18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Aug 8, 2017 | 0139-03-039NH 1702(685) | Reeves Odessa |
ROADWAY WIDENING TO A MODIFIED SUPER 2US 285 · | $20,630,254 | $15,005,109 | FNF CONSTRUCTION, INC. | -27.3% | 8 |
| Aug 8, 2017 | 1586-01-069STP 1702(649) | Hidalgo Pharr |
WIDEN TO 4 LANE DIVIDED CURB AND GUTTERFM 907 · | $10,779,189 | $10,446,130 | TEXAS CORDIA CONSTRUCTION, LLC | -3.1% | 4 |
| Aug 8, 2017 | 3621-01-012STP 1702(690) | Val Verde Laredo |
BASE,GRADE,ACP,PAVMRK,ILLUMINATIONSL 79 · | $5,399,314 | $5,023,548 | HUNTER INDUSTRIES, LTD. | -7.0% | 3 |
| Aug 8, 2017 | 0905-06-086STP 2014(802)MM | Lubbock Lubbock |
GRADE, BASE, C&G, ACPCS · | $4,901,937 | $4,085,773 | ALLEN BUTLER CONSTRUCTION, INC. | -16.6% | 3 |
| Aug 8, 2017 | 0047-18-075NH 1702(747) | Grayson Paris |
CONSTRUCT RAMP REVERSALUS 75 · | $3,447,164 | $3,798,997 | ED BELL CONSTRUCTION COMPANY | +10.2% | 2 |
| Aug 8, 2017 | 0094-02-121STP 2012(660)MM | Tarrant Fort Worth |
GR, DR AND PAVEMENTSH 183 · | $3,335,706 | $3,732,867 | RAGLE CONSTRUCTION, INC. | +11.9% | 4 |
| Aug 8, 2017 | 0328-06-030STP 1702(814) | Atascosa San Antonio |
WIDEN ROADWAY TO PROVIDE PASSING LANESSH 97 · | $2,899,299 | $2,924,984 | HUNTER INDUSTRIES, LTD. | +0.9% | 8 |
| Aug 8, 2017 | 0918-45-757BR 2007(303) | Dallas Dallas |
REPL BR & APPRSCS · | $2,638,157 | $2,883,799 | SEMA CONSTRUCTION, INC. | +9.3% | 5 |
| Aug 8, 2017 | 0265-07-049NH 1702(642) | Fayette Yoakum |
ACP OVERLAYSH 71 · | $2,626,050 | $2,399,995 | LONE STAR PAVING COMPANY | -8.6% | 7 |
| Aug 8, 2017 | 0197-03-073NH 1702(816) | Kaufman Dallas |
BASE REPAIR,LEVEL UP,OVERLAYUS 175 · | $2,860,205 | $2,389,678 | IOC COMPANY LLC | -16.5% | 6 |
| Aug 8, 2017 | 6316-99-001RMC - 631699001 | Frio San Antonio |
PAVEMENT REPAIRIH 35 · | $3,057,011 | $2,345,938 | CLARK CONSTRUCTION OF TEXAS, INC. | -23.3% | 4 |
| Aug 8, 2017 | 0902-00-155STP 1702(735) | Tarrant Fort Worth |
CONSTRUCT CURB RAMPSVA · | $1,886,608 | $2,091,442 | TI-ZACK CONCRETE, INC. | +10.9% | 5 |
| Aug 8, 2017 | 0315-03-059STP 1702(804) | Grimes Bryan |
OVERLAYSH 90 · | $2,993,156 | $2,078,725 | ANGEL BROTHERS HOLDINGS CORP. | -30.6% | 6 |
| Aug 8, 2017 | 0179-01-048STP 1702(629) | Brazoria Houston |
BRIDGE DECK REPLACEMENTSH 35 · | $2,646,095 | $2,037,263 | MAIN LANE INDUSTRIES LTD. | -23.0% | 4 |
| Aug 8, 2017 | 0917-29-129STP 2017(099)TAPS | Brazos Bryan |
PEDESTRIAN AND BICYCLE IMPROVEMENTSVA · | $1,875,784 | $1,803,581 | LARRY YOUNG PAVING, INC. | -3.8% | 5 |
| Aug 8, 2017 | 0091-04-062STP 1702(697)HES | Collin Dallas |
IMPROVE TRAFFIC SIGNALSSH 289 · | $2,204,249 | $1,750,000 | DURABLE SPECIALTIES, INC. | -20.6% | 4 |
| Aug 8, 2017 | 0005-06-119STP 1702(599)HES | Howard Abilene |
INSTALL MEDIAN BARRIERIH 20 · | $2,368,600 | $1,664,669 | MASSANA CONSTRUCTION INC. | -29.7% | 8 |
