Contact information
- tim@restekinc-tx.com
- Phone
- (512) 291-0602
- Fax
- (888) 291-9109
- Address
- 12403 LOWDEN LN, MANCHACA, TX 78652
- TxDOT prequalification
- Construction qualified
91BidsSep 10, 2013 to Nov 3, 2026
8Wins (low bidder)
8.8%Win rate
$6,989,342Total won
Competitor scorecard
Last 5 years in Texas10.0%Win rate2 of 20 bids
+20.5%Average bid vs estimate
+5.5%Winning bids vs estimate
+54.5%Over the low bid when they loseAverage field: 9.4 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| STRUCTURAL INTEGRITY GROUP LLC | 11 | 3 | 8 | 27% |
| BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | 11 | 7 | 4 | 64% |
| GARRET SHIELDS INFRASTRUCTURE | 10 | 0 | 10 | 0% |
| SCR CIVIL CONSTRUCTION, LLC | 10 | 7 | 3 | 70% |
| PREMIER CONTRACTORS LLC | 8 | 2 | 6 | 25% |
| ICOS MANAGEMENT, LLC | 8 | 2 | 6 | 25% |
| BK FIELD OPERATIONS LLC | 8 | 0 | 8 | 0% |
| BLACKSMITH VENTURES LLC | 7 | 5 | 2 | 71% |
| TAYLOR CONTRACTING LLC | 6 | 0 | 6 | 0% |
| MPB, INC. | 5 | 4 | 1 | 80% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Nov 3, 2026 | 6497-19-001 | FY 27 Districtwide BPMTravis · Austin | 8 of 13 | $1,653,920 | $1,080,402ROAD DOCTORS LLC | +53.1% |
| Oct 6, 2026 | 0204-01-075 | US 79 - At Drain (BMIP24)Williamson · Austin | 7 of 14 | $563,640 | $344,329TAYLOR BRIDGE LLC | +63.7% |
| Mar 5, 2026 | 0914-00-509 | FY 26 FUA - AUS BR MaintTravis · Austin | 10 of 14 | $2,131,289 | $1,606,502PREMIER CONTRACTORS LLC | +32.7% |
| Mar 5, 2026 | 0914-00-574 | BAAO/SAAO Bridge FUA Bridge RepairsTravis · Austin | 9 of 13 | $593,415 | $327,386TAYLOR BRIDGE LLC | +81.3% |
| Mar 4, 2026 | 0914-00-575 | GTAO/NAAO Bridge FUA RepairsTravis · Austin | 6 of 13 | $1,111,783 | $769,928BK FIELD OPERATIONS LLC | +44.4% |
| Feb 10, 2026 | 6494-76-001 | FY26 - SH 19 SB Bridge RepairWalker · Bryan | 3 of 7 | $79,671 | $57,501GARRET SHIELDS INFRASTRUCTU… | +38.6% |
| Mar 5, 2025 | 0290-01-050 | SH 16 - AT Oatman Crk - 25BMIPLlano · Austin | 9 of 10 | $2,906,997 | $2,089,129STRUCTURAL INTEGRITY GROUP … | +39.1% |
| Mar 4, 2025 | 2686-01-015 | FM 2571 - AT Gazley Crk - 25 BMIPBastrop · Austin | 9 of 19 | $250,273 | $180,204TAYLOR CONTRACTING LLC | +38.9% |
| Feb 20, 2025 | 6477-02-001 | Atascosa Bridge Preventative MaintAtascosa · San Antonio | 13 of 14 | $172,630 | $67,357BK FIELD OPERATIONS LLC | +156.3% |
| Feb 7, 2025 | 3136-01-207 | LP 1 - 25BMIPTravis · Austin | 4 of 5 | $756,748 | $720,110GIBSON & ASSOCIATES, INC. | +5.1% |
| Feb 6, 2025 | 0114-03-108 | US 290 - At Cottonwd & B Dry Ck, 25BMIPTravis · Austin | 8 of 13 | $385,095 | $304,980BK FIELD OPERATIONS LLC | +26.3% |
| Feb 6, 2025 | 0337-02-053 | SH 29 - AT San Gabriel Rv, 25BMIPWilliamson · Austin | 4 of 10 | $462,900 | $279,317BK FIELD OPERATIONS LLC | +65.7% |
