| 1 | 100-6002 |
PREPARING ROW | 5.68 | STA |
$1,000.00 |
$3,000.00 |
$5,000.00 |
$4,000.00 |
|
| 2 | 104-6009 |
REMOVING CONC (RIPRAP) | 12 | SY |
$60.00 |
$175.00 |
$150.00 |
$355.00 |
|
| 3 | 104-6030 |
REMOVING CONC (PILE ENCASEMENT) | 1 | CY |
$500.00 |
$1,000.00 |
$2,500.00 |
$1,000.00 |
|
| 4 | 164-6003 |
BROADCAST SEED (PERM) (RURAL) (CLAY) | 8,110 | SY |
$1.50 |
$0.9200 |
$1.00 |
$0.3000 |
|
| 5 | 168-6001 |
VEGETATIVE WATERING | 161 | MG |
$80.00 |
$35.00 |
$20.00 |
$50.00 |
|
| 6 | 169-6001 |
SOIL RETENTION BLANKETS (CL 1) (TY A) | 1,168 | SY |
$3.00 |
$2.00 |
$3.00 |
$2.01 |
|
| 7 | 354-6021 |
PLANE ASPH CONC PAV(0" TO 2") | 857 | SY |
$6.00 |
$12.50 |
$20.00 |
$20.00 |
|
| 8 | 401-6001 |
FLOWABLE BACKFILL | 11 | CY |
$300.00 |
$500.00 |
$1,800.00 |
$605.00 |
|
| 9 | 420-6070 |
CL C CONC (PILE ENCASEMENT) | 10 | CY |
$6,000.00 |
$2,000.00 |
$5,500.00 |
$5,000.00 |
|
| 10 | 420-6157 |
CL C CONC (COLUMN ENCASEMENT) | 6 | CY |
$6,000.00 |
$2,500.00 |
$5,500.00 |
$5,200.00 |
|
| 11 | 427-6004 |
SILICONE RESIN PAINT FINISH | 1,620 | SF |
$6.00 |
$8.50 |
$11.00 |
$11.00 |
|
| 12 | 427-6007 |
EPOXY WATERPROOF FINISH (TY X) | 1,235 | SF |
$12.00 |
$14.00 |
$25.00 |
$14.00 |
|
| 13 | 429-6007 |
CONC STR REPAIR (VERTICAL & OVERHEAD) | 143 | SF |
$250.00 |
$200.00 |
$250.00 |
$360.00 |
|
| 14 | 432-6001 |
RIPRAP (CONC)(4 IN) | 1 | CY |
$1,000.00 |
$1,000.00 |
$3,500.00 |
$1,000.00 |
|
| 15 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 107 | CY |
$250.00 |
$225.00 |
$225.00 |
$214.50 |
|
| 16 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 53 | CY |
$490.00 |
$625.00 |
$450.00 |
$522.50 |
|
| 17 | 438-6001 |
CLEANING AND SEALING EXISTING JOINTS | 258 | LF |
$35.00 |
$40.00 |
$100.00 |
$103.00 |
|
| 18 | 438-6005 |
CLEANING AND SEALING JOINTS | 129 | LF |
$25.00 |
$75.00 |
$100.00 |
$68.00 |
|
| 19 | 446-6024 |
CLEAN & PAINT EXIST PILING (SYSTEM II) | 1 | LS |
$70,000.00 |
$132,500.00 |
$135,000.00 |
$228,750.00 |
|
| 20 | 483-6016 |
MILLING CONCRETE SLAB (1/4IN) | 857 | SY |
$10.00 |
$12.50 |
$30.00 |
$20.00 |
|
| 21 | 500-6001 |
MOBILIZATION | 1 | LS |
$82,225.00 |
$30,000.00 |
$75,000.00 |
$115,000.00 |
|
| 22 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 | MO |
$9,000.00 |
$3,000.00 |
$4,500.00 |
$21,500.00 |
|
| 23 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 780 | SY |
$27.00 |
$18.75 |
$25.00 |
$16.25 |
|
| 24 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 780 | SY |
$13.00 |
$13.75 |
$12.00 |
$4.25 |
|
| 25 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 3,375 | LF |
$10.00 |
$5.00 |
$4.00 |
$2.00 |
|
| 26 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 3,375 | LF |
$5.00 |
$1.50 |
$1.50 |
$1.00 |
|
| 27 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 775 | LF |
$26.00 |
$28.25 |
$40.00 |
