Filtered by: County: Will Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 21, 2022 | 61G73 | WillDistrict 1 | Pavement reconstruction, HMA and PCC pavement, storm sewer, culverts, curb and gutter, sidewalks, guardrail, traffic signals, lighting and pavement markings on 80th Avenue from Greenway Boulevard to Timber Drive and replacing the bridge carrying 80th Avenue over I-80, in Tinley Park. | — | Executed | D. Construction, Inc. $45,187,001 · | ||
| Jan 21, 2022 | 62D49 | WillDistrict 1 | Bridge replacement of the structure that carries IL lover Deer Creek with a two-cell cast-in-place culvert Scope of work consists of bridge replacement of the structure that carries IL lover Deer Creek with a two-cell cast-in-place culvert. Also included are sheet-pile wingwall installation, concrete curb and gutter. | — | Executed | D. Construction, Inc. $1,310,528 · | ||
| Jan 21, 2022 | 62N28 | WillDistrict 1 | (1,000-Ft) Culvert replacement located on US 52 (Cedar Road) over Ditch N of Forked Creek (2 .9 Ml S of Hoff Roda) in the unincorporated Wilton Township. | — | Executed | P. T. Ferro Construction Co. $455,194 · | ||
| Jan 21, 2022 | 62P56 | CookWillDistrict 1 | Cleaning and painting of steel bridge structures at 5 locations This project consists of cleaning and painting of steel bridge structures at 5 locations. SN-0016-0048 and 0049 structures carrying 1-57 NB and SB over RR, Rich Township, Cook County. SN-099-0005; 0286 and 0304 structures carrying 1-55 NB and SB over RR and creek, in Wilmington Township, Will County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $444,000 · | ||
| Jan 21, 2022 | 62P86 | WillDistrict 1 | Cleaning(sweeping} various arterial highways in District One throughout Will County The improvement consists of cleaning(sweeping} various arterial highways in District One throughout Will County. | — | Executed | Elgin Sweeping Services, Inc. $860,098 · | ||
| Jan 21, 2022 | 99634 | WilliamsonDistrict 9 | Reconstruct existing lane confirguration with traffic signal modifications and pavment markings on Williamson County Parkway at 17th Street in Marion. | — | Executed | E. T. Simonds Construction Company $353,562 · | ||
| Mar 11, 2022 | 61B94 | WillDistrict 1 | Replace the bridge carrying Cedar Road over Spring Creek, 1.1 miles north of US 6. | — | Executed | |||
| Mar 11, 2022 | 62M50 | WillDistrict 1 | (315-Ft) Bridge Preservation Project including bridge deck patching and overlay expansion joint replacement, bearings, piers, and beams repair. Location: Bridge carrying Black Road over I-55 in the Village of Shorewood and City of Joliet. | — | Executed | Herlihy Mid-Continent Company $1,043,452 · | ||
| Mar 11, 2022 | 62M53 | WillDistrict 1 | (13.06-Mile) Interstate 57 (I-57) between Kankakee County Line and Steger Rd. (Including rest areas and weigh stations). Scope includes standard overlay, Class A patching, rest area improvements, weigh station repairs, bridge deck sealing located within Villages of Peotone, Monee and University Park. | — | Executed | Iroquois Paving Corporation and Gallagher Asphalt Corporation and D. Construction, Inc. Tri Venture $42,266,497 · | ||
| Mar 11, 2022 | 62M55 | WillDistrict 1 | (1029-Ft) Bridge Preservation Project including partial bridge deck patching, median removal, expansion joints replacement and deck scarification and overlay located on the bridge carrying IL 7 over EJ and E Railroad in the City of Lockport. | — | Executed | D. Construction, Inc. $711,756 · | ||
| Mar 11, 2022 | 62N61 | WillDistrict 1 | (2.36-Mile) SMART overlay, ADA improvements, and illuminated street name signs on IL 53 (Independence Dr) from 135th St/Romeo Rd to 135th St/Romeo Road, located in the Village of Romeoville in Will County. | — | Executed | K-Five Construction Corporation $1,745,000 · | ||
