| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$14,000.00 |
$5,000.00 |
$15,000.00 |
$12,638.26 |
$13,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 740 | CY |
$10.00 |
$5.00 |
$12.50 |
$9.98 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,110 | CY |
$13.00 |
$6.00 |
$12.00 |
$13.30 |
$20.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$2,000.00 |
$6,000.00 |
$11,307.92 |
$6,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 570 | LF |
$2.50 |
$3.00 |
$2.20 |
$2.00 |
$1.99 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 140 | LF |
$8.00 |
$7.00 |
$14.00 |
$7.98 |
$12.95 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 6,450 | SY |
$2.00 |
$2.50 |
$2.20 |
$2.66 |
$1.95 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.32 | AC |
$750.00 |
$400.00 |
$650.00 |
$665.17 |
$995.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 715 | TON |
$32.00 |
$35.00 |
$33.54 |
$31.93 |
$40.00 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$300.00 |
$300.00 |
$465.62 |
$200.00 |
| 11 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 45 | LF |
$60.00 |
$35.00 |
$110.00 |
$43.85 |
$75.00 |
| 12 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 30 | LF |
$40.00 |
$30.00 |
$28.00 |
$30.07 |
$45.00 |
| 13 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 115 | LF |
$55.00 |
$45.00 |
$32.00 |
$74.90 |
$45.00 |
| 14 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$500.00 |
$900.00 |
$750.00 |
$465.62 |
$800.00 |
| 15 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 45 | LF |
$15.00 |
$1,500.00 |
$20.00 |
$15.96 |
$12.00 |
| 16 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,000.00 |
$6,000.00 |
$4,000.00 |
$2,993.27 |
$2,250.00 |
| 17 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 60 | CY |
$20.00 |
$12.00 |
$25.00 |
$19.96 |
$15.00 |
| 18 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 40 | CY |
$25.00 |
$15.00 |
$37.00 |
$25.28 |
$35.00 |
| 19 | 503(B) 6144 |
PRESTRESSED CONCRETE DOUBLE TEE | 272.5 | LF |
$225.00 |
$240.00 |
$247.00 |
$327.40 |
$350.00 |
| 20 | 504(E) 1380 |
CONCRETE RAIL (TR1) | 155 | LF |
$80.00 |
$95.00 |
$100.00 |
$79.82 |
$110.00 |
| 21 | 509(A) 1326 |
CLASS AA CONCRETE | 37.6 | CY |
$800.00 |
$750.00 |
$825.00 |
$731.69 |
$950.00 |
| 22 | 509(B) 1328 |
CLASS A CONCRETE | 28.2 | CY |
$750.00 |
$800.00 |
$775.00 |
$625.26 |
$950.00 |
| 23 | 511(A) 1332 |
REINFORCING STEEL | 11,050 | LB |
$1.25 |
$1.00 |
$1.02 |
$1.10 |
$1.00 |
| 24 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 110 | LF |
$45.00 |
$50.00 |
$84.00 |
$50.42 |
$60.00 |
| 25 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 110 | LF |
$15.00 |
$20.00 |
$36.00 |
$17.29 |
$15.00 |
| 26 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 27 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 345 | TON |
$45.00 |
$45.00 |
$46.88 |
$37.91 |
$56.00 |
| 28 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 70 | TON |
$45.00 |
$40.00 |
$39.77 |
$27.94 |
$57.00 |
| 29 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$5,000.00 |
$5,900.00 |
$20,620.32 |
$14,000.00 |
| 30 | 623(F) 6034 |
GUARDRAIL ANCHOR UNIT (TYPE III) | 4 | EA |
$2,000.00 |
$2,200.00 |
$2,400.00 |
$2,660.69 |
$2,000.00 |
| 31 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$2,500.00 |
$7,500.00 |
$10,642.75 |
$7,781.00 |
| 32 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$1,500.00 |
$4,000.00 |
$17,627.05 |
$1,200.00 |
| 33 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$35,000.00 |
$10,000.00 |
$46,000.00 |
$33,258.58 |
$38,000.00 |