$23.50 |
|
| 28 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$1,900.00 |
$2,150.00 |
$3,500.00 |
$1,775.00 |
|
| 29 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 3 | EA |
$1,800.00 |
$1,320.00 |
$3,500.00 |
$1,100.00 |
|
| 30 | 540-6018 |
MTL BM GD FEN TRANS (NON - SYM) | 3 | EA |
$950.00 |
$930.00 |
$3,500.00 |
$770.00 |
|
| 31 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 775 | LF |
$4.00 |
$2.65 |
$5.00 |
$2.25 |
|
| 32 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 3 | EA |
$310.00 |
$180.00 |
$500.00 |
$150.00 |
|
| 33 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$3,000.00 |
$3,640.00 |
$3,500.00 |
$3,000.00 |
|
| 34 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 4 | EA |
$420.00 |
$300.00 |
$800.00 |
$250.00 |
|
| 35 | 658-6061 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 | 8 | EA |
$55.00 |
$36.00 |
$40.00 |
$30.00 |
|
| 36 | 658-6064 |
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 | 8 | EA |
$28.00 |
$36.00 |
$40.00 |
$30.00 |
|
| 37 | 662-6063 |
WK ZN PAV MRK REMOV (W)4"(SLD) | 4,655 | LF |
$2.00 |
$1.60 |
$2.00 |
$1.50 |
|
| 38 | 662-6095 |
WK ZN PAV MRK REMOV (Y)4"(SLD) | 4,655 | LF |
$2.00 |
$1.60 |
$2.00 |
$1.50 |
|
| 39 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 354 | EA |
$2.00 |
$3.00 |
$8.00 |
$7.50 |
|
| 40 | 666-6300 |
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) | 1,180 | LF |
$0.5000 |
$3.35 |
$4.00 |
$2.75 |
|
| 41 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 122 | LF |
$0.5000 |
$6.65 |
$50.00 |
$5.50 |
|
| 42 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 122 | LF |
$0.5000 |
$6.65 |
$50.00 |
$5.50 |
|
| 43 | 672-6010 |
REFL PAV MRKR TY II-C-R | 59 | EA |
$5.00 |
$40.00 |
$25.00 |
$33.00 |
|
| 44 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 1,180 | LF |
$3.00 |
$3.35 |
$3.00 |
$2.75 |
|
| 45 | 678-6001 |
PAV SURF PREP FOR MRK (4") | 1,424 | LF |
$1.00 |
$2.00 |
$2.00 |
$1.65 |
|
| 46 | 770-6029 |
REM & RESET SGT IMPACT HEAD | 2 | EA |
$1,500.00 |
$750.00 |
$5,500.00 |
$1,000.00 |
|
| 47 | 780-6002 |
CNC CRACK REPAIR (DISCRETE)(INJECT) | 6 | LF |
$200.00 |
$150.00 |
$800.00 |
$250.00 |
|
| 48 | 780-6004 |
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL) | 81 | LF |
$60.00 |
$20.00 |
$150.00 |
$60.00 |
|
| 49 | 4027-6001 |
TEMP CONSTRUCTION ACCESS | 5 | LS |
$2,000.00 |
$1,000.00 |
$10,000.00 |
$1,000.00 |
|
| 50 | 4106-6002 |
POLYESTER POLYMER CONC OVERLAY (1-1/2") | 857 | SY |
$200.00 |
$300.00 |
$50.00 |
$200.00 |
|
| 51 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 3 | EA |
$10,000.00 |
$8,000.00 |
$10,000.00 |
$14,750.00 |
|
| 52 | 6185-6002 |
TMA (STATIONARY) | 100 | DAY |
$400.00 |
$225.00 |
$300.00 |
$350.00 |
|
| 53 | 6185-6003 |
TMA (MOBILE OPERATION) | 24 | HR |
$200.00 |
$45.00 |
$50.00 |
$85.00 |
|