55BidsFeb 14, 2012 to Jun 6, 2024
3Wins (low bidder)
5.5%Win rate
$600,782Total won
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Jun 6, 2024 | 0915-00-263 | PREVENTIVE MAINTENANCEBexar · San Antonio | 6 of 7 | $4,964,085 | $3,699,237STRIPE-A-ZONE, LLC | +34.2% |
| Oct 7, 2021 | 1902-01-033 | HAZARD ELIMINATION & SAFETYTravis · Austin | 3 of 3 | $115,203 | $83,707TRP CONSTRUCTION GROUP, LLC | +37.6% |
| Oct 7, 2021 | 6388-36-001 | PAVEMENT MARKINGSBexar · San Antonio | 4 of 4 | $3,684,492 | $3,077,768INTERSTATE BARRICADES & MAR… | +19.7% |
| Oct 7, 2021 | 6387-79-001 | THERMOPLASTIC PAVEMENT MARKINGSGonzales · Yoakum | 9 of 9 | $790,650 | $500,100INTERSTATE BARRICADES & MAR… | +58.1% |
| Jun 3, 2021 | 6379-83-001 | PAVEMENT MARKINGSBexar · San Antonio | 3 of 5 | $3,322,501 | $2,806,412PAVEMENT MARKINGS INC. | +18.4% |
| Apr 8, 2021 | 0922-00-073 | HAZARD ELIMINATION & SAFETYWebb · Laredo | 7 of 7 | $2,049,219 | $1,371,915HIGHWAY BARRICADES AND SERV… | +49.4% |
| Apr 8, 2021 | 0915-00-229 | HIGHWAY IMPROVEMENTBexar · San Antonio | 3 of 5 | $1,166,979 | $916,531INTERSTATE BARRICADES & MAR… | +27.3% |
| Jan 7, 2021 | 6350-34-001 | THERMOPLASTIC PAVEMENT MARKINGS (ON CALL)Victoria · Yoakum | 5 of 9 | $617,175 | $524,650PAVEMENT MARKINGS INC. | +17.6% |
| Dec 3, 2020 | 0914-00-433 | RESTRIPING & REPLACEMENT OF RAISED PAVEMENT MARKERTravis · Austin | 6 of 7 | $800,176 | $601,620PMI PAVEMENT MARKING, LLC | +33.0% |
| Jul 8, 2020 | 0235-02-047 | LED FLASHING CHEVRONS ON CURVESEdwards · San Angelo | 4 of 7 | $247,898 | $116,358L. UNITED BUILDING COMPANY | +113.0% |
| May 7, 2020 | 6363-34-001 | STRIPING & PAVEMENT MARKINGSJim Wells · Corpus Christi | 3 of 7 | $2,421,343 | $1,720,526HIGHWAY BARRICADES AND SERV… | +40.7% |
| Apr 8, 2020 | 6359-15-001 | PAV MARKINGS & MRKRS CENTERLINE TEXTUREBexar · San Antonio | 3 of 4 | $3,074,632 | $2,792,098TRP CONSTRUCTION GROUP, LLC | +10.1% |
| Jan 10, 2020 | 6352-47-001 | PAV MARKINGS & MRKRS CENTERLINE TEXTUREBexar · San Antonio | 4 of 4 | $3,487,453 | $2,927,690TRP CONSTRUCTION GROUP, LLC | +19.1% |
| Dec 3, 2019 | 0914-05-206 | TRAFFIC CONTROL DEVICESWilliamson · Austin | 3 of 5 | $1,783,922 | $1,694,954TRP CONSTRUCTION GROUP, LLC | +5.2% |
| Nov 5, 2019 | 0914-00-428 | RESTRIPING & REPLACING OF RAISED PAVEMENT MARKINGSTravis · Austin | 4 of 4 | $903,788 | $541,569D. I. J. CONSTRUCTION, INC. | +66.9% |
| Oct 3, 2019 | 6348-40-001 | REPL.& INSTL. OF CURVE WARNING SIGNSGoliad · Corpus Christi | 8 of 11 | $468,402 | $397,585HIGHWAY BARRICADES AND SERV… | +17.8% |
| May 8, 2019 | 0037-03-083 | PROFILE EDGELINE AND CENTERLINE MARKINGSZavala · Laredo | 9 of 9 | $958,088 | $687,075D. I. J. CONSTRUCTION, INC. | +39.4% |
