BRIDGE AND APPROACHES COUNTY ROAD (NS-299): OVER TRIBUTARY TO BAKER CREEK , 0.3 MILES NORTH OF SH -32 NEAR GRADY. PROJECT LENGTH = 0.202 MILE

Let date
Thursday, March 16, 2017
Contract
170124
J/P numbers
28449(04)
District
County
Jefferson
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (NS-299): OVER TRIBUTARY TO BAKER CREEK , 0.3 MILES NORTH OF SH -32 NEAR GRADY. PROJECT LENGTH = 0.202 MILE
Project number
STP-234D(042)CI

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$563,308
1 BRIDGECO CONTRACTORS, INC. Low bidder $572,789 +1.7%
2 K & R BUILDERS, INC. $599,211 +6.4% +4.6%
3 Frontier Bridge, Inc. $616,849 +9.5% +7.7%
4 Treas Construction Inc $617,699 +9.7% +7.8%
5 RRY SERVICES LLC $642,790 +14.1% +12.2%
6 HASKELL LEMON CONSTRUCTION CO. $789,477 +40.2% +37.8%

Bid tab: unit prices 39 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BRIDGECO CONTRA…#2 K & R BUILDERS,…#3 Frontier Bridge…#4 Treas Construct…#5 RRY SERVICES LLC#6 HASKELL LEMON C…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $7,000.00 $19,000.00 $29,050.00 $10,300.00 $7,107.00 $11,000.00 $15,440.00
2202(H) 0185 EARTHWORK1LSUM $15,000.00 $81,901.60 $76,507.00 $57,268.00 $85,310.26 $75,000.00 $153,860.00
3221(C) 2801 TEMPORARY SILT FENCE800LF $1.75 $1.75 $1.50 $1.26 $1.26 $1.22 $1.30
4221(F) 0100 TEMPORARY SILT DIKE400LF $10.00 $8.00 $8.00 $8.13 $8.12 $7.89 $8.35
5230(A) 2806 SOLID SLAB SODDING12,500SY $2.00 $1.70 $1.55 $1.43 $1.43 $1.50 $1.45
6233(A) 2817 VEGETATIVE MULCHING5.2AC $250.00 $300.00 $100.00 $103.00 $103.00 $100.00 $106.00
7303(A) 2100 AGGREGATE BASE TYPE A535CY $51.00 $47.00 $59.06 $52.16 $47.38 $60.00 $88.60
8408 5774 PRIME COAT4,300GAL $8.75 $9.45 $3.32 $9.27 $9.27 $5.60 $7.55
9509(D) 0325 CLASS C CONCRETE10CY $250.00 $41.00 $275.00 $458.19 $412.00 $300.00 $582.50
10601(A) 0297 TYPE I PLAIN RIPRAP900TON $40.00 $31.47 $42.97 $42.15 $42.23 $50.00 $45.60
11613(B) 0690 24" CORR. GALV. STEEL PIPE50LF $42.00 $31.47 $27.00 $37.77 $32.96 $45.00 $35.60
12613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND2EA $725.00 $350.00 $245.00 $5,298.09 $293.55 $400.00 $485.00
13619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $8,000.00 $3,500.00 $3,500.00 $9,270.00 $4,017.00 $2,500.00 $8,405.00
14624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)1,814LF $6.25 $6.50 $7.25 $6.77 $6.77 $5.35 $6.95
15624(H) 5920 (PL) GATE1EA $1,750.00 $1,500.00 $825.00 $772.50 $772.50 $1,750.00 $795.00
16501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON100CY $9.00 $14.00 $9.50 $15.75 $20.60 $25.00 $27.80
17501(F) 6352 GRANULAR BACKFILL56CY $72.25 $57.88 $67.00 $52.50 $90.86 $80.00 $104.50
18503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)254LF $220.00 $220.00 $239.00 $237.64 $216.34 $260.00 $246.50
19504(B) 1305 SAW-CUT GROOVING209SY $4.75 $11.97 $12.75 $11.97 $13.80 $11.40 $12.10
20504(D) 6239 CONCRETE RAIL (TR3)226.6LF $75.00 $75.00 $77.50 $77.48 $77.82 $100.00 $123.00
21506(A) 1322 STRUCTURAL STEEL320LB $4.00 $2.33 $3.00 $2.45 $2.43 $3.00 $11.20
22507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY6EA $975.00 $900.00 $400.00 $438.01 $740.93 $300.00 $705.50
23509(A) 1326 CLASS AA CONCRETE85.5CY $525.00 $525.00 $672.50 $645.83 $730.73 $650.00 $657.00
24509(B) 1328 CLASS A CONCRETE39.2CY $550.00 $550.00 $730.00 $692.74 $725.14 $700.00 $987.50
25511(A) 1332 REINFORCING STEEL21,470LB $1.00 $1.00 $0.9100 $0.9000 $1.03 $1.00 $1.75
26514(A) 6010 PILES, FURNISHED (HP 10X42)744LF $34.75 $24.73 $25.90 $28.33 $24.08 $40.00 $31.40
27514(B) 6292 PILES, DRIVEN (HP 10X42)744LF $18.25 $9.00 $11.10 $12.60 $14.42 $10.00 $19.30
28514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
29601(B) 1353 TYPE I-A PLAIN RIPRAP1,200TON $45.00 $36.77 $40.97 $40.87 $44.39 $50.00 $45.60
30601(C) 1355 TYPE I-A FILTER BLANKET400TON $30.00 $34.00 $31.82 $29.16 $34.50 $41.00 $36.80
31613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND52LF $28.00 $25.00 $30.00 $24.29 $30.90 $35.00 $67.20
32613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.50LF $24.75 $20.00 $30.00 $24.29 $30.90 $35.00 $34.00
33619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $18,000.00 $10,000.00 $8,500.00 $21,000.00 $12,875.00 $10,000.00 $10,492.54
34623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $1,800.00 $1,850.00 $1,650.00 $1,837.50 $1,545.00 $1,500.00 $1,610.00
35623(F) 6029 GUARDRAIL ANCHOR UNIT (TYPE A)4EA $1,585.00 $1,850.00 $1,430.00 $1,470.00 $1,339.00 $1,300.00 $1,447.00
36880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $5,000.00 $2,500.00 $2,750.00 $2,446.50 $2,008.50 $1,950.00 $2,469.00
37642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $5,000.00 $6,500.00 $6,000.00 $7,560.00 $5,974.00 $7,900.00 $7,630.00
38220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $7,000.00 $2,500.00 $2,750.00 $2,625.00 $2,575.00 $1,275.00 $3,078.00
39641 1399 MOBILIZATION1LSUM $50,634.00 $35,000.00 $42,900.00 $50,576.64 $40,884.09 $57,000.00 $55,263.42