125Let jobs
$435,767,363Total low bids
$430,739,526Total estimates
+1.2%Low bids vs estimates
Mar 2019 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Mar 27, 2019 | 6342-27-001RMC - 634227001 | Tom Green San Angelo |
CLEANING AND SWEEPING OF HIGHWAYSUS 67 · | $299,858 | $314,833 | E.V.G. ENTERPRISE | +5.0% | 3 |
| Mar 27, 2019 | 6338-62-001RMC - 633862001 | Gillespie Austin |
MOWING OF RIGHT OF WAYUS 87 · | $191,693 | $171,593 | P-VILLE, INCORPORATED | -10.5% | 1 |
| Mar 26, 2019 | 6341-40-001RMC - 634140001 | Jefferson Beaumont |
CALL OUT STRIPINGFM 1009 · | $196,906 | $205,232 | CRABTREE BARRICADE SYSTEMS, INC. | +4.2% | 2 |
| Mar 21, 2019 | 6340-85-001BPM - 634085001 | Hopkins Paris |
BPM - BRIDGE BEAM/DECK REPAIRIH 30 · | $215,020 | $197,280 | WINDING ROAD CONSTRUCTION, INC. | -8.3% | 7 |
| Mar 21, 2019 | 6340-86-001BPM - 634086001 | Hunt Paris |
BPM - EROSION/RIPRAP REPAIRIH 30 · | $88,090 | $89,180 | JOHN & DENISE WILLIAMS CONSTRUCTION COMPANY LLC | +1.2% | 7 |
| Mar 19, 2019 | 6343-09-001RMC - 634309001 | Live Oak Corpus Christi |
INSTALLATION OF ITSIH 37 · | $192,228 | $240,600 | MALDONADO-BURKETT, LLP | +25.2% | 3 |
| Mar 19, 2019 | 6343-24-001RMC - 634324001 | San Patricio Corpus Christi |
TRAFFIC SIGNAL WORKUS 77 · | $235,981 | $224,345 | MALDONADO-BURKETT, LLP | -4.9% | 4 |
| Mar 6, 2019 | 0114-07-036NH 2019(609) | Lee Austin |
WIDEN GR STRS BS & SURFUS 290 · | $30,340,011 | $28,375,954 | BIG CREEK CONSTRUCTION, LTD. | -6.5% | 4 |
| Mar 6, 2019 | 0168-01-030NH 2019(611) | Parmer Lubbock |
REHABILITATION OF EXISTING ROADWAYUS 60 · | $22,595,829 | $25,525,378 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY | +13.0% | 3 |
| Mar 6, 2019 | 0342-01-074STP 2019(085) | Hidalgo Pharr |
CONST 6 LN DIV RURALSH 107 · | $20,285,142 | $21,103,891 | FOREMOST PAVING, INC. | +4.0% | 4 |
| Mar 6, 2019 | 0006-02-115NH 2019(522) | Nolan Abilene |
2" MILL & FILL, 1 CST AND 2" SMA DIH 20 · | $10,677,998 | $16,511,820 | J. H. STRAIN & SONS, INC. | +54.6% | 2 |
| Mar 6, 2019 | 0015-08-141NH 2019(683) | Williamson Austin |
REPLACE BRIDGE OVERPASS AND TIE-IN APPROACHESIH 35 · | $15,646,512 | $15,048,230 | DAN WILLIAMS COMPANY | -3.8% | 7 |
| Mar 6, 2019 | 0017-04-042NH 2019(646) | Atascosa San Antonio |
BS RPR, SC, OVLY & PAV MRKS ON MAINLANESIH 35 · | $14,294,767 | $12,910,717 | H. L. ZUMWALT CONSTRUCTION, INC. | -9.7% | 6 |
| Mar 6, 2019 | 0016-03-119NH 2019(606) | Hays Austin |