| Jan 14, 2025 | 6476-84-001 | 6476-84-001 Conc. Struc. RepairLive Oak · Corpus Christi | 5 of 6 | $1,046,340 | $456,790RHINO EQUITY, LLC | +129.1% |
| Apr 5, 2024 | 0015-09-206 | BRIDGE MAINTENANCEWilliamson · Austin | 5 of 5 | $363,609 | $234,700RELMCO, INC. | +54.9% |
| Mar 5, 2024 | 6447-71-001 | BRIDGE PREVENTATIVE MAINTENANCEBastrop · Austin | 4 of 8 | $665,432 | $468,690RELMCO, INC. | +42.0% |
| May 4, 2023 | 6379-32-001 | BRIDGE REPAIRTravis · Austin | 6 of 6 | $649,365 | $406,975AMERICAN INFRASTRUCTURE MAI… | +59.6% |
| Aug 3, 2022 | 6379-31-001 | RIPRAP REPAIR AND BRIDGE RAILINGBlanco · Austin | 3 of 9 | $592,850 | $515,420RELMCO, INC. | +15.0% |
| Mar 3, 2022 | 6391-93-001 | BRIDGE REPAIRTravis · Austin | 1 of 2 | $1,429,650 | $1,429,650 | Won |
| Mar 3, 2022 | 6391-94-001 | BRIDGE REPAIRTravis · Austin | 1 of 3 | $1,558,775 | $1,558,775 | Won |
| Feb 3, 2022 | 6390-90-001 | CONCRETE STRUCTURE REPAIRTaylor · Abilene | 2 of 4 | $1,327,500 | $982,526CROSS PLUS CONSTRUCTION, LLC | +35.1% |
| Nov 16, 2021 | 6383-79-001 | BRIDGE PREVENTATIVE MAINTENANCESan Patricio · Corpus Christi | 6 of 6 | $381,039 | $239,350BECK-REIT & SONS, LTD. | +59.2% |
| Nov 3, 2021 | 6383-87-001 | BRIDGE PREVENTATIVE MAINTENANCEHaskell · Abilene | 2 of 6 | $590,591 | $523,85712TWELVE ROAD AND BRIDGE LLC | +12.7% |
| Oct 8, 2021 | 0908-00-110 | BRIDGE MAINTENANCETaylor · Abilene | 2 of 4 | $604,862 | $574,730SCR CIVIL CONSTRUCTION, LLC | +5.2% |
| Oct 8, 2021 | 6375-92-001 | CULVERT REPAIRChildress · Childress | 4 of 6 | $493,500 | $397,750CROSS PLUS CONSTRUCTION, LLC | +24.1% |
| Oct 7, 2021 | 6385-57-001 | BRIDGE REPAIRMadison · Bryan | 4 of 4 | $450,853 | $320,870KNIFE RIVER CORPORATION - S… | +40.5% |
| Sep 2, 2021 | 6364-21-001 | SCOUR AND EROSION CONTROLCaldwell · Austin | 2 of 8 | $734,173 | $675,858DEAN WORD COMPANY, LTD. | +8.6% |
| Sep 2, 2021 | 6380-87-001 | BRIDGE PREVENTATIVE MAINTENANCETarrant · Fort Worth | 7 of 7 | $829,155 | $455,945SCOTT TUCKER CONSTRUCTION C… | +81.9% |
| Aug 4, 2021 | 0043-09-144 | BRIDGE MAINTENANCEWichita · Wichita Falls | 2 of 4 | $3,498,719 | $3,356,261GIBSON & ASSOCIATES, INC. | +4.2% |
| Jun 16, 2021 | 6373-41-001 | REPLACE BEARING SEAT PADSUvalde · San Antonio | 5 of 5 | $208,000 | $76,800BLACKSMITH VENTURES LLC | +170.8% |
| May 6, 2021 | 0694-01-031 | BRIDGE MAINTENANCESabine · Lufkin | 3 of 4 | $1,447,045 | $1,095,147BUILT RIGHT CONSTRUCTION OF… | +32.1% |
| May 6, 2021 | 6375-31-001 | BRIDGE REPAIREctor · Odessa | 9 of 11 | $508,541 | $388,307MPB, INC. | +31.0% |
| Apr 7, 2021 | 0459-01-080 | BRIDGE MAINTENANCEFreestone · Bryan | 5 of 11 | $1,222,943 | $926,052GIBSON & ASSOCIATES, INC. | +32.1% |
| Mar 23, 2021 | 6377-47-001 | CONCRETE STRUCTURE REPAIRLive Oak · Corpus Christi | 4 of 10 | $297,455 | $238,185BECK-REIT & SONS, LTD. | +24.9% |
