| 1 | 104-6054 |
REMOVING CONCRETE(MOW STRIP) | 19,375 | LF |
$3.00 |
$7.15 |
$8.00 |
$7.00 |
|
| 2 | 134-6004 |
BACKFILL (TY A OR B) | 1,795.89 | STA |
$150.00 |
$140.00 |
$275.00 |
$225.00 |
|
| 3 | 150-6001 |
BLADING | 1,795.89 | STA |
$90.00 |
$0.1000 |
$68.00 |
$75.00 |
|
| 4 | 161-6017 |
COMPOST MANUF TOPSOIL (4") | 199,555 | SY |
$1.00 |
$0.0100 |
$1.05 |
$2.00 |
|
| 5 | 164-6035 |
DRILL SEEDING (PERM) (RURAL) (CLAY) | 131,222 | SY |
$0.1200 |
$0.1100 |
$0.1200 |
$0.1200 |
|
| 6 | 164-6039 |
DRILL SEEDING (PERM) (URBAN) (CLAY) | 68,333 | SY |
$0.1200 |
$0.1100 |
$0.1200 |
$0.1200 |
|
| 7 | 168-6001 |
VEGETATIVE WATERING | 17,126 | MG |
$12.00 |
$0.1000 |
$0.0100 |
$24.00 |
|
| 8 | 346-6014 |
STONE-MTRX-ASPH SMA-D SAC-A PG76-22 | 104,826.4 | TON |
$100.00 |
$89.00 |
$118.00 |
$102.00 |
|
| 9 | 351-6008 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") | 1,000 | SY |
$30.00 |
$119.00 |
$95.00 |
$42.00 |
|
| 10 | 354-6003 |
PLAN & TEXT ASPH CONC PAV(0" TO 3") | 237,981 | SY |
$3.00 |
$1.54 |
$2.00 |
$2.00 |
|
| 11 | 354-6006 |
PLAN & TEXT ASPH CONC PAV(4" TO 6") | 192,034 | SY |
$7.00 |
$1.03 |
$1.22 |
$3.00 |
|
| 12 | 354-6017 |
PLAN & TEXT CONC PAV(0" TO 2") | 51,843 | SY |
$2.50 |
$5.15 |
$4.00 |
$2.85 |
|
| 13 | 361-6037 |
FULL - DEPTH REPAIR CPCD (12") | 12,800 | SY |
$160.00 |
$154.84 |
$174.00 |
$314.50 |
|
| 14 | 361-6038 |
FULL - DEPTH REPAIR CPCD (13") | 7,600 | SY |
$180.00 |
$166.49 |
$187.00 |
$339.50 |
|
| 15 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 1,145 | CY |
$430.00 |
$525.00 |
$520.00 |
$412.00 |
|
| 16 | 500-6001 |
MOBILIZATION | 1 | LS |
$2,500,000.00 |
$2,435,000.00 |
$3,072,785.00 |
$3,500,000.00 |
|
| 17 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 15 | MO |
$15,000.00 |
$23,000.00 |
$23,000.00 |
$5,000.00 |
|
| 18 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 312 | SY |
$20.00 |
$27.43 |
$29.00 |
$28.00 |
|
| 19 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 312 | SY |
$7.00 |
$8.97 |
$9.25 |
$9.00 |
|
| 20 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 30,460 | LF |
$2.50 |
$1.62 |
$1.75 |
$1.75 |
|
| 21 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 30,460 | LF |
$0.5000 |
$0.3200 |
$0.3500 |
$0.4000 |
|
| 22 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 2,751 | LF |
$4.00 |
$3.17 |
$3.25 |
$4.00 |
|
| 23 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 2,751 | LF |
$1.00 |
$0.4800 |
$0.5500 |
$0.5000 |
|
| 24 | 533-6003 |
RUMBLE STRIPS (SHOULDER) ASPHALT | 285,340 | LF |
$0.1200 |
$0.1300 |
$0.1300 |
$0.1400 |
|
| 25 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 20,612.5 | LF |
$20.00 |
$17.10 |
$18.00 |
$19.00 |
|
| 26 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 62 | EA |
$1,725.00 |
$1,325.00 |
$1,394.74 |
$1,400.00 |
|
| 27 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 38 | EA |
$1,250.00 |
$925.00 |
$973.68 |
$995.00 |
|
| 28 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 18,750 | LF |
$2.75 |
$1.45 |
$1.53 |
$1.75 |
|
| 29 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 64 | EA |
$260.00 |
$100.00 |
$105.26 |
$150.00 |
|
| 30 | 542-6004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 2 | EA |
$260.00 |
$100.00 |
$105.26 |
$170.00 |
|
| 31 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 88 | EA |
$2,500.00 |
$2,475.00 |
$2,605.26 |
$2,400.00 |
|
| 32 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 84 | EA |
$240.00 |
$225.00 |
$236.84 |
$200.00 |
|
| 33 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 8 | EA |
$600.00 |
$425.00 |
$894.74 |
$490.00 |
|
| 34 | 644-6064 |
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N) | 2 | EA |
$2,000.00 |
$1,700.00 |
$2,342.11 |
$2,100.00 |
|
| 35 | 644-6065 |
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S) | 6 | EA |
$2,000.00 |
$1,700.00 |
$2,526.32 |
$2,000.00 |