MILL, SEAL, AND PFC-C INLAYIH 35 · | $11,221,933 | $11,983,120 | LONE STAR PAVING COMPANY | +6.8% | 6 |
| Mar 6, 2019 | 0446-03-047BR 2019(096) | Colorado Yoakum |
REPLACE BRIDGE AND APPROACHESUS 90A · | $8,043,817 | $10,990,759 | EARTH BUILDERS, L.P. | +36.6% | 3 |
| Mar 6, 2019 | 0912-72-371STP 1802(478)MM | Harris Houston |
TURN LNS,AUX LNS,RAISED MEDS,GEOMETRIC IMPROVEMENTVA · | $8,859,186 | $8,619,571 | MAIN LANE INDUSTRIES LTD. | -2.7% | 3 |
| Mar 6, 2019 | 0172-05-122NH 2019(670) | Ellis Dallas |
PAVEMENT REPAIR AND OVERLAYUS 287 · | $8,967,371 | $7,983,934 | AUSTIN BRIDGE & ROAD SERVICES, LP | -11.0% | 3 |
| Mar 6, 2019 | 0050-01-086NH 2019(681) | Brazos Bryan |
CONCRETE PAVEMENT REPAIRBS 6-R · | $8,761,103 | $5,989,655 | MAIN LANE INDUSTRIES LTD. | -31.6% | 3 |
| Mar 6, 2019 | 0015-08-151NH 2019(793) | Williamson Austin |
MILL, SEAL AND OVERLAY SOUTHBOUND MAIN LANESIH 35 · | $5,034,096 | $5,984,750 | AUSTIN MATERIALS, LLC | +18.9% | 4 |
| Mar 6, 2019 | 0313-02-059STP 2019(632) | Parker Fort Worth |
BASE RPR, MILL, OVERLAY, PAVMT MARKFM 51 · | $6,726,813 | $5,871,768 | BLYTHE CONSTRUCTION, INC. | -12.7% | 6 |
| Mar 6, 2019 | 2452-03-123C 2452-3-123 | Bexar San Antonio |
OVERLAYSL 1604 · | $3,933,436 | $4,014,717 | ANGEL BROTHERS HOLDINGS CORP. | +2.1% | 6 |
| Mar 6, 2019 | 0097-02-039STP 2019(589) | Hardeman Childress |
REHABILITAION OF EXISTING ROADWAYSH 6 · | $4,605,247 | $3,994,436 | JCCC, INC. | -13.3% | 4 |
| Mar 6, 2019 | 0150-04-047STP 2019(610) | Llano Austin |
GR, BASE, HMACP & PVMT MRKSSH 29 · | $3,538,178 | $3,884,999 | ACME BRIDGE COMPANY, INC. | +9.8% | 6 |
| Mar 6, 2019 | 0598-02-110NH 2019(624) | Brazoria Houston |
U-TURN & ACCEL/DECEL LANESSH 288 · | $2,852,771 | $3,067,734 | DURWOOD GREENE CONSTRUCTION CO. | +7.5% | 2 |
| Mar 6, 2019 | 6334-17-001RMC - 633417001 | Harris Houston |
REPAIR SLOPE FAILURESSH 225 · | $2,845,498 | $2,794,173 | JAMES CONSTRUCTION GROUP, L.L.C. | -1.8% | 6 |
| Mar 6, 2019 | 0200-14-086STP 2019(622) | Jefferson Beaumont |
REMOVE CONCRETE, GR, BS, SMAUS 69 · | $2,347,356 | $2,395,590 | TEXAS MATERIALS GROUP, INC. | +2.1% | 3 |
| Mar 6, 2019 | 1912-02-014STP 2019(627) | Montgomery Houston |
FULL DEPTH REP, PV MKS & O/LFM 2090 · | $2,362,733 | $2,298,814 | SMITH & COMPANY | -2.7% | 2 |
| Mar 6, 2019 | 6343-03-001RMC - 634303001 | Menard San Angelo |