| Mar 17, 2021 | 6376-05-001 | BRIDGE SUBSTRUCTURE REPAIRAtascosa · San Antonio | 12 of 12 | $156,976 | $60,160SJ&J CONSTRUCTION, LLC | +160.9% |
| Feb 4, 2021 | 6361-79-001 | MISCELLANEOUS BRIDGE REPAIRHoward · Abilene | 7 of 14 | $598,880 | $425,867MPB, INC. | +40.6% |
| Jan 20, 2021 | 6373-19-001 | BRIDGE PREVENTIVE MAINTENANCEHouston · Lufkin | 5 of 7 | $237,380 | $206,123BOEN LANDSCAPING & IRRIGATI… | +15.2% |
| Jan 20, 2021 | 6368-60-001 | BRIDGE PREVENTATIVE MAINTENANCEShelby · Lufkin | 2 of 8 | $304,495 | $235,526SJ&J CONSTRUCTION, LLC | +29.3% |
| Jan 12, 2021 | 6364-82-001 | MISCELLANEOUS CONCRETE REPAIREllis · Dallas | 10 of 12 | $387,250 | $235,573SJ&J CONSTRUCTION, LLC | +64.4% |
| Jan 8, 2021 | 0073-09-040 | LANDSCAPE PLANTING AND IRRIGATIONBexar · San Antonio | 6 of 6 | $561,592 | $292,836ENCINO LANDSCAPE, INC. | +91.8% |
| Dec 3, 2020 | 6370-37-001 | 2021 BRIDGE PREVENTATIVE MAINTENANCECottle · Childress | 10 of 15 | $544,720 | $359,682ROAD DOCTORS LLC | +51.4% |
| Sep 15, 2020 | 6353-05-001 | BRIDGE PREVENTATIVE MAINTENANCETravis · Austin | 4 of 7 | $148,656 | $127,635BECK-REIT & SONS, LTD. | +16.5% |
| Sep 3, 2020 | 6354-22-001 | BRIDGE PREVENTATIVE MAINTENANCETarrant · Fort Worth | 6 of 7 | $463,220 | $275,544GIBSON & ASSOCIATES, INC. | +68.1% |
| Jul 9, 2020 | 6357-03-001 | BRIDGE PREVENTIVE MAINTENANCEWichita · Wichita Falls | 1 of 9 | $903,670 | $903,670 | Won |
| May 8, 2020 | 6353-21-001 | DISTRICTWIDE CONCRETE REPAIRTravis · Austin | 3 of 3 | $3,246,525 | $1,650,555ROY JORGENSEN ASSOCIATES, I… | +96.7% |
| Apr 9, 2020 | 6359-80-001 | CALLOUT BRIDGE REPAIREctor · Odessa | 2 of 5 | $616,000 | $490,575SCR CIVIL CONSTRUCTION, LLC | +25.6% |
| Apr 9, 2020 | 6360-25-001 | BRIDGE REPAIR (CALLOUT)Pecos · Odessa | 3 of 6 | $616,000 | $429,900RELMCO, INC. | +43.3% |
| Apr 8, 2020 | 0114-04-073 | REHABILITATE BRIDGEBastrop · Austin | 1 of 4 | $863,708 | $863,708 | Won |
| Feb 7, 2020 | 6352-82-001 | BRIDGE PREVENTATIVE MAINTENANCEWheeler · Childress | 2 of 8 | $722,325 | $697,998SCOTT TUCKER CONSTRUCTION C… | +3.5% |
| Aug 6, 2019 | 6335-80-001 | BRIDGE PREVENTATIVE MAINTENANCEMason · Austin | 4 of 5 | $648,441 | $338,504SJ&J CONSTRUCTION, LLC | +91.6% |
| May 8, 2019 | 0113-13-178 | REHABILITATE BRIDGETravis · Austin | 3 of 3 | $3,227,220 | $2,484,393SCR CIVIL CONSTRUCTION, LLC | +29.9% |
| Jan 9, 2019 | 6337-44-001 | 2019 BPM PROJECTChildress · Childress | 1 of 9 | $584,840 | $584,840 | Won |
| Dec 6, 2018 | 6337-96-001 | BRIDGE PREVENTATIVE MAINTENANCESabine · Lufkin | 5 of 8 | $1,095,265 | $717,347STATELINE CONSTRUCTION, LLC | +52.7% |
| Dec 6, 2018 | 6332-84-001 | BRIDGE PREVENTIVE MAINTENANCEHill · Waco | 5 of 7 | $644,990 | $478,750BECK-REIT & SONS, LTD. | +34.7% |