| Aug 8, 2017 | 0206-01-049BR 1702(753) | Anderson Tyler |
CLEAN/PAINT STEEL GRDRS,REPL BR RAIL,CONC DK OVLYUS 79 · | $1,358,585 | $1,646,254 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | +21.2% | 7 |
| Aug 8, 2017 | 0937-03-016STP 1702(636)HES | Houston Lufkin |
SAFETY TREAT FIXED OBJECTSFM 227 · | $1,786,986 | $1,576,406 | L.C. JORDAN & SON | -11.8% | 5 |
| Aug 8, 2017 | 0908-34-022BR 2016(763) | Callahan Abilene |
BRIDGE REPLACEMENTCR · | $1,449,479 | $1,472,448 | ELLIS-MCGINNIS CONSTRUCTION CO. | +1.6% | 6 |
| Aug 8, 2017 | 0387-01-014STP 1702(817) | Collin Dallas |
WIDEN, OVERLAY, BASE REPAIRFM 75 · | $1,317,598 | $1,442,556 | JAGOE-PUBLIC COMPANY | +9.5% | 6 |
| Aug 8, 2017 | 0197-05-054NH 1702(815) | Kaufman Dallas |
FLBS PVMT REPAIR, LEVEL UP, SEALCOAT & PVMT MRKSUS 175 · | $1,250,198 | $1,419,580 | O. TREVINO CONSTRUCTION, LLC | +13.5% | 7 |
| Aug 8, 2017 | 0005-06-117BR 1702(598) | Howard Abilene |
BRIDGE REHABIH 20 · | $1,097,493 | $1,316,919 | STRUCTURAL TECHNOLOGIES, LLC | +20.0% | 9 |
| Aug 8, 2017 | 0141-20-009BR 1702(667) | Kimble San Angelo |
BRIDGE MAINTENANCESL 481 · | $1,147,555 | $1,146,309 | ALLEN KELLER COMPANY | -0.1% | 6 |
| Aug 8, 2017 | 0015-13-402STP 1702(651)HESG | Travis Austin |
INSTALL TRAFFIC SIGNALS AND FLASHING BEACONSIH 35 · | $1,032,401 | $1,127,246 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | +9.2% | 3 |
| Aug 8, 2017 | 6315-44-001RMC - 631544001 | Dallas Dallas |
TRANSPARENT NOISE WALLIH 30 · | $1,106,145 | $1,109,507 | GIBSON & ASSOCIATES, INC. | +0.3% | 6 |
| Aug 8, 2017 | 0921-02-212BR 2011(281) | Hidalgo Pharr |
REPLACE OFF-SYSTEM BRIDGECR · | $780,556 | $1,033,763 | IOC COMPANY LLC | +32.4% | 4 |
| Aug 8, 2017 | 1068-01-216BR 1702(737) | Tarrant Fort Worth |
GR, BS, DR, PAVIH 30 · | $932,365 | $997,338 | IOWA BRIDGE & CULVERT, LC | +7.0% | 5 |
| Aug 8, 2017 | 6320-98-001RMC - 632098001 | Angelina Lufkin |
MILL AND INLAYUS 59 · | $1,114,557 | $988,331 | MOORE BROTHERS CONSTRUCTION COMPANY | -11.3% | 3 |
| Aug 8, 2017 | 0047-02-134STP 1702(745)HES | Grayson Paris |
SAFETY TREAT FIXED OBJECTSUS 75 · | $838,702 | $930,195 | IIPL USA LLC | +10.9% | 5 |
| Aug 8, 2017 | 0495-08-098STP 1702(695)HESG | Harrison Atlanta |
INSTALL SAFETY LIGHTINGIH 20 · | $708,318 | $689,736 | SOUTH TEXAS ILLUMINATION, LLC | -2.6% | 2 |
| Aug 8, 2017 | 0725-02-019STP 1702(751)HES | Rains Paris |
WIDEN PAVEMENTFM 275 · | $599,302 | $685,541 | LONGVIEW BRIDGE AND ROAD, LTD. | +14.4% | 6 |
| Aug 8, 2017 | 6315-28-001RMC - 631528001 | Washington Bryan |
HMA MILL AND INLAYUS 290 · | $1,003,850 | $648,765 | BIG CREEK CONSTRUCTION, LTD. | -35.4% | 4 |
| Aug 8, 2017 | 0916-28-067STP 1702(421)TAPS | San Patricio Corpus Christi |