WIDENING OF ROADWAYRM 1773 · | $2,318,308 | $2,247,139 | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | -3.1% | 2 |
| Mar 6, 2019 | 0030-02-053STP 2019(602)HES | Ochiltree |
IMPROVE TRAFFIC SIGNALS & INTERCONNECT SIGNALSUS 83 · | $1,827,259 | $2,152,763 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +17.8% | 1 |
| Mar 6, 2019 | 0206-07-062C 206-7-62 | Rusk Tyler |
PLNG,BS RPR,PFC,MBGF,SUPERPV,OCSTUS 79 · | $2,163,415 | $1,940,981 | FOUTSCO PAVING COMPANY, LLC | -10.3% | 6 |
| Mar 6, 2019 | 0916-00-212STP 2019(673) | Nueces Corpus Christi |
DISTRICT WIDE SMALL SIGN REPLACEMENTVA · | $2,144,860 | $1,847,392 | CHAMPION INFRASTRUCTURE, LLC | -13.9% | 7 |
| Mar 6, 2019 | 0074-01-055C 74-1-55 | Live Oak Corpus Christi |
REHAB AND WIDEN-WEST FRTG LANES ONLYIH 37 · | $1,927,013 | $1,839,972 | HUNTER INDUSTRIES, LTD. | -4.5% | 8 |
| Mar 6, 2019 | 0699-01-055C 699-1-55 | Taylor Abilene |
MILL AND OVERLAYFM 89 · | $1,857,959 | $1,793,003 | FOUTSCO PAVING COMPANY, LLC | -3.5% | 4 |
| Mar 6, 2019 | 6339-68-001RMC - 633968001 | Dallas Dallas |
TRAFFIC SIGNAL MAINTENANCEIH 35E · | $1,268,480 | $1,750,000 | DURABLE SPECIALTIES, INC. | +38.0% | 2 |
| Mar 6, 2019 | 0336-03-071STP 2019(635) | Angelina Lufkin |
WIDENING PAVING FOR ADDITIONAL TURNING LANESSH 103 · | $1,217,321 | $1,665,263 | LONGVIEW BRIDGE AND ROAD, LTD. | +36.8% | 3 |
| Mar 6, 2019 | 1390-03-005BR 2018(791) | Wood Tyler |
REPLACE BRIDGE & APPROACHESFM 1254 · | $1,663,512 | $1,518,306 | STATELINE CONSTRUCTION, LLC | -8.7% | 7 |
| Mar 6, 2019 | 0177-03-104NH 2019(621) | Liberty Beaumont |
PFC MILL AND INLAYUS 59 · | $1,633,621 | $1,514,862 | FORDE CONSTRUCTION COMPANY, INC. | -7.3% | 5 |
| Mar 6, 2019 | 2249-01-008STP 2019(674) | Kaufman Dallas |
REHABILITATION OF EXISTING PAVEMENT AND ADD SHLDRSFM 460 · | $1,543,310 | $1,469,990 | ED BELL CONSTRUCTION COMPANY | -4.8% | 6 |
| Mar 6, 2019 | 6341-04-001RMC - 634104001 | Brazoria Houston |
REFL PAV MRKS (LONG LINE)SH 288 · | $1,479,298 | $1,396,453 | PMI PAVEMENT MARKING, LLC | -5.6% | 3 |
| Mar 6, 2019 | 6341-53-001RMC - 634153001 | Orange Beaumont |
DW DITCH CLEANINGSH 87 · | $1,271,100 | $1,171,350 | TEXAS DRAINAGE INC. | -7.8% | 1 |
| Mar 6, 2019 | 0903-15-085BR 2006(656) | Cooke Wichita Falls |
REPLACE BRIDGE AND APPROACHESCR · | $1,043,507 | $1,090,040 | HODGES AND SON CONSTRUCTION COMPANY, INC. | +4.5% | 9 |
| Mar 6, 2019 | 6339-02-001BPM - 633902001 | Randall Amarillo |