| Dec 5, 2018 | 6327-12-001 | SCOUR AND SPALL REPAIR,UPGRADE RAIL & DELAMINATIONBurnet · Austin | 2 of 7 | $496,252 | $406,0513LW CIVIL LLC | +22.2% |
| Oct 3, 2018 | 6335-42-001 | BRIDGE PREVENTATIVE MAINTENANCECooke · Wichita Falls | 2 of 9 | $683,949 | $661,892L.C. JORDAN & SON | +3.3% |
| Aug 8, 2018 | 0902-00-209 | BRIDGE MAINTENANCETarrant · Fort Worth | 3 of 3 | $1,640,888 | $984,722GIBSON & ASSOCIATES, INC. | +66.6% |
| Aug 8, 2018 | 6327-17-001 | SLOPE REPAIRTravis · Austin | 4 of 5 | $475,109 | $423,495RELMCO, INC. | +12.2% |
| Jul 11, 2018 | 6319-77-001 | BRIDGE PREVENTATIVE MAINTENANCETarrant · Fort Worth | 3 of 6 | $963,555 | $798,330SCOTT TUCKER CONSTRUCTION C… | +20.7% |
| Jun 6, 2018 | 0004-07-129 | BRIDGE REPAIREctor · Odessa | 5 of 6 | $2,626,571 | $1,932,677DCI CONTRACTING, INC. | +35.9% |
| Jun 5, 2018 | 0153-02-043 | MISC BRIDGE REPAIRGonzales · Yoakum | 4 of 4 | $3,878,485 | $3,013,760CHAMPION INFRASTRUCTURE, LLC | +28.7% |
| May 2, 2018 | 0320-03-099 | REPLACE DECK AND STRUCTURAL REPAIRSWilliamson · Austin | 6 of 8 | $1,562,400 | $1,149,643DAN WILLIAMS COMPANY | +35.9% |
| Apr 3, 2018 | 0017-10-267 | STRUCTURE REPAIR/REPLACE BRG EXPANSION JOINTSBexar · San Antonio | 5 of 5 | $6,494,545 | $4,831,650CHAMPION INFRASTRUCTURE, LLC | +34.4% |
| Apr 3, 2018 | 6327-84-001 | CONCRETE STRUCTURE & SCOUR REPAIRBee · Corpus Christi | 6 of 7 | $471,225 | $385,553BECK-REIT & SONS, LTD. | +22.2% |
| Apr 3, 2018 | 6318-53-001 | BRIDGE REPAIRDallas · Dallas | 7 of 8 | $548,200 | $249,653ED BELL CONSTRUCTION COMPANY | +119.6% |
| Mar 8, 2018 | 6318-83-001 | REHABILITATION OF VARIOUS BRIDGE FACILITIESWebb · Laredo | 4 of 4 | $244,740 | $194,391SCR CIVIL CONSTRUCTION, LLC | +25.9% |
| Mar 7, 2018 | 0908-00-085 | BRIDGE REPAIRTaylor · Abilene | 2 of 12 | $409,320 | $258,870AW&E CONSTRUCTION LLC | +58.1% |
| Mar 7, 2018 | 6328-47-001 | BRIDGE REPAIR CALL OUTEctor · Odessa | 4 of 5 | $581,625 | $453,300SCR CIVIL CONSTRUCTION, LLC | +28.3% |
| Mar 7, 2018 | 6327-01-001 | BRIDGE PREVENTATIVE MAINTENANCEBexar · San Antonio | 11 of 14 | $719,840 | $427,360RELMCO, INC. | +68.4% |
| Mar 6, 2018 | 6326-07-001 | BRIDGE REPAIRTerrell · Odessa | 4 of 8 | $546,197 | $469,676O. TREVINO CONSTRUCTION, LLC | +16.3% |
| Feb 1, 2018 | 6312-37-001 | MISCELLANEOUS BRIDGE REPAIRScurry · Abilene | 4 of 11 | $558,625 | $343,510SCR CIVIL CONSTRUCTION, LLC | +62.6% |
| Feb 1, 2018 | 6324-94-001 | MISCELLANEOUS CONCRETE REPAIRSMcLennan · Waco | 6 of 6 | $1,105,915 | $648,174DBI SERVICES, LLC | +70.6% |
| Jan 9, 2018 | 6325-86-001 | BRIDGE PREVENTIVE MAINTENANCEWilliamson · Austin | 1 of 6 | $169,160 | $169,160 | Won |
| Jan 9, 2018 | 6325-33-001 | CONCRETE RIP RAP AND SCOUR REPAIRMilam · Bryan | 3 of 3 | $150,550 | $78,905KNIFE RIVER CORPORATION - S… | +90.8% |