| May 8, 2019 | 0915-00-222 | DISTRICTWIDE PAVEMENT MARKINGS - FY 2019Bexar · San Antonio | 3 of 3 | $1,721,816 | $1,519,049TRP CONSTRUCTION GROUP, LLC | +13.3% |
| May 7, 2019 | 0022-07-030 | PROFILE EDGELINE AND CENTERLINE MARKINGSVal Verde · Laredo | 8 of 8 | $1,262,539 | $911,561DOUBLE A CONTRACTING, L.P. | +38.5% |
| Sep 7, 2018 | 0913-00-104 | PAVEMENT MARKINGSDe Witt · Yoakum | 4 of 6 | $3,817,417 | $2,784,234PAVEMENT MARKINGS INC. | +37.1% |
| Sep 7, 2018 | 6334-24-001 | SMALL SIGN REPLACEMENTGoliad · Corpus Christi | 4 of 6 | $649,177 | $560,305HIGHWAY BARRICADES AND SERV… | +15.9% |
| Aug 7, 2018 | 0914-00-413 | ROUTINE MAINTENANCE OF PVMT MARKINGTravis · Austin | 6 of 6 | $3,276,801 | $2,193,468STRIPE-A-ZONE, INC. | +49.4% |
| Jul 10, 2018 | 6331-75-001 | PAV MARKINGS & MRKRS CENTERLINE TEXTUREBexar · San Antonio | 2 of 4 | $1,784,279 | $1,529,779INTERSTATE BARRICADES & MAR… | +16.6% |
| Feb 2, 2018 | 6326-45-001 | PAV MARKINGS & MRKRS CENTERLINE TEXTUREFrio · San Antonio | 4 of 4 | $2,174,264 | $1,813,511PAVEMENT MARKINGS INC. | +19.9% |
| Feb 1, 2018 | 0155-02-026 | TEXTURIZE SHOULDERS, CENTERLINE TEXTURINGGoliad · Corpus Christi | 8 of 8 | $1,444,444 | $858,713BATTERSON, LLP | +68.2% |
| Dec 5, 2017 | 0907-00-167 | PAVEMENT MARKINGSTom Green · San Angelo | 5 of 11 | $798,659 | $689,377L&L COMPANY | +15.9% |
| Dec 5, 2017 | 6324-20-001 | RETRACE PAVEMENT MARKINGS AND MARKERSTom Green · San Angelo | 4 of 10 | $382,150 | $341,836FLAT LINE, INC. | +11.8% |
| Sep 7, 2017 | 0142-10-024 | CHEVRONS & PAVEMENT MARKINGSKendall · San Antonio | 2 of 2 | $227,062 | $184,058TRP CONSTRUCTION GROUP, LLC | +23.4% |
| Sep 7, 2017 | 6320-55-001 | TRAFFIC CONTROLFrio · San Antonio | 6 of 8 | $1,512,875 | $1,096,294AREA WIDE PROTECTIVE, INC. | +38.0% |
| Sep 6, 2017 | 6318-75-001 | INSTALLATION OF PVT MRKGS AND PVT MRKRSVal Verde · Laredo | 2 of 4 | $284,186 | $278,455PAVEMENT MARKINGS INC. | +2.1% |
| Aug 9, 2017 | 6320-54-001 | TRAFFIC CONTROLBexar · San Antonio | 3 of 7 | $1,400,335 | $1,099,125ALTUS TRAFFIC MANAGEMENT LLC | +27.4% |
| Aug 8, 2017 | 0914-33-070 | INSTALL WARN/GUIDE SIGNS/DELINEATORSHays · Austin | 1 of 4 | $149,765 | $149,765 | Won |
| Aug 8, 2017 | 6318-82-001 | ON-CALL THERMO PAVEMENT MARKINGSDe Witt · Yoakum | 3 of 5 | $535,450 | $484,590BATTERSON, LLP | +10.5% |
| Jul 13, 2017 | 6318-64-001 | INSTALLATION OF PVT MRKGS AND PVT MRKRSWebb · Laredo | 4 of 5 | $328,336 | $266,387PAVEMENT MARKINGS INC. | +23.3% |
| Jul 11, 2017 | 6319-27-001 | SPOT PAVEMENT MARKINGSWalker · Bryan | 7 of 7 | $543,400 | $311,200BATTERSON, LLP | +74.6% |