2019 BRIDGE PREVENTATIVE MAINTENANCEIH 27 · | $898,026 | $1,009,428 | GILVIN-TERRILL, LTD. | +12.4% | 7 |
| Mar 6, 2019 | 6341-29-001RMC - 634129001 | Galveston Houston |
DREDGE (FY19) BOLIVAR FERRY LANDINGSH 87 · | $775,000 | $966,000 | CALLAN MARINE LTD | +24.6% | 3 |
| Mar 6, 2019 | 6341-61-001RMC - 634161001 | Hardin Beaumont |
TREE AND BRUSH REMOVALUS 69 · | $1,022,900 | $876,960 | CROSS PLUS CONSTRUCTION, LLC | -14.3% | 3 |
| Mar 6, 2019 | 6324-81-001RMC - 632481001 | Brazoria Houston |
REPAIR OF SLOPE FAILURESH 288 · | $570,952 | $777,123 | CHAMPION INFRASTRUCTURE, LLC | +36.1% | 4 |
| Mar 6, 2019 | 6341-65-001RMC - 634165001 | El Paso El Paso |
CLEANING & SWEEPINGIH 10 · | $766,825 | $739,925 | E. G. L. CONSTRUCTION, INC. | -3.5% | 1 |
| Mar 6, 2019 | 1407-01-028STP 2019(636)HES | Nacogdoches Lufkin |
SAFETY TREAT FIXED OBJECTSFM 1275 · | $780,095 | $718,362 | A R BROTHERS CONSTRUCTION SERVICES, INC. | -7.9% | 5 |
| Mar 6, 2019 | 0203-08-016STP 2019(619)HES | Smith Tyler |
CENTERLINE & EDGELINE PROFILE PAV MRKFM 1253 · | $1,178,936 | $706,777 | CENTERLINE TECHNOLOGIES, LLC | -40.0% | 5 |
| Mar 6, 2019 | 0918-00-287STP 2019(631) | Dallas Dallas |
WRONG WAY DRIVING IMPLEMENTATIONVA · | $685,409 | $671,750 | SELECT STRIPING LLC | -2.0% | 4 |
| Mar 6, 2019 | 6338-46-001RMC - 633846001 | Liberty Beaumont |
LIBERTY ~ ROW MOWINGUS 90 · | $650,380 | $618,564 | CLASSIC IRRIGATION & LANDSCAPE LLC | -4.9% | 4 |
| Mar 6, 2019 | 6342-17-001RMC - 634217001 | Kerr San Antonio |
PICNIC AREA MAINTENANCEIH 10 · | $629,800 | $601,200 | CLASSIC IRRIGATION & LANDSCAPE LLC | -4.5% | 2 |
| Mar 6, 2019 | 6341-95-001RMC - 634195001 | Collin Dallas |
DITCH, GUARDRAIL & ATTENUATOR CLEANINGUS 380 · | $269,400 | $526,650 | L & M MOWING CONTRACTORS, LLC | +95.5% | 2 |
| Mar 6, 2019 | 0401-03-026STP 2019(620)HES | Wood Tyler |
CENTERLINE & EDGELINE PROFILE PAV MRKSH 154 · | $895,151 | $491,543 | CENTERLINE TECHNOLOGIES, LLC | -45.1% | 5 |
| Mar 6, 2019 | 6338-50-001RMC - 633850001 | Hardin Beaumont |
KOUNTZE ~ ROW MOWINGUS 69 · | $530,820 | $463,128 | P-VILLE, INCORPORATED | -12.8% | 3 |
| Mar 6, 2019 | 6338-49-001RMC - 633849001 | Jefferson Beaumont |
PT ARTHUR ~ ROW MOWINGUS 69 · | $495,540 | $436,480 | CLASSIC IRRIGATION & LANDSCAPE LLC | -11.9% | 3 |
| Mar 6, 2019 | 6338-48-001RMC - 633848001 | Orange Beaumont |
ORANGE ~ ROW MOWINGIH 10 · | $472,500 | $412,280 | CLASSIC IRRIGATION & LANDSCAPE LLC | -12.7% | 3 |