| Nov 14, 2017 | 6318-51-001 | BRIDGE REPAIRSCaldwell · Austin | 6 of 9 | $379,080 | $251,000MAIN LANE INDUSTRIES LTD. | +51.0% |
| Nov 2, 2017 | 0114-07-080 | BRIDGE REHABLee · Austin | 8 of 9 | $1,163,681 | $844,010DAN WILLIAMS COMPANY | +37.9% |
| Oct 4, 2017 | 0150-02-039 | BRIDGE REHAB & EROSION REPAIRLlano · Austin | 1 of 6 | $890,245 | $890,245 | Won |
| Aug 9, 2017 | 6319-59-001 | MISCELLANEOUS BRIDGE REPAIRBrown · Brownwood | 5 of 6 | $674,350 | $564,232FNH CONSTRUCTION, LLC | +19.5% |
| Aug 8, 2017 | 0005-06-117 | BRIDGE REHABHoward · Abilene | 6 of 9 | $1,688,994 | $1,316,919STRUCTURAL TECHNOLOGIES, LLC | +28.3% |
| Jul 12, 2017 | 0914-00-406 | CONCRETE PAVEMENT REPAIRSTravis · Austin | 3 of 5 | $1,682,005 | $1,116,909ROY JORGENSEN ASSOCIATES, I… | +50.6% |
| Jul 12, 2017 | 6307-51-001 | STRUCTURAL BRIDGE REPAIRTarrant · Fort Worth | 5 of 5 | $1,238,235 | $547,186GIBSON & ASSOCIATES, INC. | +126.3% |
| Mar 8, 2017 | 6312-12-001 | MISC. BRIDGE REPAIRSCarson · Amarillo | 8 of 9 | $1,041,800 | $430,115GILVIN-TERRILL, LTD. | +142.2% |
| Mar 8, 2017 | 6312-38-001 | CONC STRUCTURE REPAIR AND BRIDGE JOINTSPecos · Odessa | 9 of 14 | $495,935 | $318,870AW&E CONSTRUCTION LLC | +55.5% |
| Mar 8, 2017 | 6312-96-001 | ARMOR JOINT REPAIRLubbock · Lubbock | 5 of 6 | $896,905 | $590,724WINDING ROAD CONSTRUCTION, … | +51.8% |
| Mar 7, 2017 | 0043-14-024 | UPGRADE BRIDGE AND APPROACH RAILINGWichita · Wichita Falls | 4 of 4 | $491,038 | $351,296COPPELL CONSTRUCTION CO., I… | +39.8% |
| Mar 7, 2017 | 0015-11-063 | UPGRADE BRIDGE AND APPROACH RAILINGTravis · Austin | 4 of 6 | $254,429 | $213,086OPPORTUNITY EXCAVATION/CONC… | +19.4% |
| Feb 3, 2017 | 6312-47-001 | BRIDGE JOINT REPAIR AND REPLACEMENTTravis · Austin | 3 of 4 | $1,093,970 | $581,080SCR CIVIL CONSTRUCTION, LLC | +88.3% |
| Jan 5, 2017 | 6304-34-001 | BRIDGE MAINTENANCEWichita · Wichita Falls | 1 of 5 | $589,294 | $589,294 | Won |
| Jan 5, 2017 | 6295-91-001 | BPMHidalgo · Pharr | 4 of 6 | $570,950 | $344,250VALLEY INFRASTRUCTURE, INC. | +65.9% |
| Jan 5, 2017 | 6304-49-001 | BRIDGE MAINTENANCEHall · Childress | 3 of 10 | $533,560 | $469,370SILVER CREEK CONSTRUCTION, … | +13.7% |
| Nov 3, 2016 | 6307-84-001 | EMERGENCY BRIDGE REPAIREctor · Odessa | 3 of 5 | $697,625 | $412,850SCR CIVIL CONSTRUCTION, LLC | +69.0% |
| Sep 10, 2013 | 6253-80-001 | BRIDGE REPAIRHidalgo · Pharr | 5 of 6 | $1,593,456 | $923,455CKORP, LLC | +72.6% |
Active prime contracts 1
| CCSJ | Where | Work | Contract | Complete | Report |
|---|---|---|---|---|---|
| 6391-93-001Let Mar 3, 2022 | TravisAustin · US0183 | MAINTENANCE | $4,233,273 | 72% |
Subcontracts on active jobs 1
| CCSJ | Prime contractor | Where | Work | Share | Value (est.) |
|---|---|---|---|---|---|
| 6325-60-001Let Nov 6, 2018 | ROY JORGENSEN ASSOCIATES, INC. | TravisAustin | MAINTENANCE | 0% | $0 |