| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$7,500.00 |
$7,500.00 |
$11,000.00 |
$10,580.00 |
$10,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$20,780.00 |
$32,750.00 |
$32,000.00 |
$40,000.00 |
$60,000.00 |
$35,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 300 | LF |
$2.50 |
$2.20 |
$1.98 |
$2.25 |
$1.75 |
$2.20 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$6.00 |
$13.20 |
$12.00 |
$11.00 |
$7.50 |
$13.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 7,734 | SY |
$1.50 |
$1.42 |
$1.28 |
$1.65 |
$1.40 |
$1.44 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 5.8 | AC |
$400.00 |
$100.00 |
$50.00 |
$400.00 |
$225.50 |
$55.00 |
| 7 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 784 | TON |
$80.00 |
$96.60 |
$75.00 |
$101.00 |
$99.40 |
$94.50 |
| 8 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 409 | TON |
$90.00 |
$99.82 |
$85.00 |
$104.00 |
$106.00 |
$99.50 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$295.00 |
$250.00 |
$250.00 |
$534.50 |
$400.00 |
| 10 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 372 | TON |
$40.00 |
$43.83 |
$50.00 |
$50.00 |
$50.80 |
$45.00 |
| 11 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 84 | LF |
$45.00 |
$48.70 |
$38.00 |
$36.50 |
$38.30 |
$40.00 |
| 12 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 34 | LF |
$40.00 |
$40.00 |
$38.00 |
$32.50 |
$65.30 |
$45.00 |
| 13 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$300.00 |
$220.00 |
$300.00 |
$345.00 |
$972.00 |
$200.00 |
| 14 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$400.00 |
$255.00 |
$300.00 |
$425.00 |
$1,037.00 |
$200.00 |
| 15 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$3,500.00 |
$4,000.00 |
$9,733.00 |
$5,000.00 |
| 16 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$20.00 |
$8.00 |
$25.00 |
$12.00 |
$27.60 |
$20.00 |
| 17 | 501(F) 6352 |
GRANULAR BACKFILL | 48 | CY |
$60.00 |
$64.00 |
$100.00 |
$80.00 |
$85.50 |
$75.00 |
| 18 | 504(B) 1305 |
SAW-CUT GROOVING | 245.7 | SY |
$5.00 |
$11.00 |
$9.80 |
$13.00 |
$10.30 |
$11.00 |
| 19 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 256.6 | LF |
$80.00 |
$73.50 |
$75.00 |
$115.00 |
$107.50 |
$75.00 |
| 20 | 506(A) 1322 |
STRUCTURAL STEEL | 87,900 | LB |
$4.00 |
$1.78 |
$1.80 |
$1.87 |
$1.65 |
$3.50 |
| 21 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,000.00 |
$500.00 |
$350.00 |
$410.00 |
$862.50 |
$210.00 |
| 22 | 509(A) 1326 |
CLASS AA CONCRETE | 93.2 | CY |
$600.00 |
$660.00 |
$625.00 |
$795.00 |
$520.00 |
$700.00 |
| 23 | 509(B) 1328 |
CLASS A CONCRETE | 39.2 | CY |
$650.00 |
$695.00 |
$625.00 |
$715.00 |
$742.50 |
$750.00 |
| 24 | 511(A) 1332 |
REINFORCING STEEL | 24,320 | LB |
$1.00 |
$0.8700 |
$0.9300 |
$0.8600 |
$1.15 |
$0.8000 |
| 25 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,254 | LF |
$30.00 |
$22.40 |
$40.00 |
$40.50 |
$32.30 |
$25.00 |
| 26 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,254 | LF |
$15.00 |
$9.60 |
$10.00 |
$18.20 |
$21.90 |
$15.00 |
| 27 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 28 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,587 | TON |
$40.00 |
$37.21 |
$50.00 |
$53.00 |
$47.60 |
$40.00 |
| 29 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 423 | TON |
$30.00 |
$30.22 |
$40.00 |
$42.00 |
$37.50 |
$35.00 |
| 30 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$30.00 |
$29.00 |
$30.00 |
$20.00 |
$46.50 |
$25.00 |
| 31 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$30.00 |
$29.00 |
$30.00 |
$20.00 |
$19.90 |
$25.00 |
| 32 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$13,750.00 |
$10,000.00 |
$16,000.00 |
$19,365.00 |
$20,000.00 |
| 33 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,530.00 |
$1,560.00 |
$1,675.00 |
$1,638.00 |
$1,750.00 |
| 34 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,300.00 |
$1,600.00 |
$1,200.00 |
$1,750.00 |
$1,260.00 |
$1,900.00 |
| 35 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$2,000.00 |
$2,425.00 |
$4,147.00 |
$2,200.00 |
| 36 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$16,560.00 |
$7,000.00 |
$6,034.00 |
$7,500.00 |
$6,719.00 |
$6,100.00 |
| 37 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$1,250.00 |
$7,500.00 |
$2,749.00 |
$4,000.00 |
| 38 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$67,220.00 |
$29,500.00 |
$61,000.00 |
$23,000.00 |
$70,630.37 |
$70,000.00 |