| Mar 6, 2019 | 0906-00-176C 906-00-176 | Ector Odessa |
IH PAVEMENT MARKINGS (2019)VA · | $495,850 | $395,738 | VIZCAINO, L.P. | -20.2% | 5 |
| Mar 6, 2019 | 0913-28-066BR 2014(600) | Fayette Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $412,052 | $385,310 | JOHN REED AND COMPANY, LLC | -6.5% | 6 |
| Mar 6, 2019 | 0096-09-077STP 2019(658)HES | Harrison Atlanta |
IMPROVE TRAFFIC SIGNALUS 80 · | $427,824 | $381,550 | TEXAS TRAFFIC CONTROL SYSTEMS, INC. | -10.8% | 2 |
| Mar 6, 2019 | 6331-70-001RMC - 633170001 | Bexar San Antonio |
CONSTRUCT RIPRAPIH 410 · | $322,033 | $371,427 | RELMCO, INC. | +15.3% | 11 |
| Mar 6, 2019 | 6335-08-001RMC - 633508001 | Tarrant Fort Worth |
CALLOUT REFLECTORIZED PAVEMENT MARKINGSIH 35W · | $314,211 | $337,883 | TRP CONSTRUCTION GROUP, LLC | +7.5% | 3 |
| Mar 6, 2019 | 6338-51-001RMC - 633851001 | Tyler Beaumont |
WOODVILLE ~ ROW MOWINGUS 69 · | $337,800 | $298,979 | P-VILLE, INCORPORATED | -11.5% | 4 |
| Mar 6, 2019 | 6338-47-001RMC - 633847001 | Newton Beaumont |
NEWTON ~ ROW MOWINGUS 190 · | $335,880 | $297,234 | P-VILLE, INCORPORATED | -11.5% | 3 |
| Mar 6, 2019 | 6340-21-001RMC - 634021001 | Montgomery Houston |
MILL AND OVERLAYFM 2854 · | $217,106 | $280,461 | SMITH & COMPANY | +29.2% | 5 |
| Mar 6, 2019 | 6338-44-001RMC - 633844001 | Jefferson Beaumont |
BEAUMONT ~ ROW MOWINGIH 10 · | $247,240 | $221,901 | WAYNE YANCEY, INC. | -10.2% | 3 |
| Mar 6, 2019 | 0913-29-054STP 2019(310)TAPS | Lavaca Yoakum |
CONSTRUCT SIDEWALKSCS · | $197,777 | $192,922 | TREVWAY, INC. | -2.5% | 4 |
| Mar 5, 2019 | 1062-04-022NH 2019(626) | Harris Houston |
WIDEN TO 4-LANE DIVIDEDFM 2100 · | $43,921,829 | $43,751,963 | TRIPLE B SERVICES LLP | -0.4% | 9 |
| Mar 5, 2019 | 0095-13-043NH 2019(668) | Dallas Dallas |
MILL EB, FDCR, & OVERLAY EB & WBIH 20 · | $29,314,199 | $25,641,956 | AUSTIN BRIDGE & ROAD SERVICES, LP | -12.5% | 4 |
| Mar 5, 2019 | 0142-02-029C 142-2-29 | Kerr San Antonio |
BASE REPAIR, SEAL, OVERLAY & PAV MRKNGS ON MAINLNSIH 10 · | $15,062,463 | $17,870,936 | LONE STAR PAVING COMPANY | +18.6% | 4 |
| Mar 5, 2019 | 0030-02-052STP 2019(603) | Ochiltree |
OVERLAYUS 83 · | $14,148,590 | $13,814,377 | J. LEE MILLIGAN, INC. | -2.4% | 7 |
| Mar 5, 2019 | 0074-06-219NH 2019(666) | Nueces Corpus Christi |
MILL,UNDERSEAL,OVERLAY AND NOVACHIPIH 37 · | $9,899,337 | $10,228,897 | BAY LTD. | +3.3% | 3 |
| Mar 5, 2019 | 2242-02-022STP 2019(187)MM | Chambers Beaumont |
