‹ Mar 2026 results
BAAO/SAAO Bridge FUA Bridge Repairs
- Let date
- Thursday, March 5, 2026
- CCSJ
- 0914-00-574
- District
- Austin
- County
- Travis
- Highway
- Various
- Limits
- Various Bridge Locations: Bastrop to Bastrop County
- Classification
- Bridge Maintenance · Construction
- Project number
- C 914-00-574
- Working days
- 131
- DBE goal
- 0%
Bidders 13
| # | Contractor | Total bid | vs estimate | vs low |
| EE | Engineer's estimate | $518,718 | | |
| 1 |
TAYLOR BRIDGE LLC Low bidder |
$327,386 |
-36.9% |
|
| 2 |
BK FIELD OPERATIONS LLC |
$343,231 |
-33.8% |
+4.8% |
| 3 |
BECK-REIT & SONS, LTD. |
$361,165 |
-30.4% |
+10.3% |
| 4 |
ROY JORGENSEN ASSOCIATES, INC. |
$390,327 |
-24.8% |
+19.2% |
| 5 |
ICOS MANAGEMENT, LLC |
$425,689 |
-17.9% |
+30.0% |
| 6 |
GARRET SHIELDS INFRASTRUCTURE |
$434,180 |
-16.3% |
+32.6% |
| 7 |
BLACKSMITH VENTURES LLC |
$443,365 |
-14.5% |
+35.4% |
| 8 |
ROAD DOCTORS LLC |
$444,300 |
-14.3% |
+35.7% |
| 9 |
RESTEK, INC. |
$593,415 |
+14.4% |
+81.3% |
| 10 |
MPB, INC. |
$603,865 |
+16.4% |
+84.5% |
| 11 |
SCR CIVIL CONSTRUCTION, LLC |
$692,470 |
+33.5% |
+111.5% |
| 12 |
PREMIER CONTRACTORS LLC |
$807,350 |
+55.6% |
+146.6% |
| 13 |
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC |
$1,170,745 |
+125.7% |
+257.6% |
Bid tab: unit prices 30 items
ExcelCSV
| Seq | Bid code | Description | Qty | Unit | Estimate |
#1 TAYLOR BRIDGE L… | #2 BK FIELD OPERAT… | #3 BECK-REIT & SON… | #4 ROY JORGENSEN A… | #5 ICOS MANAGEMENT… | #6 GARRET SHIELDS … | #7 BLACKSMITH VENT… | #8 ROAD DOCTORS LLC |
| 1 | 100-7004 |
PREP ROW (TREE REMOVE) (12"-24" DIA) | 6 | EA |
$1,000.00 |
$500.00 |
$300.00 |
$100.00 |
$1.00 |
$535.00 |
$1,000.00 |
$1,500.00 |
$1,500.00 |
| 2 | 100-7005 |
PREP ROW (TREE REMOVE) (24"-36" DIA) | 6 | EA |
$1,200.00 |
$750.00 |
$850.00 |
$150.00 |
$1.00 |
$1,070.00 |
$2,000.00 |
$2,500.00 |
$1,500.00 |
| 3 | 351-7003 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | 45 | SY |
$460.50 |
$200.00 |
$240.00 |
$350.00 |
$250.00 |
$856.00 |
$40.00 |
$350.00 |
$150.00 |
| 4 | 401-7001 |
FLOWABLE BACKFILL | 8 | CY |
$550.00 |
$1,000.00 |
$800.00 |
$950.00 |
$500.00 |
$856.00 |
$300.00 |
$400.00 |
$500.00 |
| 5 | 429-7005 |
CONC STR REPAIR(DECK REP (FULL DEPTH)) | 25 | SF |
$450.00 |
$400.00 |
$450.00 |
$650.00 |
$250.00 |
$642.00 |
$300.00 |
$350.00 |
$200.00 |
| 6 | 429-7007 |
CONC STR REPAIR (VERTICAL & OVERHEAD) | 193 | SF |
$240.00 |
$150.00 |
$120.00 |
$125.00 |
$100.00 |
$214.00 |
$200.00 |
$200.00 |
$150.00 |
| 7 | 432-7001 |
RIPRAP (CONC)(4 IN) | 3 | CY |
$460.00 |
$1,000.00 |
$1,000.00 |
$1,100.00 |
$700.00 |
$856.00 |
$600.00 |
$1,200.00 |
$300.00 |
| 8 | 432-7029 |
RIPRAP (STONE COMMON)(DRY)(6 IN) | 3 | CY |
$250.00 |
$1,000.00 |
$600.00 |
$1,300.00 |
$300.00 |
$428.00 |
$200.00 |
$800.00 |
$300.00 |
| 9 | 432-7043 |
RIPRAP (STONE PROTECTION)(18 IN) | 46 | CY |
$220.00 |
$300.00 |
$190.00 |
$160.00 |
$300.00 |
$214.00 |
$300.00 |
$220.00 |
$350.00 |
| 10 | 432-7045 |
RIPRAP (STONE PROTECTION)(24 IN) | 437 | CY |
$220.00 |
$190.00 |
$190.00 |
$160.00 |