| May 9, 2017 | 6314-89-001 | INSTALL/REMOVE RAISED PAVEMENT MARKERSWashington · Bryan | 4 of 4 | $413,475 | $248,362CROSS PLUS CONSTRUCTION, LLC | +66.5% |
| May 9, 2017 | 6314-90-001 | INSTALL/REMOVE RAISED PAVEMENT MARKERSBrazos · Bryan | 4 of 4 | $413,475 | $249,203BRYDL CONTRACTING, INC. | +65.9% |
| May 9, 2017 | 6314-91-001 | INSTALL/REMOVE RAISED PAVEMENT MARKERSWalker · Bryan | 4 of 4 | $413,475 | $243,381BRYDL CONTRACTING, INC. | +69.9% |
| Mar 7, 2017 | 0906-00-173 | IH PAVEMENT MARKINGEctor · Odessa | 8 of 10 | $748,011 | $524,247L&L COMPANY | +42.7% |
| Feb 3, 2017 | 6313-14-001 | STRIPING & PAVEMENT MARKINGSNueces · Corpus Christi | 3 of 5 | $2,556,327 | $1,906,409PAVEMENT MARKINGS INC. | +34.1% |
| Feb 3, 2017 | 6313-15-001 | STRIPING & PAVEMENT MARKINGSSan Patricio · Corpus Christi | 6 of 7 | $2,658,502 | $1,885,782HIGHWAY BARRICADES AND SERV… | +41.0% |
| Jan 5, 2017 | 6301-60-001 | THERMOPLASTIC PAVEMENT MARKINGSJackson · Yoakum | 8 of 9 | $901,463 | $691,417FLAT LINE, INC. | +30.4% |
| Jan 5, 2017 | 6308-67-001 | REFLECTORIZED PAVEMENT MARKINGS/MARKERSTravis · Austin | 4 of 5 | $2,970,850 | $2,186,180TRP CONSTRUCTION GROUP, LLC | +35.9% |
| Jan 4, 2017 | 0907-00-166 | PAVEMENT MARKINGSTom Green · San Angelo | 8 of 9 | $631,944 | $506,111FLAT LINE, INC. | +24.9% |
| Dec 1, 2016 | 6311-15-001 | PAVEMENT MARKINGS AND MARKERSTravis · Austin | 4 of 6 | $2,608,385 | $2,147,755ROADSAFE TRAFFIC SYSTEMS, I… | +21.4% |
| Dec 1, 2016 | 6312-04-001 | ON-CALL THERMOPLASTIC PAVEMENT MARKINGSVictoria · Yoakum | 4 of 8 | $561,203 | $440,325ROADSAFE TRAFFIC SYSTEMS, I… | +27.5% |
| Nov 7, 2013 | 6244-71-001 | INSTALL PVT MARKINGS AND PVT MARKERSVal Verde · Laredo | 3 of 4 | $267,042 | $263,818PAVEMENT MARKINGS INC. | +1.2% |
| Nov 6, 2013 | 6257-58-001 | PAVEMENT MARKINGSHidalgo · Pharr | 5 of 5 | $1,445,186 | $1,255,202PAVEMENT MARKINGS INC. | +15.1% |
| Nov 5, 2013 | 6265-40-001 | THERMOPLASTIC PAVEMENT MARKINGS ON-CALLDe Witt · Yoakum | 5 of 7 | $534,924 | $511,700INTERSTATE BARRICADES & MAR… | +4.5% |
| Nov 4, 2013 | 6242-60-001 | INSTALL PVT MARKINGS AND PVT MARKERSWebb · Laredo | 1 of 5 | $277,327 | $277,327 | Won |
| Oct 17, 2013 | 6263-30-001 | INSTALL/REMOVE RAISED PAVEMENT MARKERSWashington · Bryan | 3 of 8 | $116,100 | $95,000JASCO | +22.2% |
| Oct 17, 2013 | 6263-31-001 | INSTALL/REMOVE RAISED PAVEMENT MARKERSBrazos · Bryan | 3 of 8 | $116,100 | $95,000JASCO | +22.2% |
| Oct 17, 2013 | 6263-32-001 | INSTALL/REMOVE RAISED PAVEMENT MARKERSWalker · Bryan | 2 of 4 | $150,220 | $123,000JASCO | +22.1% |