CONSTRUCT SHARED USE PATHVA · | $679,618 | $609,894 | JIMMY EVANS COMPANY, LTD. | -10.3% | 6 |
| Aug 8, 2017 | 0177-07-112NH 1702(628) | Harris Houston |
LANDSCAPINGIH 69 · | $746,210 | $598,753 | YELLOWSTONE LANDSCAPE - CENTRAL, INC. | -19.8% | 3 |
| Aug 8, 2017 | 6316-12-001RMC - 631612001 | Waller Houston |
ASPHALT PAVEMENT REPAIRUS 290 · | $561,430 | $521,960 | MAIN LANE INDUSTRIES LTD. | -7.0% | 2 |
| Aug 8, 2017 | 0915-12-591NH 1702(678) | Bexar San Antonio |
LANDSCAPE DEVELOPEMENTVA · | $527,386 | $510,193 | ENCINO LANDSCAPE, INC. | -3.3% | 2 |
| Aug 8, 2017 | 6320-03-001RMC - 632003001 | Brown Brownwood |
CRACK SEALINGUS 377 · | $660,012 | $497,291 | D & M CONTRACTORS, LLC | -24.7% | 9 |
| Aug 8, 2017 | 6318-82-001RMC - 631882001 | De Witt Yoakum |
ON-CALL THERMO PAVEMENT MARKINGSUS 183 · | $640,500 | $484,590 | BATTERSON, LLP | -24.3% | 5 |
| Aug 8, 2017 | 6319-23-001RMC - 631923001 | San Patricio Corpus Christi |
CONCRETE RIPRAP REPAIR & DITCH CLEANINGFM 796 · | $469,316 | $457,753 | BECK-REIT & SONS, LTD. | -2.5% | 5 |
| Aug 8, 2017 | 2689-01-026STP 1702(681)HES | Travis Austin |
CHANNELIZATION(STRIPING)FM 2304 · | $388,510 | $355,909 | DAN WILLIAMS COMPANY | -8.4% | 2 |
| Aug 8, 2017 | 6319-17-001RMC - 631917001 | Pecos Odessa |
CLEANING AND SEALING CRACKSIH 10 · | $445,860 | $337,396 | L&L COMPANY | -24.3% | 5 |
| Aug 8, 2017 | 0913-09-065BR 2014(682) | Wharton Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $316,096 | $320,804 | 3LW CIVIL LLC | +1.5% | 10 |
| Aug 8, 2017 | 0920-30-079BR 2014(324) | Orange Beaumont |
REPLACE BRIDGE AND APPROACHESCS · | $381,857 | $316,837 | WIDGEON CONSTRUCTION, INC. | -17.0% | 7 |
| Aug 8, 2017 | 6319-18-001RMC - 631918001 | Ward Odessa |
CLEANING AND SEALING CRACKSIH 20 · | $328,840 | $271,212 | D & M CONTRACTORS, LLC | -17.5% | 4 |
| Aug 8, 2017 | 6318-95-001RMC - 631895001 | Grayson Paris |
CRACK SEALUS 82 · | $342,255 | $249,491 | D & M CONTRACTORS, LLC | -27.1% | 5 |
| Aug 8, 2017 | 0910-00-108STP 1702(466) | Smith Tyler |
PLANT TREES & SHRUBS, IRRIGATIONVA · | $276,650 | $224,600 | CENTRAL NORTH CONSTRUCTION, LLC | -18.8% | 3 |
| Aug 8, 2017 | 0339-03-037STP 1702(634)HES | Hardin Beaumont |
SAFETY TREAT FIXED OBJECTS, TEXTURIZE SHOULDERSSH 105 · | $235,930 | $220,428 | WIDGEON CONSTRUCTION, INC. | -6.6% | 3 |
| Aug 8, 2017 | 0914-33-070STP 2017(895)HES | Hays Austin |
INSTALL WARN/GUIDE SIGNS/DELINEATORSCR · | $148,805 | $149,765 | FLASHER EQUIPMENT COMPANY | +0.6% | 4 |
| Aug 8, 2017 | 0916-28-068STP 1702(430)TAPS | San Patricio Corpus Christi |
CONSTRUCT SIDEWALKCS · | $132,782 | $119,588 | ENCINO LANDSCAPE, INC. | -9.9% | 8 |
| Jul 27, 2017 | 6320-09-001RMC - 632009001 | Presidio El Paso |
PICNIC AREA LITTER BARRELUS 67 · | $50,820 | $46,979 | MESA D CORP. | -7.6% | 2 |