| Mar 11, 2022 | 62P81 | WillDistrict 1 | Cleaning and painting designated steel surfaces of bridge structures carrying 1-55 over US-30 (SN 099-0016 and 0017); 1-55 over RR (SN 099-0018, 0019): 1-55 over Abandoned RR (SN 099-0022 and 0023); in the villages of Romeoville, Plainfield and in the city of Joliet. | — | Executed | Capital Industrial Services $563,830 · | ||
| Mar 11, 2022 | 62R34 | CookWillDistrict 1 | Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-80 expressway from I-294 to I-355 (133.2-Mile) The improvement consists of Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-80 expressway from I-294 to I-355. | — | Executed | MYS, Incorporated $138,395 · | ||
| Mar 11, 2022 | 78895 | JeffersonWilliamsonDistrict 9 | Bridge deck HMA overlay and joint replacement on SN 100-0054 carrying Cedar Grove Road over I-57, north of Marion; and pier repair and approach slab patching on SN041-0032 carrying IL 37 over Casey Fork, 2 miles south of IL 148. | — | Executed | E. T. Simonds Construction Company $269,455 · | ||
| Mar 11, 2022 | 99665 | WilliamsonDistrict 9 | Sidewalk construction along IL 13 from State Street to Fair Street in Marion. | — | Executed | Lake Contracting, Inc. $209,037 · | ||
| Apr 29, 2022 | 62H62 | WillDistrict 1 | Improvements located at the IDOT Birds Bridge Maintenance yard at 22608 S. Frontage Rd, Channahon includes pavement removal, sanitary manhole adjustments, placement of subbase granular material, HMA asphalt pavement, PCC pavement, and thermoplastic pavement markings. | — | Executed | Gallagher Asphalt Corporation $439,851 · | ||
| Apr 29, 2022 | 62N20 | WillDistrict 1 | (2612-Ft) Bridge superstructure replacement and bridge widening of the two-lane structure over 1-80 at Wolf Road located in the Village of Mokena, Will County. | — | Executed | P. T. Ferro Construction Co. $4,699,500 · | ||
| Apr 29, 2022 | 62N87 | WillDistrict 1 | This is a curb ramps for sidewalks ADA improvement project, consisting of sidewalk removal and replacement, comb. conc. curb and gutter removal and replacement and collateral and incidental work at various locations along US Route 6, 30, 52 and IL Routes 7 and 171 in the City of Joliet in Will County. | — | Executed | Triggi Construction, Inc. $971,423 · | ||
| Apr 29, 2022 | 62P35 | WillDistrict 1 | This project is located at various locations along US Rte. 6, US Rte. 30, US Rte. 52 and IL Rte. 7 in the City of Joliet in Will County. The ADA improvement includes sidewalk removal, combination concrete curb and gutter removal and replacement and installation of concrete sidewalk. | — | Executed | Triggi Construction, Inc. $998,023 · | ||
| Apr 29, 2022 | 62R44 | WillDistrict 1 | Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-55 expressway from 1-355 to Reed R (216-Mile) Improvement consists of Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-55 expressway from 1-355 to Reed Road. | — | Executed | Winston's Image LLC $222,264 · | ||
| Apr 29, 2022 | 78896 | WilliamsonDistrict 9 | 3.2 miles of pavement patching on IL 166 from Tune Road to Kinnel Orchard Road. | — | Executed | G. M. Sipes Construction, Inc. $176,928 · | ||
| Apr 29, 2022 | 78914 | JacksonWilliamsonDistrict 9 | 2.4 miles of HMA surface removal, resurfacing and patching on Old IL 13 from Giant City Road to Spillway Road. | — | Executed | E. T. Simonds Construction Company $753,253 · | ||
| Apr 29, 2022 | 78923 | WilliamsonDistrict 9 | 3.7 miles of surface removal and HMA surfacing on IL 13 from 0.9 miles east of Crab Orchard Road to the Saline County line. | — | Executed | E. T. Simonds Construction Company $1,093,312 · | ||