| Oct 9, 2013 | 0005-01-105 | PROFILE PAVEMENT MARKERSEctor · Odessa | 8 of 8 | $2,114,898 | $1,504,555FLAT LINE, INC. | +40.6% |
| Feb 14, 2012 | 6238-22-001 | INSTALL SHORTLINE MARKINGSWalker · Bryan | 1 of 6 | $173,690 | $173,690 | Won |
Subcontracts on active jobs 41
| CCSJ | Prime contractor | Where | Work | Share | Value (est.) |
|---|---|---|---|---|---|
| 0343-03-029Let Dec 2, 2025 | NORTHEASTERN PAVERS, LLC | ErathFort Worth | SEAL COAT | 28.13% | $2,494,416 |
| 0043-14-028Let Nov 6, 2025 | RONALD R. WAGNER & CO., LP | WichitaWichita Falls | SEAL COAT | 15.16% | $1,557,623 |
| 0040-01-051Let Nov 6, 2025 | Missouri Petroleum Products Company | DallamAmarillo | SEAL COAT | 0% | $0 |
| 0057-03-047Let Oct 9, 2025 | CLARK CONSTRUCTION OF TEXAS, INC. | FreestoneBryan | SEAL COAT | 8.9% | $1,659,361 |
| 6489-01-001Let Oct 9, 2025 | RONALD R. WAGNER & CO., LP | WilsonSan Antonio | MAINTENANCE | 0% | $0 |
| 0036-08-056Let Oct 8, 2025 | RONALD R. WAGNER & CO., LP | UvaldeSan Antonio | REHABILITATION OF EXISTING ROAD | 12.08% | $735,521 |
| 0017-06-094Let Oct 8, 2025 | RONALD R. WAGNER & CO., LP | FrioSan Antonio | REHABILITATION OF EXISTING ROAD | 9.44% | $820,819 |
| 1806-01-013Let Sep 5, 2025 | CK NEWBERRY, LLC | CameronPharr | SEAL COAT | 3.56% | $166,699 |
| 0386-04-014Let Sep 5, 2025 | CLARK CONSTRUCTION OF TEXAS, INC. | BosqueWaco | SEAL COAT | 12.4% | $685,474 |
| 0331-01-053Let Sep 5, 2025 | CK NEWBERRY, LLC | CameronPharr | SEAL COAT | 2.98% | $190,756 |
| 0253-04-159Let Jul 2, 2025 | APEX LANDSCAPE & IRRIGATION, LLC | BexarSan Antonio | LANDSCAPE & SCENIC ENHANCEMENT | 0.96% | $17,987 |
| 0024-07-059Let Jun 5, 2025 | JORDAN FOSTER CONSTRUCTION, LLC | BexarSan Antonio | CONVERT NON-FREEWAY TO FREEWAY | 0.17% | $212,225 |
| 0613-01-070Let Apr 4, 2025 | CK NEWBERRY, LLC | BexarSan Antonio | HAZARD ELIMINATION & SAFETY | 1.44% | $127,619 |
| 0142-04-052Let Apr 3, 2025 | ACEE CONSTRUCTION LLC. | KerrSan Antonio | MISCELLANEOUS CONSTRUCTION | 1.51% | $21,197 |
| 0922-00-078Let Mar 4, 2025 | DELGADO'S CONTRACTORS, LLC | WebbLaredo | BRIDGE REPLACEMENT | 0% | $0 |
| 0025-09-081Let Feb 6, 2025 | TEXAS MATERIALS GROUP, INC. | BexarSan Antonio | REHABILITATION OF EXISTING ROAD | 0.24% | $52,032 |
| 2452-04-017Let Aug 2, 2024 | STERLING DELAWARE HOLDING COMPANY | BexarSan Antonio | WIDEN FREEWAY | 0.36% | $60,181 |
| 0073-13-012Let May 3, 2024 | RELMCO, INC. | AtascosaSan Antonio | BRIDGE REPLACEMENT | 0.73% | $35,875 |
| 0015-13-438Let May 2, 2024 | HARPER BROTHERS CONSTRUCTION LLC | TravisAustin | BRIDGE REPLACEMENT | 1.09% | $382,818 |
| 0941-04-019Let Mar 5, 2024 | HUNTER INDUSTRIES, LTD. | VictoriaYoakum | REHABILITATION OF EXISTING ROAD | 0.3% | $29,864 |