$200.00 |
$193.00 |
$250.00 |
$220.00 |
$250.00 |
| 11 | 438-7001 |
CLEANING AND SEALING EXISTING JOINTS | 429 | LF |
$110.00 |
$50.00 |
$55.00 |
$65.00 |
$35.00 |
$64.00 |
$40.00 |
$45.00 |
$60.00 |
| 12 | 459-7001 |
GABIONS (GALV) | 40 | CY |
$500.00 |
$450.00 |
$500.00 |
$300.00 |
$500.00 |
$321.00 |
$300.00 |
$300.00 |
$250.00 |
| 13 | 459-7008 |
GABION MATTRESSES (GALV)(18 IN) | 80 | SY |
$185.00 |
$195.00 |
$350.00 |
$275.00 |
$250.00 |
$257.00 |
$300.00 |
$200.00 |
$250.00 |
| 14 | 467-7004 |
SET (REPLACE PIPE RUNNER) | 13 | EA |
$1,500.00 |
$1,000.00 |
$1,000.00 |
$1,300.00 |
$1,000.00 |
$1,605.00 |
$1,000.00 |
$1,200.00 |
$200.00 |
| 15 | 480-7002 |
CLEAN EXIST CULVERTS | 75 | CY |
$75.00 |
$250.00 |
$120.00 |
$85.00 |
$250.00 |
$214.00 |
$150.00 |
$100.00 |
$100.00 |
| 16 | 500-7001 |
MOBILIZATION | 1 | LS |
$60,000.00 |
$30,000.00 |
$40,000.00 |
$59,000.00 |
$65,000.00 |
$52,400.00 |
$60,000.00 |
$50,000.00 |
$50,000.00 |
| 17 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 | MO |
$5,500.00 |
$1.00 |
$1.00 |
$2,000.00 |
$1,500.00 |
$1.00 |
$5,000.00 |
$5,000.00 |
$3,500.00 |
| 18 | 503-7001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 200 | DAY |
$100.00 |
$1.00 |
$1.00 |
$1.00 |
$100.00 |
$1.00 |
$10.00 |
$1.00 |
$100.00 |
| 19 | 505-7001 |
TMA (STATIONARY) | 100 | DAY |
$100.00 |
$1.00 |
$1.00 |
$1.00 |
$250.00 |
$1.00 |
$300.00 |
$1.00 |
$1.00 |
| 20 | 505-7003 |
TMA (MOBILE OPERATION) | 100 | DAY |
$100.00 |
$1.00 |
$1.00 |
$1.00 |
$1.00 |
$1.00 |
$200.00 |
$1.00 |
$1.00 |
| 21 | 506-7035 |
SANDBAGS FOR EROSION CONTROL | 100 | EA |
$10.00 |
$10.00 |
$15.00 |
$1.00 |
$1.00 |
$11.00 |
$2.00 |
$5.00 |
$50.00 |
| 22 | 556-7001 |
PIPE UNDERDRAINS (TY 1) (6") | 10 | LF |
$150.00 |
$50.00 |
$250.00 |
$150.00 |
$45.00 |
$214.00 |
$50.00 |
$1,000.00 |
$36.00 |
| 23 | 700-7001 |
POTHOLE REPAIR(STANDARD)(0"-5" DEEP) | 15 | SY |
$320.00 |
$150.00 |
$200.00 |
$100.00 |
$100.00 |
$321.00 |
$100.00 |
$400.00 |
$120.00 |
| 24 | 734-7002 |
LITTER REMOVAL | 3 | CYC |
$300.00 |
$50.00 |
$1,200.00 |
$450.00 |
$100.00 |
$642.00 |
$1,000.00 |
$6,000.00 |
$2,500.00 |
| 25 | 735-7060 |
DRIFTWOOD REMOVAL | 40 | CY |
$200.00 |
$250.00 |
$120.00 |
$80.00 |
$80.00 |
$214.00 |
$120.00 |
$300.00 |
$300.00 |
| 26 | 770-7010 |
REALIGN POSTS | 2 | EA |
$100.00 |
$1,000.00 |
$500.00 |
$2,500.00 |
$200.00 |
$642.00 |
$10.00 |
$1,000.00 |
$500.00 |
| 27 | 776-7001 |
REPAIR (STEEL RAIL) | 25 | LF |
$330.00 |
$200.00 |
$350.00 |
$650.00 |
$80.00 |
$321.00 |
$100.00 |
$240.00 |
$350.00 |
| 28 | 780-7005 |
CNC CRACK REPAIR (FLOOD)(GRAVITY) | 100 | SF |
$15.00 |
$50.00 |
$100.00 |
$60.00 |
$100.00 |
$128.00 |
$10.00 |
$65.00 |
$100.00 |
| 29 | 785-7002 |
BRIDGE JOINT REPAIR (HEADER) | 5 | LF |
$634.00 |
$2,100.00 |
$800.00 |
$500.00 |
$300.00 |
$535.00 |
$500.00 |
$800.00 |
$200.00 |
| 30 | 788-7001 |
CONCRETE BEAM REPAIR | 5 | EA |
$9,000.00 |
$1,500.00 |
$3,000.00 |
$3,500.00 |
$4,000.00 |
$4,280.00 |
$1,000.00 |
$5,000.00 |
$10,000.00 |
Showing the first 8 bidders. The Excel and CSV downloads include all 13.