| Jul 25, 2017 | 6301-71-001RMC - 630171001 | La Salle Laredo |
CLEANING AND SWEEPING OF HIGHWAYS/LITTERIH 35 · | $123,483 | $389,615 | M & M STRIPING & POWER WASHING, LLC | +215.5% | 1 |
| Jul 25, 2017 | 6319-25-001RMC - 631925001 | Duval Laredo |
MOWING OF HIGHWAYS RIGHT-OF-WAYUS 59 · | $179,922 | $214,060 | R&M INCORPORATED | +19.0% | 1 |
| Jul 20, 2017 | 6317-69-001RMC - 631769001 | Grayson Paris |
CLEANING AND SWEEPING HIGHWAYSUS 75 · | $206,715 | $287,638 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | +39.1% | 1 |
| Jul 20, 2017 | 6318-96-001RMC - 631896001 | Hopkins Paris |
CRACK SEALIH 30 · | $135,250 | $94,682 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -30.0% | 7 |
| Jul 20, 2017 | 6319-69-001RMC - 631969001 | Hudspeth El Paso |
MOWING HIGHWAY RIGHT OF WAYUS 62 · | $64,860 | $54,651 | CM COMPANY | -15.7% | 2 |
| Jul 20, 2017 | 6319-98-001RMC - 631998001 | Culberson El Paso |
MAINTENANCE PICNIC AREASUS 62 · | $33,760 | $29,407 | A CUT ABOVE LAWN MAINTENANCE & SPRINKLER CO. | -12.9% | 1 |
| Jul 18, 2017 | 6316-03-001RMC - 631603001 | Parker Fort Worth |
SWEEPING AND DEBRISIH 20 · | $294,845 | $286,745 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | -2.7% | 2 |
| Jul 18, 2017 | 6318-38-001RMC - 631838001 | Brazoria Houston |
PUMP STA & DRAINAGE SYS CLNSH 288 · | $277,655 | $277,655 | CLEAN SERVE, LLC | 0.0% | 1 |
| Jul 18, 2017 | 6312-88-001RMC - 631288001 | Tarrant Fort Worth |
CALLOUT REFLECTORIZED PAVEMENT MARKINGSIH 35W · | $275,157 | $273,473 | TOTAL HIGHWAY MAINTENANCE, LLC | -0.6% | 4 |
| Jul 18, 2017 | 6316-52-001RMC - 631652001 | Brazoria Houston |
REPAIR OF FLEXIBLE PAVEMENTSH 288 · | $273,170 | $246,750 | MAIN LANE INDUSTRIES LTD. | -9.7% | 2 |
| Jul 18, 2017 | 6311-71-001RMC - 631171001 | Tarrant Fort Worth |
FULL DEPTH REPAIR OF EXISTING CONCRETEUS 287 · | $205,385 | $243,481 | IIPL USA LLC | +18.5% | 5 |
| Jul 18, 2017 | 6313-83-001RMC - 631383001 | Harris Houston |
REMOVE AND RESET CULVERTSSH 35 · | $251,160 | $242,184 | MAIN LANE INDUSTRIES LTD. | -3.6% | 6 |
| Jul 18, 2017 | 6320-26-001RMC - 632026001 | Taylor Abilene |
HIGH PERFORMANCE STRIPINGIH 20 · | $296,133 | $230,803 | FLAT LINE, INC. | -22.1% | 5 |
| Jul 18, 2017 | 6316-02-001RMC - 631602001 | Johnson Fort Worth |
CLEANING AND SEALING JOINTS & CRACKSIH 35W · | $226,799 | $205,978 | CHAMPION INFRASTRUCTURE, LLC | -9.2% | 5 |
| Jul 18, 2017 | 6319-10-001RMC - 631910001 | Pecos Odessa |
SPECIALTY MARKINGSIH 10 · | $187,889 | $190,972 | DOUBLE A CONTRACTING, L.P. | +1.6% | 6 |
| Jul 18, 2017 | 6306-32-001RMC - 630632001 | Coryell Waco |
TREE TRIMMIMG AND TREE REMOVALUS 84 · | $264,880 | $190,139 | KASPARIAN UNDERGROUND, LLC | -28.2% | 3 |
| Jul 18, 2017 | 6306-33-001RMC - 630633001 | Hill Waco |
