| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,727.06 | CY |
$9.00 |
$10.00 |
$8.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 6,626.73 | CY |
$10.00 |
$4.00 |
$9.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 250 | LF |
$1.75 |
$2.25 |
$2.25 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 560 | LF |
$7.30 |
$9.89 |
$9.89 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 13,612 | SY |
$1.50 |
$2.98 |
$2.98 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.81 | AC |
$360.00 |
$150.00 |
$150.00 |
| 7 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 51,129.78 | SY |
$4.25 |
$4.75 |
$6.35 |
| 8 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 16,350 | LF |
$5.20 |
$12.50 |
$7.45 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 102 | TON |
$48.00 |
$50.00 |
$55.00 |
| 10 | 407(B) 0250 |
TACK COAT | 2,200.93 | GAL |
$2.80 |
$2.45 |
$3.00 |
| 11 | 408 5774 |
PRIME COAT | 17,895.62 | GAL |
$3.70 |
$3.00 |
$3.00 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 9,860.23 | TON |
$80.00 |
$75.00 |
$81.00 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,978.17 | TON |
$93.00 |
$82.00 |
$90.00 |
| 14 | 509(A) 1326 |
CLASS AA CONCRETE | 18.84 | CY |
$685.00 |
$1,775.00 |
$778.00 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$355.00 |
$550.00 |
$375.00 |
| 16 | 511(A) 0332 |
REINFORCING STEEL | 1,372.11 | LB |
$1.40 |
$1.50 |
$1.95 |
| 17 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 168 | LF |
$120.00 |
$125.00 |
$169.08 |
| 18 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 112 | LF |
$142.00 |
$150.00 |
$178.58 |
| 19 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 40 | LF |
$39.00 |
$50.00 |
$127.72 |
| 20 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 12 | EA |
$980.00 |
$1,500.00 |
$1,150.00 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$7,500.00 |
$10,000.00 |
| 22 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$155.00 |
$200.00 |
$150.00 |
| 23 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 36.26 | SF |
$42.00 |
$72.00 |
$72.00 |
| 24 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 4,267 | LF |
$1.70 |
$1.85 |
$1.85 |
| 25 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$20,500.00 |
$13,150.00 |
$16,750.00 |
| 26 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$9,000.00 |
$15,015.00 |
$6,100.00 |
| 27 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,850.00 |
$5,000.00 |
$10,000.00 |
| 28 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$110,000.00 |
$85,500.00 |
$150,000.00 |