| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 40 | CY |
$23.74 |
$43.00 |
$132.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 532.3 | CY |
$18.33 |
$60.00 |
$27.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$11,000.00 |
$10,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,100 | LF |
$2.58 |
$1.50 |
$1.65 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 3,133.33 | SY |
$2.64 |
$2.00 |
$2.10 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 148.2 | CY |
$69.84 |
$150.00 |
$50.00 |
| 7 | 407(B) 0250 |
TACK COAT | 1,226.3 | GAL |
$2.02 |
$3.00 |
$3.30 |
| 8 | 408 5774 |
PRIME COAT | 292 | GAL |
$7.75 |
$5.00 |
$5.50 |
| 9 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 985.9 | TON |
$90.59 |
$68.00 |
$75.00 |
| 10 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 1,054.2 | TON |
$100.60 |
$70.00 |
$77.00 |
| 11 | 412 5267 |
COLD MILLING PAVEMENT | 2,700.4 | SY |
$6.44 |
$5.00 |
$6.00 |
| 12 | 609(B) 0380 |
COMBINED CURB & GUTTER (4" MOUNTABLE) | 107 | LF |
$46.00 |
$57.00 |
$50.00 |
| 13 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 500 | LF |
$6.12 |
$8.00 |
$10.00 |
| 14 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 804 | LF |
$2.91 |
$5.00 |
$4.00 |
| 15 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 500 | LF |
$16.00 |
$19.00 |
$22.00 |
| 16 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,300.00 |
$2,100.00 |
$2,400.00 |
| 17 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$1,525.00 |
$1,500.00 |
$1,625.00 |
| 18 | 501(G) 6315 |
CLSM BACKFILL | 51 | CY |
$159.00 |
$230.00 |
$250.00 |
| 19 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$24,000.00 |
$110,000.00 |
$150,000.00 |
| 20 | 504(A) 1304 |
APPROACH SLAB | 335 | SY |
$225.00 |
$210.00 |
$250.00 |
| 21 | 504(B) 1305 |
SAW-CUT GROOVING | 318.5 | SY |
$5.00 |
$5.50 |
$6.00 |
| 22 | 504(C) 6250 |
SEALED EXPANSION JOINT | 91 | LF |
$288.75 |
$390.00 |
$400.00 |
| 23 | 504(E) 1381 |
CONCRETE PARAPET | 130.5 | LF |
$161.85 |
$220.00 |
$300.00 |
| 24 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 24 | LF |
$45.00 |
$48.00 |
$25.00 |
| 25 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,885.00 |
$3,000.00 |
$3,500.00 |
| 26 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$2,285.00 |
$3,000.00 |
$3,500.00 |
| 27 | 509(B) 1328 |
CLASS A CONCRETE | 0.1 | CY |
$660.00 |
$20,000.00 |
$6,000.00 |
| 28 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$16,650.00 |
$20,000.00 |
$25,000.00 |
| 29 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,500.00 |
$3,000.00 |
$1,000.00 |
| 30 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 42 | SY |
$395.00 |
$320.00 |
$275.00 |
| 31 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 21 | SY |
$475.00 |
$630.00 |
$400.00 |
| 32 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 62 | SY |
$4.90 |
$4.00 |
$8.00 |
| 33 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 40 | LF |
$38.00 |
$35.00 |
$38.00 |
| 34 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 4 | GAL |
$102.85 |
$100.00 |
$100.00 |
| 35 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 47 | SY |
$772.45 |
$470.00 |
$512.00 |
| 36 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 758.25 | SY |
$18.75 |
$16.00 |
$20.00 |
| 37 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 402 | SF |
$93.00 |
$27.00 |
$30.00 |
| 38 | 525(A) 0100 |
(SP)NEST PREVENTION - NETTING | 1 | LSUM |
$8,000.00 |
$1,000.00 |
$20,000.00 |
| 39 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 47 | SY |
$45.62 |
$30.00 |
$33.00 |
| 40 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 18 | EA |
$800.00 |
$200.00 |
$800.00 |
| 41 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$60,000.00 |
$28,000.00 |
$20,000.00 |
| 42 | 501(G) 6315 |
CLSM BACKFILL | 42 | CY |
$159.00 |
$240.00 |
$250.00 |
| 43 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$24,000.00 |
$90,000.00 |
$150,000.00 |
| 44 | 504(A) 1304 |
APPROACH SLAB | 282 | SY |
$225.00 |
$250.00 |
$250.00 |
| 45 | 504(B) 1305 |
SAW-CUT GROOVING | 620 | SY |
$5.00 |
$5.50 |
$6.00 |
| 46 | 504(C) 6250 |
SEALED EXPANSION JOINT | 91 | LF |
$288.75 |
$410.00 |
$400.00 |
| 47 | 504(E) 6190 |
42" F-SHAPED PARAPET | 461.4 | LF |
$90.00 |
$190.00 |
$150.00 |
| 48 | 506(A) 1322 |
STRUCTURAL STEEL | 423 | LB |
$5.55 |
$17.00 |
$25.00 |