ADD CENTER LEFT TURN LANE AND WIDEN SHOULDERSFM 2354 · | $5,929,869 | $6,778,426 | COPASA, INC. | +14.3% | 4 |
| Mar 5, 2019 | 0558-06-016STP 2019(648) | Glasscock San Angelo |
RESTORATION OF EXISTING ROADRM 33 · | $5,711,544 | $6,698,939 | RK HALL, LLC | +17.3% | 4 |
| Mar 5, 2019 | 0275-12-074BR 2019(644) | Wheeler Childress |
BRIDGE MAINTENANCEIH 40 · | $4,723,032 | $5,409,042 | GILVIN-TERRILL, LTD. | +14.5% | 3 |
| Mar 5, 2019 | 0632-04-032SSW 632-4-32 | Harrison Atlanta |
GR, BS, STRS, SURF & PAV MRKSFM 451 · | $5,357,557 | $4,798,327 | H. V. CAVER, INC. | -10.4% | 5 |
| Mar 5, 2019 | 1905-01-009STP 2019(616) | Dawson Lubbock |
SUBGRADE WIDENING, FLXBASE, 2 COURSEFM 2052 · | $3,489,049 | $4,232,784 | A. L. HELMCAMP, INC. | +21.3% | 3 |
| Mar 5, 2019 | 0906-00-177C 906-00-177 | Ector Odessa |
NON-IH PAVEMENT MARKINGS (2019)VA · | $5,013,104 | $3,767,758 | VIZCAINO, L.P. | -24.8% | 5 |
| Mar 5, 2019 | 0902-90-113STP 2019(678) | Tarrant Fort Worth |
STRIPING & PAVEMENT MARKERSVA · | $3,821,931 | $2,821,091 | TRP CONSTRUCTION GROUP, LLC | -26.2% | 2 |
| Mar 5, 2019 | 0184-03-040NH 2019(596) | Bell Waco |
MILL AND INLAYSH 53 · | $2,323,760 | $2,670,992 | TEXAS MATERIALS GROUP, INC. | +14.9% | 4 |
| Mar 5, 2019 | 6338-94-001RMC - 633894001 | Burleson Bryan |
HMA OVERLAY, BASE REPAIR, MBGF STRIPINGFM 60 · | $2,971,217 | $2,580,121 | KNIFE RIVER CORPORATION - SOUTH | -13.2% | 3 |
| Mar 5, 2019 | 0010-06-042STP 2019(634)HES | Titus Atlanta |
SAFETY TREAT FIXED OBJECTSUS 67 · | $3,219,831 | $2,498,030 | LONGVIEW BRIDGE AND ROAD, LTD. | -22.4% | 10 |
| Mar 5, 2019 | 2897-01-017STP 2019(628) | Montgomery Houston |
FULL DEPTH REPAIR, PAVEMENT MARKINGS & OVERLAYFM 830 · | $2,607,386 | $2,483,807 | SMITH & COMPANY | -4.7% | 5 |
| Mar 5, 2019 | 6341-45-001RMC - 634145001 | Ector Odessa |
MILL AND INLAYIH 20 · | $1,922,850 | $2,294,115 | FNH CONSTRUCTION, LLC | +19.3% | 3 |
| Mar 5, 2019 | 6340-23-001RMC - 634023001 | Nueces Corpus Christi |
MILL AND FILLIH 37 · | $1,973,103 | $2,285,869 | BAY LTD. | +15.9% | 2 |
| Mar 5, 2019 | 0363-01-143NH 2019(633) | Tarrant Fort Worth |
BASE RPR, MILL, OVERLAY, PAVMT MARKSH 26 · | $2,631,513 | $2,116,624 | AUSTIN BRIDGE & ROAD SERVICES, LP | -19.6% | 9 |
| Mar 5, 2019 | 6339-87-001RMC - 633987001 | Hill Waco |
MILL AND INLAYFM 744 · | $1,510,178 | $2,049,550 | BIG CREEK CONSTRUCTION, LTD. | +35.7% | 3 |
