sidewalks, ADA ramps and crosswalks along North 18 Street from East Herrin Street to West Monroe Street in Herrin. | — | Executed | E. T. Simonds Construction Company $290,697 · | ||
| Nov 17, 2023 | 99720 | WilliamsonDistrict 9 | HMA resurfacing on Lake of Egypt Road from IL 37 to South Market Road, and on Power Plant Road from Lake of Egypt Road to County Club Road. Includes HMA and aggregate shoulders, guardrail adjustments and replacements, and raised pavement markers. | — | Executed | Samron Midwest Contracting, Inc. $1,664,664 · |
1–42 of 42
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.