TREE TRIMMING AND TREE REMOVALUS 77 · | $224,483 | $173,013 | KASPARIAN UNDERGROUND, LLC | -22.9% | 4 |
| Jul 18, 2017 | 6316-94-001RMC - 631694001 | Montgomery Houston |
BRIDGE JOINT CLEANING AND SEALINGIH 69 · | $218,528 | $161,506 | CHAMPION INFRASTRUCTURE, LLC | -26.1% | 5 |
| Jul 18, 2017 | 6315-55-001RMC - 631555001 | Collin Dallas |
MISCELLANEOUS CONCRETE REPAIRUS 380 · | $115,982 | $138,438 | IIPL USA LLC | +19.4% | 2 |
| Jul 18, 2017 | 6319-40-001RMC - 631940001 | Bell Waco |
TREE TRIMMIMG AND TREE REMOVALFM 817 · | $146,795 | $136,909 | BEAVER BOYS SERVICES | -6.7% | 5 |
| Jul 18, 2017 | 6306-31-001RMC - 630631001 | McLennan Waco |
TREE TRIMMING AND REMOVALSH 6 · | $117,480 | $105,038 | RAFTER JK CONSTRUCTION, LLC | -10.6% | 8 |
| Jul 18, 2017 | 6316-44-001RMC - 631644001 | Galveston Houston |
CRACK SEALINGSH 146 · | $76,092 | $62,643 | CHAMPION INFRASTRUCTURE, LLC | -17.7% | 3 |
| Jul 18, 2017 | 6313-40-001RMC - 631340001 | Liberty Beaumont |
SH 105 ETC., CRACK SEALSH 105 · | $59,242 | $34,854 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -41.2% | 4 |
| Jul 13, 2017 | 6316-77-001RMC - 631677001 | Tom Green San Angelo |
METAL BEAM GUARD FENCE REPAIRSH 208 · | $286,160 | $319,359 | ELITE CASTLE RESOURCES LLC | +11.6% | 2 |
| Jul 13, 2017 | 6318-64-001RMC - 631864001 | Webb Laredo |
INSTALLATION OF PVT MRKGS AND PVT MRKRSIH 35 · | $298,983 | $266,387 | PAVEMENT MARKINGS INC. | -10.9% | 5 |
| Jul 13, 2017 | 6318-14-001RMC - 631814001 | Bastrop Austin |
CLEANING AND SEALING JOINTS AND CRACKSUS 290 · | $243,429 | $170,931 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -29.8% | 4 |
| Jul 13, 2017 | 6314-72-001RMC - 631472001 | Crockett San Angelo |
REPAIR BRIDGE RAILIH 10 · | $170,130 | $161,660 | SCR CIVIL CONSTRUCTION, LLC | -5.0% | 3 |
| Jul 13, 2017 | 6305-76-001RMC - 630576001 | Cherokee Tyler |
CULVERT REPAIRUS 69 · | $68,192 | $60,270 | HIGHWAY 19 CONSTRUCTION LLC | -11.6% | 8 |
| Jul 13, 2017 | 6317-67-001RMC - 631767001 | Williamson Austin |
CRACK SEALINGUS 79 · | $86,200 | $60,016 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -30.4% | 6 |
| Jul 12, 2017 | 2635-03-018NH 1702(473) | Randall Amarillo |
CONSTRUCT INTERCHANGE,MAINLANES AND FRT ROADSSL 335 · | $46,556,724 | $42,375,492 | ALLEN BUTLER CONSTRUCTION, INC. | -9.0% | 4 |
| Jul 12, 2017 | 0605-01-060BR 2017(973) | Matagorda Yoakum |
REPLACE SWING BRIDGEFM 457 · | $39,234,368 | $41,231,131 | AUSTIN BRIDGE & ROAD SERVICES, LP | +5.1% | 9 |
| Jul 12, 2017 | 2121-02-150NH 1702(501) | El Paso El Paso |
INTERCHANGE IMPROVEMENTSIH 10 · | $27,267,381 | $25,376,264 | DAN WILLIAMS COMPANY | -6.9% | 4 |
| Jul 12, 2017 | 0128-04-035STP 2017(458) | McCulloch Brownwood |
RECONSTRUCT URBAN ROADUS 190 · | $11,675,760 | $17,475,202 | ALLEN KELLER COMPANY | +49.7% | 1 |
