Bid tab 160155

Let Mar 17, 2016 · Division 7 · Stephens Sign up free

‹ Mar 2016 results

BRIDGE AND APPROACHES COUNTY ROAD (NS-279/DEWITT ROAD ): OVER LITTLE BEAVER CREEK , 0.7 MILES SOUTH OF THE GRADY COUNTY LINE NEAR MARLOW . PROJECT LENGTH = 0.264 MILE

Let date
Thursday, March 17, 2016
Contract
160155
J/P numbers
28366(04)
District
Division 7
County
Stephens
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (NS-279/DEWITT ROAD ): OVER LITTLE BEAVER CREEK , 0.7 MILES SOUTH OF THE GRADY COUNTY LINE NEAR MARLOW . PROJECT LENGTH = 0.264 MILE
Project number
STP-NBIL(192)CI

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$923,462
1 FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Low bidder $937,479 +1.5%
2 K & R BUILDERS, INC. $977,654 +5.9% +4.3%
3 Cimarron Construction Company, LLC $1,107,596 +19.9% +18.1%
4 EARTH BUILDERS, L.P. $1,123,975 +21.7% +19.9%
5 RRY SERVICES LLC $1,153,937 +25.0% +23.1%
6 OBC, INC. $1,261,174 +36.6% +34.5%
7 M.J. HUGHES CONSTRUCTION, INC. $1,322,951 +43.3% +41.1%