| Mar 5, 2019 | 6340-98-001RMC - 634098001 | Grayson Paris |
FLEXIBLE PAVEMENT STRUCTURE REPAIRUS 377 · | $1,952,370 | $1,929,150 | A. K. GILLIS & SONS, INC. | -1.2% | 6 |
| Mar 5, 2019 | 0047-06-165NH 2019(630) | Collin Dallas |
FULL DEPTH CONCRETE REPAIRUS 75 · | $1,569,452 | $1,923,008 | O. TREVINO CONSTRUCTION, LLC | +22.5% | 6 |
| Mar 5, 2019 | 0367-01-069NH 2019(803) | Chambers Beaumont |
GR,BS, STR, ACP, STFOSH 124 · | $1,928,840 | $1,919,056 | TEXAS MATERIALS GROUP, INC. | -0.5% | 3 |
| Mar 5, 2019 | 0069-01-057NH 2019(640) | Howard Abilene |
DRAINAGE WORKUS 87 · | $1,105,870 | $1,866,062 | GILVIN-TERRILL, LTD. | +68.7% | 5 |
| Mar 5, 2019 | 0914-00-399STP 2019(614) | Travis Austin |
FY 2019 NON-SITE SPECIFIC SIGNALSVA · | $1,807,893 | $1,784,883 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -1.3% | 2 |
| Mar 5, 2019 | 0047-18-081NH 2017(244) | Grayson Paris |
REPAIR SLOPE FAILURE AND ROADWAYUS 75 · | $1,795,653 | $1,629,373 | ACCELERATED CRITICAL PATH, INC. | -9.3% | 7 |
| Mar 5, 2019 | 0698-03-095STP 2019(649)HES | Hidalgo Pharr |
SAFETY LIGHTINGFM 88 · | $1,815,432 | $1,620,585 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -10.7% | 4 |
| Mar 5, 2019 | 6341-87-001RMC - 634187001 | Henderson Tyler |
MILL & INLAYSH 19 · | $1,142,863 | $1,389,529 | LONGVIEW BRIDGE AND ROAD, LTD. | +21.6% | 4 |
| Mar 5, 2019 | 0183-01-045STP 2019(643) | Comanche Brownwood |
MILL AND OVERLAYSH 36 · | $1,472,244 | $1,347,886 | KNIFE RIVER CORPORATION - SOUTH | -8.4% | 5 |
| Mar 5, 2019 | 0941-02-019BR 2019(638) | De Witt Yoakum |
REPLACE BRIDGE AND APPROACHESFM 952 · | $1,197,799 | $1,347,305 | ACME BRIDGE COMPANY, INC. | +12.5% | 6 |
| Mar 5, 2019 | 0909-38-081BR 2018(295) | Falls Waco |
REPL BR & APPRSCR · | $1,390,650 | $1,340,677 | ELLIS-MCGINNIS CONSTRUCTION CO. | -3.6% | 6 |
| Mar 5, 2019 | 1176-02-019BR 2019(691) | Titus Atlanta |
REPLACE BRIDGE AND APPROACHESFM 899 · | $1,260,464 | $1,121,133 | EAST TEXAS BRIDGE, INC. | -11.1% | 10 |
| Mar 5, 2019 | 6338-18-001RMC - 633818001 | Travis Austin |
EMERGENCY DEBRIS REMOVAL AND DISPOSALIH 35 · | $1,052,380 | $973,340 | T.F.R. ENTERPRISES, INC. | -7.5% | 3 |
| Mar 5, 2019 | 0784-04-023STP 2019(623)HES | Orange Beaumont |
MODERNIZE BRIDGE RAIL,SAFETY TREAT FIXED OBJECTSFM 1131 · | $973,050 | $897,634 | NORMAN HIGHWAY CONSTRUCTORS, INC. | -7.8% | 6 |
1–100 of 125Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.