| Apr 29, 2022 | 99672 | WilliamsonDistrict 9 | Replace deck beams, modify existing abutments and pier cap to the structure carrying Spillway Road over Little Grassy Creek, 4 miles south of Carterville. | — | Executed | Samron Midwest Contracting, Inc. $444,444 · | ||
| Jun 17, 2022 | 60W35 | WillDistrict 1 | (1.19-Mile) Pavement reconstruction along I-80 WB from Gardner St to Rowell Ave, replacement and widening of bridges carrying WB I-80 over Hickory Creek and Rowell Ave/WCL RR, bridge deck patching at EB and WB I-80 over Raynor Ave., SB Center St to EB I-80 Ramps, Des Plaines River, IL 53, and Gardner St/BNSF RR/UP RR and lighting in the city of Joliet in Will County. | — | Executed | D. Construction, Inc. and P. T. Ferro Construction Company JV $38,303,613 · | ||
| Jun 17, 2022 | 61H26 | WillDistrict 1 | Reconstruction of Penfield Street from Gould Street to IL 1, and the reconstruction of Gould Street from Indiana Avenue to Penfield Street in Beecher. | — | Executed | Iroquois Paving Corporation $5,343,400 · | ||
| Jun 17, 2022 | 61H75 | WillDistrict 1 | Resurfacng Court Street from Eastgate Avenue to Will Center Road in Monee. | — | Executed | Iroquois Paving Corporation $295,197 · | ||
| Jun 17, 2022 | 61H76 | WillDistrict 1 | Resurfacing Budler Road from Taylor Road to Airport Road in Romeoville. | — | Executed | Austin Tyler Construction, Inc. $683,544 · | ||
| Jun 17, 2022 | 62H15 | WillDistrict 1 | (2.5-Mile) Interchange reconstruction of I-55 from I-80 to US 52 ; adding auxiliary lanes on I-55 ; intersection improvement; new traffic signals; retaining and noise abatement walls; drainage improvement; shared- use path; roadway lighting; ITS; and aesthetic landscaping located in Joliet and Shorewood. | — | Executed | D. Construction, Inc. $59,259,179 · | ||
| Jun 17, 2022 | 62H16 | WillDistrict 1 | Bridge rehabilitation, channelization and traffic signal modernization at US 52 (Jefferson St) and 1-55 interc (1,778-Ft.) Improvement consists of bridge rehabilitation, channelization and traffic signal modernization at US 52 (Jefferson St) and 1-55 interchange, located in Village of Shorewood, Will County. | — | Executed | D. Construction, Inc. $6,157,939 · | ||
| Jun 17, 2022 | 62N47 | WillDistrict 1 | (1.198-Mile) SMART Overlay and ADA ramp improvements from E o f I-80 to E of Church St. Work also includes sidewalk removal, removal and replacement of combination concrete curb and gutter, installation of PCC sidewalk, detectable warnings, adjustment of drainage structures, and pavement markings located in the Village of New Lenox. | — | Executed | P. T. Ferro Construction Co. $1,638,840 · | ||
| Jun 17, 2022 | 62N50 | WillDistrict 1 | (1.71-Mile) SMART Overlay and ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK FAP 876: IL 1 (Main St), from Burville Road to Union Avenue, located in the Village of Crete. | — | Executed | Iroquois Paving Corporation $1,316,006 · | ||
| Jun 17, 2022 | 78619 | WilliamsonDistrict 9 | Replacing SN 100-0055 carrying Westminster Drive over I-57 near the City of Marion. | — | Executed | Samron Midwest Contracting, Inc. $7,311,127 · | ||
| Jun 17, 2022 | 78879 | JacksonWilliamsonDistrict 9 | Signal modifications and fiber optic installation on IL 13 from Reed Station Road in Carbondale to Fair Street in Marion and on I-57 from IL 13 to the DMS sign approximately 3 miles north. | — | Executed | Gerstner Electric, Inc. $3,725,432 · | ||
| Jun 17, 2022 | 99676 | WilliamsonDistrict 9 | Resurface Thompsonville Road from Locust Grove road to Corinth Road. | — | Executed | E. T. Simonds Construction Company $985,189 · | ||
