CWH 0007 22 BJ
- Let date
- Friday, November 17, 2023
- Contract
- 62R87 · job page
- District
- District 1
- County
- Will
- Highway
- Limits
- (282-Ft) Bridge Preservation Project: bridge repair, joint replace/ repair and deck overlay on bridge carrying Old Chicago Road over Forked Creek (0.5 mi N of Manteno Rd) Located in Wesley Township in Will County.
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Iroquois Paving Corporation Low bidder | $499,318 | ||
| 2 | D. Construction, Inc. | $520,546 | +4.3% | |
| 3 | Martam Construction Incorporated | $556,396 | +11.4% | |
| 4 | Tobey's Construction & Cartage, Inc. | $686,684 | +37.5% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Iroquois Paving… | #2 D. Construction… | #3 Martam Construc… | #4 Tobey's Constru… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X0325748 | ACRYLIC COATING | 17 | SQ YD | $51.00 | $99.00 | $60.00 | $50.00 | |
| 2 | X0325749 | FIBER WRAP | 115 | SQ FT | $81.00 | $121.00 | $82.00 | $75.00 | |
| 3 | X0326697 | CENTERLN RUM STRIP 8 | 139 | FOOT | $47.00 | $16.50 | $20.00 | $30.00 | |
| 4 | X5060700 | CLEAN/PAINT BEARINGS | 12 | EACH | $2,600.00 | $1,100.00 | $1,100.00 | $2,500.00 | |
| 5 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $0.0100 | $4,000.00 | $3,600.00 | $4,000.00 | |
| 6 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $20,000.00 | $24,770.00 | $57,500.00 | $9,445.00 | |
| 7 | X7800815 | HS THPL PM LN 4 | 40 | FOOT | $173.00 | $110.00 | $110.00 | $100.00 | |
| 8 | Z0001700 | APPR SLAB REPAIR (FD) | 3 | SQ YD | $4,800.00 | $2,000.00 | $2,450.00 | $2,600.00 | |
| 9 | Z0001800 | APPR SLAB REPAIR (PD) | 3 | SQ YD | $1,900.00 | $1,000.00 | $1,750.00 | $2,600.00 | |
| 10 | Z0006014 | BR DK LTX C OLY 2 1/2 | 393 | SQ YD | $148.50 | $145.00 | $185.00 | $315.00 | |
| 11 | Z0012130 | BR DECK SCAR 3/4 | 393 | SQ YD | $48.50 | $45.00 | $68.00 | $115.00 | |
| 12 | Z0012754 | STR REP CON DP = < 5 | 4 | SQ FT | $650.00 | $750.00 | $200.00 | $150.00 | |
| 13 | Z0015550 | DEBRIS REMOVAL | 3 | CU YD | $800.00 | $750.00 | $360.00 | $1,975.00 | |
| 14 | Z0016002 | DECK SLAB REP (FD-T2) | 1 | SQ YD | $6,000.00 | $2,500.00 | $5,600.00 | $4,950.00 | |
| 15 | Z0018051 | DRAINAGE SCUPPERS ADJ | 4 | EACH | $600.00 | $500.00 | $1,200.00 | $1,150.00 | |
| 16 | Z0030850 | TEMP INFO SIGNING | 54.6 | SQ FT | $26.00 | $25.00 | $28.00 | $25.00 | |
| 17 | Z0032400 | JOINT REPAIR | 18 | EACH | $225.00 | $1,000.00 | $185.00 | $585.00 | |
| 18 | Z0043800 | P P CONC I-BM REPAIR | 48 | SQ FT | $210.00 | $300.00 | $225.00 | $200.00 | |
| 19 | Z0073510 | TEMP TR SIGNAL TIMING | 1 | EACH | $1,525.00 | $1,650.00 | $3,000.00 | $1,500.00 | |
| 20 | 40600290 | BIT MATLS TACK CT | 182 | POUND | $0.0100 | $0.0100 | $8.00 | $1.00 | |
| 21 | 40600982 | HMA SURF REM BUTT JT | 218 | SQ YD | $13.75 | $0.0100 | $30.00 | $15.50 | |
| 22 | 40604062 | HMA SC IL-9.5 D N70 | 52 | TON | $250.00 | $200.00 | $300.00 | $285.00 | |
| 23 | 44000157 | HMA SURF REM 2 | 121 | SQ YD | $28.00 | $20.00 | $30.00 | $15.50 | |
| 24 | 50102400 | CONC REM | 15.9 | CU YD | $2,650.00 | $3,000.00 | $1,800.00 | $4,200.00 | |
| 25 | 50300255 | CONC SUP-STR | 17.2 | CU YD | $3,650.00 | $2,500.00 | $2,400.00 | $4,575.00 | |
| 26 | 50300260 | BR DECK GROOVING | 424 | SQ YD | $17.50 | $13.75 | $13.00 | $16.50 | |
| 27 | 50300300 | PROTECTIVE COAT | 553 | SQ YD | $5.00 | $0.0100 | $1.00 | $4.00 | |
| 28 | 50500405 | F & E STRUCT STEEL | 210 | POUND | $17.00 | $30.00 | $36.00 | $20.00 | |
| 29 | 50800205 | REINF BARS, EPOXY CTD | 2,540 | POUND | $4.00 | $3.50 | $3.00 | $4.50 | |
| 30 | 52000110 | PREF JT STRIP SEAL | 58 | FOOT | $215.00 | $250.00 | $245.00 | $295.00 | |
| 31 | 52100520 | ANCHOR BOLTS 1 | 8 | EACH | $275.00 | $200.00 | $100.00 | $255.00 | |
| 32 | 60260100 | INLETS ADJUST | 4 | EACH | $1,750.00 | $750.00 | $600.00 | $2,600.00 | |
| 33 | 63000001 | SPBGR TY A 6FT POSTS | 112.5 | FOOT | $47.25 | $48.40 | $15.00 | $47.00 | |
| 34 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $4,300.00 | $4,290.00 | $4,400.00 | $4,100.00 | |
| 35 | 63100167 | TR BAR TRM T1 SPL TAN | 2 | EACH | $4,125.00 | $4,290.00 | $4,200.00 | $4,000.00 | |
| 36 | 63200310 | GUARDRAIL REMOV | 138 | FOOT | $12.00 | $11.00 | $18.00 | $10.00 | |
| 37 | 64300260 | IMP ATTEN FRD NAR TL3 | 2 | EACH | $26,500.00 | $28,600.00 | $34,000.00 | $26,000.00 | |
| 38 | 67100100 | MOBILIZATION | 1 | L SUM | $33,000.00 | $31,250.00 | $33,000.00 | $41,000.00 | |
| 39 | 70107025 | CHANGEABLE MESSAGE SN | 54 | CAL DA | $31.00 | $100.00 | $35.00 | $30.00 | |
| 40 | 78000200 | THPL PVT MK LINE 4 | 277 | FOOT | $10.50 | $12.10 | $12.00 | $11.00 | |
| 41 | 78009004 | MOD URETH PM LINE 4 | 327 | FOOT | $9.75 | $16.50 | $16.00 | $15.00 | |
| 42 | 78100100 | RAISED REFL PAVT MKR | 4 | EACH | $102.00 | $1,100.00 | $1,100.00 | $1,000.00 | |
| 43 | 78300200 | RAISED REF PVT MK REM | 4 | EACH | $0.0100 | $25.00 | $25.00 | $45.00 |