| Jul 12, 2017 | 1091-04-022STP 1702(454) | Rockwall Dallas |
PROVIDE ADDITIONAL PAVEMENT SURFACE AND OVERLAYFM 549 · | $12,935,231 | $11,599,739 | ED BELL CONSTRUCTION COMPANY | -10.3% | 7 |
| Jul 12, 2017 | 0266-08-011BR 1702(488) | Colorado Yoakum |
CONSTRUCT NEW BRIDGE AND APPROACHESBS 71-F · | $9,384,798 | $10,459,589 | ISI CONTRACTING, INC. | +11.5% | 3 |
| Jul 12, 2017 | 0237-07-013STP 1702(496) | Dimmit Laredo |
BASE,GRADE,ACP, PAV MARKFM 133 · | $10,511,417 | $9,690,620 | ANDERSON COLUMBIA CO., INC. | -7.8% | 7 |
| Jul 12, 2017 | 0495-01-074NH 1702(759) | Kaufman Dallas |
MILL AND OVERLAY EXISTING FREEWAYIH 20 · | $10,384,459 | $9,178,945 | OLDCASTLE MATERIALS TEXAS, INC. | -11.6% | 6 |
| Jul 12, 2017 | 0089-06-088NH 1702(485) | Wharton Yoakum |
ACP OVERLAYUS 59 · | $8,011,301 | $8,161,720 | JAMES CONSTRUCTION GROUP, L.L.C. | +1.9% | 5 |
| Jul 12, 2017 | 0271-14-231NH 1702(513) | Harris Houston |
RECONSTRUCT FRTG RDSIH 610 · | $8,902,557 | $7,781,945 | MAIN LANE INDUSTRIES LTD. | -12.6% | 9 |
| Jul 12, 2017 | 0005-05-112BR 1702(476) | Howard Abilene |
INSTALL CRASHWALLSIH 20 · | $6,107,331 | $7,767,028 | SCR CIVIL CONSTRUCTION, LLC | +27.2% | 4 |
| Jul 12, 2017 | 0140-11-044NH 1702(546) | Crockett San Angelo |
PLANE, EMULSION TREAT, SURFACE TREATMENT & OVERLAYIH 10 · | $5,474,290 | $4,567,929 | REECE ALBERT, INC. | -16.6% | 6 |
| Jul 12, 2017 | 6316-22-001RMC - 631622001 | Harris Houston |
GENERL MAINTENANCE_IH 610IH 610 · | $4,535,407 | $4,111,633 | ISI CONTRACTING, INC. | -9.3% | 3 |
| Jul 12, 2017 | 1673-01-008SSW 1673-1-8 | Van Zandt Tyler |
GR, FLX BS, TCST, STRS, PV MKFM 1653 · | $3,920,876 | $3,972,777 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | +1.3% | 7 |
| Jul 12, 2017 | 0005-13-056BR 1702(495) | Ector Odessa |
UPGRADE BRIDGE AND APPROACH RAILINGIH 20 · | $3,632,750 | $3,958,979 | SCR CIVIL CONSTRUCTION, LLC | +9.0% | 3 |
| Jul 12, 2017 | 0245-06-081STP 1702(585) | Smith Tyler |
PLNING,BASE REPAIR,MEMB UNDRSL,SUPER PAV,PV MKSH 64 · | $4,092,402 | $3,624,096 | MADDEN CONTRACTING COMPANY, LLC. | -11.4% | 6 |
| Jul 12, 2017 | 2374-01-187STP 1702(455)HES | Dallas Dallas |
INSTALL PROTECTIONIH 635 · | $3,358,413 | $3,522,311 | SJ&J CONSTRUCTION, LLC | +4.9% | 4 |
| Jul 12, 2017 | 0915-00-178STP 1702(555) | Bexar San Antonio |
CONSTRUCT CURB RAMPS_(VARIOUS LOC IN BEXAR CO)VA · | $3,928,875 | $3,495,290 | F. D. CONCRETE, LLC | -11.0% | 10 |
| Jul 12, 2017 | 0043-06-084BR 1702(470) | Wilbarger Wichita Falls |
BRIDGE MAINTENANCEUS 70 · | $2,821,267 | $3,149,694 | SCR CIVIL CONSTRUCTION, LLC | +11.6% | 3 |
| Jul 12, 2017 | 0047-14-082NH 1702(450) | Collin Dallas |
LANDSCAPE TREATMENT OF RIGHTS OF WAY AND MEDIANSUS 75 · | $2,311,464 | $2,750,000 | AALC, INC. | +19.0% | 4 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.