| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,000 | CY |
$8.00 |
$9.00 |
$4.16 |
$10.00 |
$0.5000 |
$0.0100 |
| 2 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$14,000.00 |
$19,760.00 |
$7,600.00 |
$20,350.00 |
$20,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,800 | LF |
$2.00 |
$1.34 |
$3.12 |
$2.00 |
$1.42 |
$1.26 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 500 | LF |
$9.00 |
$7.30 |
$7.54 |
$10.75 |
$7.50 |
$6.85 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 8,000 | SY |
$3.00 |
$1.54 |
$1.58 |
$1.66 |
$1.68 |
$1.45 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,120 | CY |
$52.00 |
$35.00 |
$40.01 |
$40.00 |
$54.50 |
$50.00 |
| 7 | 307(D) 4230 |
LIME | 300 | TON |
$170.00 |
$171.04 |
$166.40 |
$170.00 |
$197.45 |
$180.00 |
| 8 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 13,741 | SY |
$3.50 |
$3.20 |
$3.12 |
$5.07 |
$5.25 |
$5.00 |
| 9 | 317 4270 |
CEMENT TREATED BASE | 11,341 | SY |
$15.00 |
$14.18 |
$13.52 |
$15.00 |
$20.00 |
$20.00 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 25,082 | SY |
$1.30 |
$1.68 |
$1.86 |
$3.80 |
$1.65 |
$4.00 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,316 | TON |
$30.00 |
$21.00 |
$20.01 |
$12.97 |
$27.00 |
$26.00 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 550 | TON |
$120.00 |
$130.53 |
$80.70 |
$90.00 |
$112.50 |
$100.00 |
| 13 | 412 5267 |
COLD MILLING PAVEMENT | 2,000 | SY |
$13.00 |
$4.26 |
$13.52 |
$10.00 |
$12.00 |
$10.00 |
| 14 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 2,965 | SY |
$15.00 |
$13.00 |
$21.90 |
$23.00 |
$27.50 |
$25.00 |
| 15 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 7,310 | SY |
$20.00 |
$15.00 |
$26.35 |
$46.00 |
$27.00 |
$24.00 |
| 16 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 3,140 | CY |
$125.00 |
$116.00 |
$164.19 |
$145.00 |
$170.00 |
$161.00 |
| 17 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 10,319 | SY |
$7.00 |
$7.10 |
$7.28 |
$4.00 |
$12.50 |
$12.00 |
| 18 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,750 | LF |
$3.00 |
$3.89 |
$4.16 |
$5.85 |
$4.00 |
$5.25 |
| 19 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,470 | LF |
$17.00 |
$16.29 |
$15.91 |
$19.00 |
$18.57 |
$17.00 |
| 20 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,200.00 |
$2,156.63 |
$2,106.00 |
$2,700.00 |
$2,559.00 |
$2,350.00 |
| 21 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,900.00 |
$1,485.68 |
$1,450.80 |
$2,550.00 |
$2,418.00 |
$2,240.00 |
| 22 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$20.00 |
$21.72 |
$20.16 |
$14.00 |
$13.00 |
$70.00 |
| 23 | 501(G) 6309 |
CLSM BACKFILL | 90 | CY |
$130.00 |
$152.69 |
$167.10 |
$140.00 |
$172.50 |
$300.00 |
| 24 | 504(A) 1304 |
APPROACH SLAB | 273.4 | SY |
$200.00 |
$192.25 |
$218.45 |
$210.00 |
$268.50 |
$340.00 |
| 25 | 504(B) 1305 |
SAW-CUT GROOVING | 682 | SY |
$4.20 |
$4.47 |
$4.70 |
$4.81 |
$4.62 |
$4.20 |
| 26 | 504(C) 6250 |
SEALED EXPANSION JOINT | 81 | LF |
$300.00 |
$222.33 |
$350.71 |
$230.00 |
$295.00 |
$500.00 |
| 27 | 504(E) 6190 |
42" F-SHAPED PARAPET | 323 | LF |
$100.00 |
$104.29 |
$105.60 |
$125.00 |
$111.50 |
$190.00 |
| 28 | 506(A) 1322 |
STRUCTURAL STEEL | 76,510 | LB |
$2.00 |
$1.80 |
$2.04 |
$2.50 |
$2.20 |
$4.25 |
| 29 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 15 | EA |
$1,100.00 |
$668.98 |
$1,223.10 |
$1,000.00 |
$1,300.00 |
$1,500.00 |
| 30 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 15 | EA |
$1,100.00 |
