| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$40,000.00 |
$30,000.00 |
$25,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 19,129.07 | CY |
$7.50 |
$4.25 |
$8.00 |
$7.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 12,175.49 | CY |
$9.02 |
$9.65 |
$13.00 |
$12.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,000 | LF |
$2.00 |
$1.22 |
$2.00 |
$1.65 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 560 | LF |
$8.70 |
$7.89 |
$8.00 |
$7.15 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 43,992 | SY |
$1.50 |
$1.12 |
$1.50 |
$1.45 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 9.09 | AC |
$275.00 |
$200.00 |
$225.00 |
$395.00 |
| 8 | 307(B) 4210 |
CEMENT KILN DUST | 1,785.03 | TON |
$58.00 |
$46.00 |
$85.00 |
$85.00 |
| 9 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 44,074.32 | SY |
$2.80 |
$4.25 |
$3.00 |
$2.80 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,925.02 | TON |
$54.33 |
$49.85 |
$65.00 |
$54.50 |
| 11 | 407(B) 0250 |
TACK COAT | 2,024.38 | GAL |
$3.33 |
$2.60 |
$2.00 |
$3.95 |
| 12 | 408 5774 |
PRIME COAT | 14,170.87 | GAL |
$4.00 |
$3.50 |
$3.00 |
$8.15 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 9,128.31 | TON |
$85.00 |
$96.00 |
$89.00 |
$103.25 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,628.31 | TON |
$90.00 |
$103.00 |
$99.00 |
$108.00 |
| 15 | 501(G) 6309 |
CLSM BACKFILL | 14 | CY |
$225.00 |
$300.00 |
$250.00 |
$225.00 |
| 16 | 509(B) 0321 |
CLASS A CONCRETE | 26.57 | CY |
$785.00 |
$1,100.00 |
$880.00 |
$800.00 |
| 17 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 4.47 | CY |
$928.00 |
$1,200.00 |
$1,320.00 |
$1,260.00 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 551.82 | CY |
$340.00 |
$350.00 |
$375.00 |
$340.00 |
| 19 | 511(A) 0332 |
REINFORCING STEEL | 2,797.3 | LB |
$1.20 |
$1.00 |
$1.30 |
$1.20 |
| 20 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 8 | TON |
$109.00 |
$100.00 |
$150.00 |
$109.00 |
| 21 | 601(H) 1390 |
TYPE IV GROUTED RIPRAP | 308.22 | SY |
$98.00 |
$75.00 |
$120.00 |
$98.00 |
| 22 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$2,600.00 |
$2,977.75 |
$2,700.00 |
$2,600.00 |
| 23 | 611(L) 0487 |
JUNCTION BOXES | 85.76 | CF |
$85.00 |
$139.46 |
$120.00 |
$110.00 |
| 24 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 109 | LF |
$90.00 |
$68.65 |
$132.00 |
$120.00 |
| 25 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 144 | LF |
$175.00 |
$154.30 |
$250.00 |
$225.00 |
| 26 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 384 | LF |
$130.00 |
$110.25 |
$143.00 |
$130.00 |
| 27 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 302 | LF |
$21.50 |
$23.50 |
$27.50 |
$25.00 |
| 28 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$200.00 |
$160.00 |
$330.00 |
$300.00 |
| 29 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 15 | EA |
$900.00 |
$1,087.50 |
$440.00 |
$400.00 |
| 30 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,500.00 |
$2,250.00 |
$2,200.00 |
$2,000.00 |
| 31 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 10 | EA |
$950.00 |
$1,200.00 |
$1,100.00 |
$1,000.00 |
| 32 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 3 | EA |
$1,600.00 |
$1,400.00 |
$1,760.00 |
$1,600.00 |
| 33 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$35,000.00 |
$37,500.00 |
$40,000.00 |
$45,000.00 |
| 34 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 120 | SY |
$18.00 |
$20.00 |
$30.00 |
$18.00 |
| 35 | 619(C) 0924 |
SAWING PAVEMENT | 22 | LF |
$9.75 |
$5.00 |
$3.00 |
$22.75 |
| 36 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 200 | LF |
$22.00 |
$18.00 |
$15.00 |
$18.00 |
| 37 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 10 | EA |
$1,900.00 |
$1,588.00 |
$1,220.00 |
$1,600.00 |
| 38 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 58.9 | SF |
$36.00 |
$59.00 |
$35.00 |
$59.00 |
| 39 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 32,280.24 | LF |
$0.5000 |
$0.3700 |
$0.8000 |
$0.3700 |
| 40 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$11,200.00 |
$24,650.00 |
$25,000.00 |
$28,000.00 |
| 41 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$32,000.00 |
$53,000.00 |
$50,000.00 |
$81,000.00 |
| 42 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,800.00 |
$12,500.00 |
$32,500.00 |
$14,000.00 |
| 43 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$130,000.00 |
$167,000.00 |
$175,000.00 |
$190,000.00 |