| 49 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 5 | EA |
$1,885.00 |
$2,600.00 |
$3,500.00 |
| 50 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 10 | EA |
$2,285.00 |
$2,600.00 |
$3,500.00 |
| 51 | 509(A) 0319 |
CLASS AA CONCRETE | 172.5 | CY |
$425.00 |
$1,000.00 |
$1,200.00 |
| 52 | 509(B) 1328 |
CLASS A CONCRETE | 0.4 | CY |
$660.00 |
$8,100.00 |
$6,000.00 |
| 53 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 32,030 | LB |
$1.40 |
$1.50 |
$1.55 |
| 54 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$24,500.00 |
$24,000.00 |
$50,000.00 |
| 55 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$7,500.00 |
$3,100.00 |
$1,500.00 |
| 56 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 220.1 | SY |
$4.90 |
$4.00 |
$8.00 |
| 57 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 40 | LF |
$38.00 |
$35.00 |
$38.00 |
| 58 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 4 | GAL |
$102.85 |
$100.00 |
$100.00 |
| 59 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 45.8 | SY |
$772.45 |
$470.00 |
$512.00 |
| 60 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 291 | SF |
$93.00 |
$27.00 |
$30.00 |
| 61 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 47.8 | SY |
$45.62 |
$30.00 |
$33.00 |
| 62 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 15 | EA |
$800.00 |
$200.00 |
$800.00 |
| 63 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$74,550.00 |
$160,000.00 |
$159,000.00 |
| 64 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 2,000 | LF |
$0.2800 |
$0.2500 |
$0.2700 |
| 65 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 360 | SD |
$4.94 |
$10.00 |
$11.00 |
| 66 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,400 | LF |
$20.00 |
$17.00 |
$19.00 |
| 67 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 2,400 | LF |
$3.68 |
$3.50 |
$4.00 |
| 68 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 360 | SD |
$5.27 |
$5.00 |
$5.50 |
| 69 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 18,456 | SD |
$0.3100 |
$0.1500 |
$0.1600 |
| 70 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 7,074 | SD |
$0.6500 |
$1.00 |
$1.10 |
| 71 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,900 | SD |
$1.13 |
$1.00 |
$1.10 |
| 72 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 5,004 | SD |
$1.70 |
$0.2500 |
$0.2700 |
| 73 | 880(C) 8848 |
WING BARRICADES | 1,440 | SD |
$1.26 |
$0.5000 |
$0.5500 |
| 74 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,264 | SD |
$0.2000 |
$1.00 |
$1.10 |
| 75 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 10,548 | SD |
$0.1500 |
$0.0500 |
$0.0500 |
| 76 | 880(F) 8878 |
DRUMS | 10,314 | SD |
$0.2000 |
$0.0500 |
$0.0500 |
| 77 | 880(G) 8890 |
CHANNELIZER CONES | 24,066 | SD |
$0.3000 |
$0.0500 |
$0.0500 |
| 78 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 776 | SD |
$8.75 |
$10.00 |
$11.00 |
| 79 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 96 | EAGP |
$385.00 |
$230.00 |
$248.00 |
| 80 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 20 | EA |
$70.00 |
$50.00 |
$55.00 |
| 81 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$149.00 |
$250.00 |
$275.00 |
| 82 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 150.5 | SF |
$15.00 |
$20.00 |
$22.00 |
| 83 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 182 | LF |
$8.00 |
$8.00 |
$9.00 |
| 84 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 7,330 | LF |
$0.7500 |
$1.00 |
$1.10 |
| 85 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 440 | LF |
$1.15 |
$1.50 |
$1.37 |
| 86 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 220 | LF |
$6.25 |
$3.00 |
$3.30 |
| 87 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 7 | EA |
$167.00 |
$100.00 |
$110.00 |
| 88 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 8,000 | LF |
$0.3000 |
$0.2500 |
$0.2700 |
| 89 | 857(F) 8007 |
PAVEMENT MARKING REMOVAL(ARROWS) | 10 | EA |
$37.50 |
$25.00 |
$28.00 |
| 90 | 857(F) 8008 |
PAVEMENT MARKING REMOVAL(WORDS) | 10 | EA |
$35.25 |
$25.00 |
$28.00 |
| 91 | 890 7700 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$27,500.00 |
$12,000.00 |
$15,000.00 |
| 92 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,000.00 |
$10,000.00 |
$8,000.00 |
| 93 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$95,000.00 |
$150,000.00 |
$125,776.00 |