$668.98 |
$1,167.10 |
$1,000.00 |
$1,300.00 |
$1,500.00 |
| 31 | 509(A) 1326 |
CLASS AA CONCRETE | 110.2 | CY |
$650.00 |
$712.55 |
$791.64 |
$1,100.00 |
$937.50 |
$800.00 |
| 32 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$1,001.49 |
$544.07 |
$400.00 |
$595.00 |
$800.00 |
| 33 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 23,960 | LB |
$1.20 |
$1.12 |
$1.38 |
$0.9500 |
$1.05 |
$2.00 |
| 34 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 290 | SY |
$4.50 |
$3.89 |
$4.09 |
$4.00 |
$4.00 |
$3.65 |
| 35 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 40 | LF |
$50.00 |
$31.20 |
$32.82 |
$25.00 |
$44.00 |
$29.30 |
| 36 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 4 | GAL |
$120.00 |
$106.50 |
$112.00 |
$60.00 |
$55.00 |
$100.00 |
| 37 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$650.00 |
$724.20 |
$761.60 |
$1,500.00 |
$1,171.50 |
$680.00 |
| 38 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$50.00 |
$51.39 |
$54.04 |
$46.00 |
$56.10 |
$48.25 |
| 39 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$60,000.00 |
$32,348.88 |
$56,000.00 |
$150,000.00 |
$102,500.00 |
$120,000.00 |
| 40 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$20.00 |
$21.72 |
$20.16 |
$14.00 |
$13.00 |
$70.00 |
| 41 | 501(G) 6309 |
CLSM BACKFILL | 92 | CY |
$130.00 |
$152.68 |
$167.10 |
$140.00 |
$172.50 |
$300.00 |
| 42 | 504(A) 1304 |
APPROACH SLAB | 273.4 | SY |
$200.00 |
$192.25 |
$218.45 |
$210.00 |
$268.50 |
$340.00 |
| 43 | 504(B) 1305 |
SAW-CUT GROOVING | 682 | SY |
$4.20 |
$4.47 |
$4.70 |
$4.81 |
$4.62 |
$4.20 |
| 44 | 504(C) 6250 |
SEALED EXPANSION JOINT | 81 | LF |
$300.00 |
$222.33 |
$350.71 |
$230.00 |
$295.00 |
$500.00 |
| 45 | 504(E) 6190 |
42" F-SHAPED PARAPET | 323 | LF |
$100.00 |
$104.44 |
$105.60 |
$125.00 |
$111.50 |
$190.00 |
| 46 | 506(A) 1322 |
STRUCTURAL STEEL | 76,510 | LB |
$2.00 |
$1.77 |
$2.10 |
$2.50 |
$2.20 |
$4.25 |
| 47 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 15 | EA |
$1,100.00 |
$668.98 |
$1,223.10 |
$1,000.00 |
$1,300.00 |
$1,500.00 |
| 48 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 15 | EA |
$1,100.00 |
$668.98 |
$1,223.10 |
$1,000.00 |
$1,300.00 |
$1,500.00 |
| 49 | 509(A) 1326 |
CLASS AA CONCRETE | 109.2 | CY |
$650.00 |
$716.77 |
$800.15 |
$1,100.00 |
$937.50 |
$800.00 |
| 50 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$1,001.49 |
$544.07 |
$400.00 |
$595.00 |
$800.00 |
| 51 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 23,960 | LB |
$1.20 |
$1.12 |
$1.27 |
$0.9500 |
$1.05 |
$2.00 |
| 52 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 290 | SY |
$4.50 |
$3.89 |
$4.09 |
$4.00 |
$4.00 |
$3.65 |
| 53 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 40 | LF |
$50.00 |
$31.20 |
$32.82 |
$25.00 |
$44.00 |
$29.30 |
| 54 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 4 | GAL |
$120.00 |
$106.50 |
$112.00 |
$60.00 |
$55.00 |
$100.00 |
| 55 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$650.00 |
$724.20 |
$761.60 |
$1,500.00 |
$1,171.50 |
$680.00 |
| 56 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$50.00 |
$51.39 |
$54.04 |
$46.00 |
$56.10 |
$48.25 |
| 57 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$60,000.00 |
$32,348.88 |
$56,683.20 |
$150,000.00 |
$102,500.00 |
$120,000.00 |
| 58 | 413(C) 4868 |
RUMBLE STRIP-METHOD PCC-CON | 4,800 | LF |
$0.3500 |
$0.5300 |
$0.5200 |
$0.6000 |
$0.5500 |
$0.5000 |
| 59 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 650 | LF |