Bid tab: unit prices 47 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 FRONTIER BRIDGE…#2 K & R BUILDERS,…#3 Cimarron Constr…#4 EARTH BUILDERS,…#5 RRY SERVICES LLC#6 OBC, INC.#7 M.J. HUGHES CON…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $10,000.00 $11,738.91 $11,750.00 $13,000.00 $25,000.00 $14,000.00 $75,000.00 $15,000.00
2202(H) 0185 EARTHWORK1LSUM $34,500.00 $46,886.63 $48,275.00 $52,000.00 $65,000.00 $72,000.00 $40,000.00 $125,000.00
3221(C) 2801 TEMPORARY SILT FENCE1,800LF $2.50 $1.30 $1.39 $3.00 $1.40 $1.26 $0.7000 $2.00
4221(D) 2803 TEMPORARY SEDIMENT FILTER2EA $250.00 $175.10 $187.00 $450.00 $350.00 $170.00 $532.50 $700.00
5221(F) 0100 TEMPORARY SILT DIKE150LF $8.00 $6.70 $7.15 $15.00 $10.00 $6.50 $18.61 $12.00
6221(G) 0151 TEMPORARY ROCK FILTER DAM TYPE 220CY $75.00 $66.95 $104.50 $160.00 $70.00 $75.00 $53.25 $53.00
7230(A) 2806 SOLID SLAB SODDING15,334SY $2.00 $1.32 $1.41 $2.40 $1.60 $1.28 $1.34 $1.50
8233(A) 2817 VEGETATIVE MULCHING6.34AC $450.00 $283.25 $200.00 $500.00 $180.00 $275.00 $159.75 $175.06
9411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)750TON $88.00 $128.75 $137.50 $145.00 $130.00 $125.00 $172.00 $146.00
10411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)370TON $125.00 $154.50 $165.00 $170.00 $150.00 $150.00 $185.00 $175.00
11509(D) 0325 CLASS C CONCRETE10CY $300.00 $345.78 $300.00 $350.00 $500.00 $350.00 $333.74 $350.00
12601(A) 0297 TYPE I PLAIN RIPRAP48TON $45.00 $39.37 $51.00 $60.00 $65.00 $50.00 $28.63 $44.00
13613(A) 4497 36" X 22" R.C.PIPE ARCH CLASS A-III42LF $130.00 $127.08 $140.00 $175.00 $180.00 $200.00 $25.36 $154.00
14613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH90LF $40.00 $26.83 $23.00 $32.00 $65.00 $40.00 $13.42 $37.00
15613(L) 4504 21" X 15" PREFAB. CULVERT END SECTION, ARCH6EA $300.00 $292.69 $220.00 $350.00 $1,500.00 $300.00 $102.95 $332.00
16613(L) 4526 36" X 22" PREFAB. CULVERT END SECTION, ARCH2EA $1,500.00 $1,446.74 $1,700.00 $2,000.00 $2,500.00 $1,700.00 $798.75 $1,775.00
17624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)1,634LF $6.00 $9.17 $6.71 $10.50 $10.00 $6.10 $3.65 $10.75
18624(H) 5920 (PL) GATE1EA $500.00 $824.00 $525.00 $1,000.00 $850.00 $475.00 $191.70 $1,000.00
19501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON190CY $20.00 $18.54 $9.50 $20.00 $20.00 $25.00 $25.00 $11.41
20501(F) 6352 GRANULAR BACKFILL76CY $60.00 $83.10 $65.00 $80.00 $70.00 $85.00 $60.00 $70.00
21503(A) 1311 PRESTRESSED CONCRETE BEAMS (TYPE II)298LF $195.00 $187.11 $169.00 $208.00 $200.00 $210.00 $200.00 $205.00
22503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)254LF $215.00 $216.22 $217.00 $231.00 $230.00 $245.00 $250.00 $225.00
23504(B) 1305 SAW-CUT GROOVING468.1SY $5.00 $6.59 $7.04 $10.00 $8.00 $6.40 $6.82 $7.75
24504(C) 6250 SEALED EXPANSION JOINT33.06LF $300.00 $281.79 $265.00 $310.00 $200.00 $300.00 $300.00 $100.00
25504(D) 6239 CONCRETE RAIL (TR3)447.5LF $80.00 $74.13 $75.50 $115.00 $100.00 $90.00 $100.00 $100.00
26506(A) 1322 STRUCTURAL STEEL1,220LB $3.00 $2.38 $3.00 $3.00 $3.00 $3.00 $4.00 $2.00
27507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY6EA $1,100.00 $1,229.00 $950.00 $1,250.00 $1,000.00 $1,200.00 $716.85 $1,000.00
28507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY12EA $1,200.00 $1,210.84 $960.00 $1,275.00 $1,000.00 $1,200.00 $862.50 $1,000.00
29509(A) 1326 CLASS AA CONCRETE150.2CY $550.00 $516.53 $650.00 $690.00 $500.00 $700.00 $1,000.00 $1,050.00
30509(B) 1328 CLASS A CONCRETE155.3CY $550.00 $553.95 $697.50 $650.00 $500.00 $725.00 $920.00 $1,050.00
31511(A) 1332 REINFORCING STEEL64,483LB $1.00 $0.8600 $0.7900 $0.9500 $1.00 $1.00 $1.50 $1.00
32514(A) 6010 PILES, FURNISHED (HP 10X42)108LF $30.00 $30.71 $32.20 $49.00 $30.00 $45.00 $40.00 $25.00
33514(A) 6011 PILES, FURNISHED (HP 12X53)243LF $30.00 $37.47 $39.20 $57.00 $35.00 $55.00 $47.28 $32.00
34514(B) 6292 PILES, DRIVEN (HP 10X42)108LF $15.00 $14.42 $13.80 $23.00 $35.00 $11.00 $30.64 $60.00
35514(B) 6294 PILES, DRIVEN (HP 12X53)243LF $15.00 $14.42 $16.80 $26.00 $35.00 $11.00 $30.65 $17.00
36514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
37516(A) 6094 DRILLED SHAFTS 48" DIAMETER84LF $550.00 $767.21 $721.00 $960.00 $750.00 $1,075.00 $800.00 $1,000.00
38601(B) 1353 TYPE I-A PLAIN RIPRAP2,100TON $40.00 $36.28 $40.50 $48.00 $60.00 $52.00 $41.34 $46.00
39601(C) 1355 TYPE I-A FILTER BLANKET610TON $30.00 $26.45 $32.50 $40.00 $45.00 $45.00 $14.19 $36.00
40613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND62LF $25.00 $20.78 $30.00 $20.00 $20.00 $35.00 $22.22 $8.00
41613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.70LF $25.00 $20.49 $30.00 $20.00 $20.00 $35.00 $17.16 $8.00
42623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $1,500.00 $1,390.50 $1,485.00 $1,600.00 $2,500.00 $1,235.00 $1,661.40 $1,875.00
43623(F) 6029 GUARDRAIL ANCHOR UNIT (TYPE A)4EA $1,500.00 $1,606.80 $1,716.00 $1,800.00 $1,200.00 $1,585.00 $1,437.75 $1,625.00
44880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $5,000.00 $2,719.20 $3,600.00 $4,200.00 $4,000.00 $3,200.00 $5,000.00 $3,000.00
45642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $15,460.00 $10,098.00 $9,000.00 $9,000.00 $10,000.00 $9,820.00 $15,735.38 $15,000.00
46220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $3,280.00 $2,800.00 $7,500.00 $3,000.00 $1,000.00 $677.69 $2,000.00
47641 1399 MOBILIZATION1LSUM $64,405.00 $49,072.57 $42,500.00 $18,000.00 $100,000.00 $82,650.00 $80,000.00 $95,000.00