| Jun 17, 2022 | 99686 | WilliamsonDistrict 9 | Resurface Pittsburg Road from Corinth Road to IL 13. | — | Rejected | Southern Illinois Asphalt Co., Inc. $2,744,365 · | ||
| Jul 15, 2022 | 62N48 | CookWillDistrict 1 | (6.47-Mile) Crack and Joint Sealing. streiff ln to scrementi lane in Will and Cook Counties. | — | Executed | Freehill Asphalt, Inc. $318,776 · | ||
| Aug 5, 2022 | 61A96 | WillDistrict 1 | Pavement reconstruction, storm sewer, curb and gutter, sidewalks, retaining wall, traffic signal modernization and lighting on Bell Road from 151st Street to 159th Street in Homer Glen. | — | Executed | D. Construction, Inc. $9,988,295 · | ||
| Aug 5, 2022 | 62F75 | CookWillDistrict 1 | (1.24-Mile) Standard Overlay, ADA, Culvert Repairs in Orland Park and Mokena. | — | Executed | D. Construction, Inc. $2,049,959 · | ||
| Aug 5, 2022 | 62N27 | WillDistrict 1 | This is a various locations drainage and grading improvements project along IL 1 (Exchange St to Kentucky Rd) and IL 394 (0.2 miles S/O Exchange St) located in the Village of Crete and Unincorporated areas. | — | Executed | D. Construction, Inc. $1,159,774 · | ||
| Aug 5, 2022 | 62P70 | WillDistrict 1 | (2,657-Ft) Weigh Station Repairs. I-80 EB Frankfort Weigh Station (East of Townline Rd), Will County. | — | Executed | D. Construction, Inc. $1,453,486 · | ||
| Sep 23, 2022 | 46604 | WillDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and p This work shall consist of removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. | — | Executed | Superior Road Striping, Inc. $1,669,973 · | ||
| Sep 23, 2022 | 61H31 | WillDistrict 1 | 0.30 mile HMA multi-use path, PCC sidewalk, drainage items, and other necessary work along Bridge Street from McKinley Woods Road to Blackberry land in Channahon. | — | Executed | D. Construction, Inc. $1,097,532 · | ||
| Nov 18, 2022 | 61H20 | WillDistrict 1 | Reconstruction and widening of Laraway Road between Jackson Branch Creek and Cedar Road. | — | Executed | Austin Tyler Construction, Inc. $16,865,231 · | ||
| Nov 18, 2022 | 62N41 | WillDistrict 1 | (1,195-Ff) Removal of existing 4-span bridge along Shepley Road over I-80 in Will County, IL and replacement with a 2-span 264'-00" long, 36'-10" out to out wide bridge. Bridge approach roadway improvements include pavement reconstruction, shoulder construction, guardrail replacement, and maintenance of traffic control. | — | Executed | D. Construction, Inc. $4,283,283 · | ||
| Nov 18, 2022 | 62N51 | WillDistrict 1 | (1.52-Mile) SMART Overlay and curb ramps (ADA) improvements on IL 7 from West of Canal Street to East of Read Street. This project is located in City of Lockport in Will County. | — | Executed | Gallagher Asphalt Corporation $882,683 · | ||
| Nov 18, 2022 | 62R30 | WillDistrict 1 | (491-Ft) Complete structure replacement of the bridge carrying Wheeler Avenue over Interstate 80 (1-80), pavement reconstruction, guardrail replacement, etc. Located 5.4 miles east of 1-55, in Joliet Township. | — | Executed | Dunnet Bay Construction Company $5,740,241 · | ||
| Nov 18, 2022 | 78372 | JacksonWilliamsonDistrict 9 | Intersection improvements, pavement widening, HMA resurfacing and a multi-use path on IL 13 from the Williamson County line to east of Spillway Road. | — | Executed | E. T. Simonds Construction Company $6,023,216 · | ||
| Nov 18, 2022 | 78957 | WilliamsonDistrict 9 | This project involves the construction of a mid-block crosswalk with ADA ramps, median refuge island, rectangular rapid flashing beacons, highway lighting and appropriate pavement markings on IL 13 at Ray Fosse Park in Marion IL. | — | Executed | Samron Midwest Contracting, Inc. $246,246 · |
1–49 of 49
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.