| 0161-03-025Let Mar 5, 2024 | DELGADO'S CONTRACTORS, LLC | Val VerdeLaredo | MISCELLANEOUS CONSTRUCTION | 0% | $0 |
| 2452-02-130Let Oct 6, 2023 | PULICE CONSTRUCTION, INC. | BexarSan Antonio | WIDEN FREEWAY | 0.8% | $1,551,851 |
| 1433-02-044Let May 4, 2023 | HARPER BROTHERS CONSTRUCTION LLC | ComalSan Antonio | WIDEN NON-FREEWAY | 1.02% | $494,740 |
| 0291-06-053Let May 4, 2023 | STERLING DELAWARE HOLDING COMPANY | BanderaSan Antonio | WIDEN FREEWAY | 0.45% | $76,542 |
| 2520-01-016Let Mar 8, 2023 | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | MedinaSan Antonio | BRIDGE REPLACEMENT | 2.12% | $137,977 |
| 3508-01-029Let Jan 6, 2023 | AUSTIN BRIDGE & ROAD SERVICES, LP | BexarSan Antonio | WIDEN FREEWAY | 1.48% | $1,605,608 |
| 2649-01-035Let Dec 2, 2022 | RELMCO, INC. | MedinaSan Antonio | BRIDGE REPLACEMENT | 0.51% | $21,845 |
| 0017-10-289Let Oct 7, 2022 | GIBSON & ASSOCIATES, INC. | BexarSan Antonio | OVERLAY | 1.02% | $415,372 |
| 0215-01-044Let Jun 30, 2022 | WEBBER, LLC | ComalSan Antonio | WIDEN NON-FREEWAY | 0.86% | $529,255 |
| 1799-02-017Let Jun 2, 2022 | ATLANTIC SPECIALTY INSURANCE COMPANY | DimmitLaredo | REHABILITATION OF EXISTING ROAD | 1.69% | $117,146 |
| 0072-08-144Let Jun 1, 2022 | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | BexarSan Antonio | WIDEN FREEWAY | 0.57% | $2,395,273 |
| 0849-01-055Let Dec 2, 2021 | HARPER BROTHERS CONSTRUCTION LLC | BexarSan Antonio | WIDEN FREEWAY | 0.4% | $222,952 |
| 0025-03-097Let Nov 3, 2021 | WEBBER, LLC | GuadalupeSan Antonio | WIDEN FREEWAY | 0.12% | $165,441 |
| 0648-03-049Let Jul 2, 2021 | BIG CREEK CONSTRUCTION, LTD. | BurlesonBryan | WIDEN NON-FREEWAY | 0.68% | $240,412 |
| 0016-05-120Let Jun 4, 2021 | TEXAS MATERIALS GROUP, INC. | ComalSan Antonio | MISCELLANEOUS CONSTRUCTION | 0.35% | $23,801 |
| 2452-02-083Let Apr 7, 2021 | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | BexarSan Antonio | WIDEN FREEWAY | 0.63% | $972,890 |
| 0016-08-039Let Apr 7, 2021 | RELMCO, INC. | BexarSan Antonio | BRIDGE REPLACEMENT | 0.52% | $37,589 |
| 0521-06-138Let Mar 5, 2021 | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | BexarSan Antonio | TRAFFIC SIGNAL | 0.41% | $452,007 |
| 2399-01-074Let Sep 4, 2020 | KNIFE RIVER CORPORATION - SOUTH | BrazosBryan | WIDEN NON-FREEWAY | 0.69% | $372,739 |
| 0479-04-038Let Sep 3, 2020 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY | WinklerOdessa | REHABILITATION OF EXISTING ROAD | 0.95% | $456,620 |
| 0739-02-162Let Jul 11, 2018 | ZURICH AMERICAN INSURANCE COMPANY | JeffersonBeaumont | WIDEN FREEWAY | 0.52% | $710,124 |