|
| 36 | 644-6076 |
REMOVE SM RD SN SUP&AM | 8 | EA |
$80.00 |
$75.00 |
$105.26 |
$75.00 |
|
| 37 | 644-6077 |
REMOVE BRDG MNT CLEARANCE SIGN ASSM | 8 | EA |
$500.00 |
$400.00 |
$684.21 |
$500.00 |
|
| 38 | 658-6001 |
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND | 227 | EA |
$70.00 |
$55.00 |
$63.16 |
$55.00 |
|
| 39 | 658-6013 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB | 70 | EA |
$25.00 |
$20.00 |
$24.21 |
$20.00 |
|
| 40 | 658-6018 |
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND | 79 | EA |
$70.00 |
$55.00 |
$63.16 |
$55.00 |
|
| 41 | 658-6026 |
INSTL DEL ASSM (D-SY)SZ (BRF)CTB | 70 | EA |
$19.00 |
$20.00 |
$24.21 |
$20.00 |
|
| 42 | 658-6036 |
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND | 251 | EA |
$70.00 |
$55.00 |
$63.16 |
$58.00 |
|
| 43 | 658-6061 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 | 212 | EA |
$27.00 |
$25.00 |
$27.37 |
$22.00 |
|
| 44 | 658-6064 |
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 | 185 | EA |
$23.00 |
$25.00 |
$27.37 |
$22.00 |
|
| 45 | 662-6001 |
WK ZN PAV MRK NON-REMOV (W)4"(BRK) | 1,704 | LF |
$0.4800 |
$0.5500 |
$0.3100 |
$0.3500 |
|
| 46 | 662-6004 |
WK ZN PAV MRK NON-REMOV (W)4"(SLD) | 65,047 | LF |
$0.2900 |
$0.3100 |
$0.3100 |
$0.3500 |
|
| 47 | 662-6034 |
WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 65,047 | LF |
$0.3100 |
$0.3100 |
$0.3100 |
$0.3500 |
|
| 48 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 11,257 | EA |
$0.7300 |
$0.8400 |
$1.00 |
$1.15 |
|
| 49 | 666-6036 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 20,462 | LF |
$1.10 |
$1.00 |
$0.8700 |
$1.00 |
|
| 50 | 666-6042 |
REFL PAV MRK TY I (W)12"(SLD)(100MIL) | 1,512 | LF |
$3.00 |
$3.00 |
$3.40 |
$3.25 |
|
| 51 | 666-6224 |
PAVEMENT SEALER 4" | 21,000 | LF |
$0.1500 |
$0.1800 |
$0.2100 |
$0.2100 |
|
| 52 | 666-6225 |
PAVEMENT SEALER 6" | 5,280 | LF |
$0.2000 |
$0.2500 |
$0.3100 |
$0.3500 |
|
| 53 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 164,660 | LF |
$0.3200 |
$0.3800 |
$0.4700 |
$0.4600 |
|
| 54 | 666-6306 |
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) | 58,030 | LF |
$0.4800 |
$0.5500 |
$0.5800 |
$0.6000 |
|
| 55 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 162,480 | LF |
$0.3200 |
$0.3800 |
$0.4800 |
$0.4600 |
|
| 56 | 666-6350 |
REFL PAV MRK TY I (W)12"(DOT)(100MIL) | 2,292 | LF |
$2.86 |
$2.75 |
$3.40 |
$3.25 |
|
| 57 | 672-6010 |
REFL PAV MRKR TY II-C-R | 6,519 | EA |
$3.00 |
$3.25 |
$3.75 |
$3.55 |
|
| 58 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 26,280 | LF |
$0.4000 |
$0.4500 |
$0.5100 |
$0.5000 |
|
| 59 | 678-6001 |
PAV SURF PREP FOR MRK (4") | 21,000 | LF |
$0.1000 |
$0.0500 |
$0.0850 |
$0.1000 |
|
| 60 | 678-6002 |
PAV SURF PREP FOR MRK (6") | 5,280 | LF |
$0.1000 |
$0.0500 |
$0.2100 |
$0.2500 |
|
| 61 | 734-6002 |
LITTER REMOVAL | 6 | CYC |
$2,500.00 |
$1,900.00 |
$1,200.00 |
$1,200.00 |
|
| 62 | 735-6001 |
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES) | 50 | CYC |
$2,300.00 |
$855.00 |
$4,000.00 |
$1,195.00 |
|
| 63 | 738-6001 |
CLEANING / SWEEPING (CENTER MEDIAN) | 10 | CYC |
$2,000.00 |
$1,800.00 |
$3,000.00 |
$1,775.00 |
|
| 64 | 3000-6003 |
CAM (ASPHALT) PG(76-22) | 3,868.8 | TON |
$110.00 |
$97.75 |
$138.00 |
$140.50 |
|
| 65 | 3000-6004 |
CAM (AGGREGATE) | 48,360.06 | TON |
$110.00 |
$97.75 |
$138.00 |
$140.50 |
|
| 66 | 3002-6001 |
MEMBRANE UNDERSEAL | 166,302.78 | GAL |
$2.50 |
$2.60 |
$3.00 |
$6.00 |
|
| 67 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 6 | EA |
$11,000.00 |
$17,750.00 |
$13,000.00 |
$13,250.00 |
|
| 68 | 6185-6001 |
TMA (STATIONARY) | 6 | EA |
$14,000.00 |
$31,000.00 |
$22,000.00 |
$10,000.00 |
|
| 69 | 6185-6003 |
TMA (MOBILE OPERATION) | 144 | HR |
$65.00 |
$110.00 |
$28.00 |
$50.00 |
|
| 70 | 800-6001 |
NO. OF WORKING DAYS | 4,000 | $/D |
$310.00 |
$300.00 |
$310.00 |
$310.00 |
|