$9.00 |
$1.30 |
$9.73 |
$11.00 |
$10.00 |
$10.00 |
| 60 | 628 5180 |
INSTALLATION OF CABLE BARRIER SYSTEM | 650 | LF |
$12.00 |
$3.21 |
$5.15 |
$6.00 |
$5.40 |
$5.00 |
| 61 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$250.00 |
$532.50 |
$515.00 |
$600.00 |
$540.00 |
$500.00 |
| 62 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 98.52 | SF |
$25.00 |
$12.78 |
$12.36 |
$14.00 |
$13.00 |
$12.00 |
| 63 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 68 | LF |
$25.00 |
$12.78 |
$12.36 |
$14.00 |
$13.10 |
$12.00 |
| 64 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 9,040 | LF |
$0.5000 |
$0.9400 |
$0.9100 |
$1.00 |
$1.00 |
$0.8800 |
| 65 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 1,224 | LF |
$1.00 |
$0.9600 |
$0.9300 |
$1.00 |
$0.8900 |
$0.9000 |
| 66 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 160 | LF |
$3.00 |
$1.92 |
$1.85 |
$2.00 |
$2.00 |
$1.80 |
| 67 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 30 | LF |
$8.00 |
$8.52 |
$8.24 |
$9.00 |
$8.75 |
$8.00 |
| 68 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 48,570 | LF |
$0.7500 |
$1.01 |
$0.9800 |
$1.00 |
$1.04 |
$0.9500 |
| 69 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 3,090 | LF |
$1.00 |
$1.70 |
$1.65 |
$2.00 |
$1.72 |
$1.60 |
| 70 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 900 | SD |
$10.00 |
$15.98 |
$15.45 |
$17.00 |
$16.50 |
$15.00 |
| 71 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 11,610 | LF |
$20.00 |
$21.15 |
$28.84 |
$40.00 |
$40.00 |
$25.00 |
| 72 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 11,610 | LF |
$4.00 |
$1.76 |
$1.03 |
$5.00 |
$11.00 |
$4.00 |
| 73 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 33,600 | SD |
$0.2000 |
$0.4800 |
$0.4600 |
$0.5000 |
$0.5000 |
$0.4500 |
| 74 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 600 | SD |
$5.00 |
$7.46 |
$7.21 |
$8.00 |
$5.00 |
$7.00 |
| 75 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 37,950 | SD |
$0.3000 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.0500 |
$0.1000 |
| 76 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 36,600 | SD |
$0.7000 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.0600 |
$0.1000 |
| 77 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 11,100 | SD |
$1.50 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.0400 |
$0.1000 |
| 78 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 11,250 | SD |
$1.00 |
$3.20 |
$3.09 |
$3.50 |
$3.10 |
$3.00 |
| 79 | 880(C) 8848 |
WING BARRICADES | 1,200 | SD |
$1.00 |
$0.1600 |
$0.1600 |
$0.1700 |
$0.2000 |
$0.1500 |
| 80 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 26,100 | SD |
$0.2000 |
$0.3700 |
$0.3600 |
$0.5000 |
$0.4000 |
$0.3500 |
| 81 | 880(F) 8878 |
DRUMS | 29,100 | SD |
$0.2000 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.0800 |
$0.1000 |
| 82 | 880(G) 8900 |
TUBE CHANNELIZERS | 48 | EA |
$45.00 |
$44.73 |
$43.26 |
$50.00 |
$45.00 |
$42.00 |
| 83 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 740 | SD |
$20.00 |
$14.91 |
$14.42 |
$16.50 |
$15.00 |
$14.00 |
| 84 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$42,946.87 |
$17,160.00 |
$17,000.00 |
$16,500.00 |
$14,300.00 |
| 85 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$677.69 |
$3,300.00 |
$2,000.00 |
$8,000.00 |
$7,000.00 |
| 86 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$145,000.00 |
$492,420.83 |
$189,479.21 |
$225,000.00 |
$203,900.00 |
$390,000.00 |