| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$35,000.00 |
$20,000.00 |
$6,552.34 |
$10,000.00 |
$10,500.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$8,000.00 |
$10,000.00 |
$36,259.92 |
$50,000.00 |
$20,000.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$1,000.00 |
$1,500.00 |
$1,000.00 |
$2,567.53 |
$2,000.00 |
$10,500.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,295 | LF |
$2.50 |
$1.49 |
$2.85 |
$1.75 |
$4.96 |
$4.00 |
$1.80 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 20 | LF |
$20.00 |
$14.95 |
$14.56 |
$8.00 |
$9.55 |
$15.00 |
$20.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 8,000 | SY |
$3.00 |
$1.24 |
$1.38 |
$2.20 |
$1.60 |
$3.00 |
$1.51 |
| 7 | 232(B) 2814 |
SEEDING METHOD B | 1 | AC |
$600.00 |
$495.00 |
$988.00 |
$500.00 |
$635.46 |
$3,500.00 |
$600.00 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1 | AC |
$500.00 |
$395.00 |
$888.00 |
$450.00 |
$507.08 |
$2,800.00 |
$500.00 |
| 9 | 241 2832 |
MOWING | 0.06 | AC |
$3,000.00 |
$295.00 |
$122.00 |
$5,000.00 |
$378.71 |
$1,400.00 |
$1,500.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 446 | CY |
$60.00 |
$50.00 |
$70.00 |
$60.00 |
$54.79 |
$57.00 |
$62.62 |
| 11 | 307(B) 4210 |
CEMENT KILN DUST | 76 | TON |
$70.00 |
$60.00 |
$60.00 |
$60.00 |
$165.28 |
$120.00 |
$75.00 |
| 12 | 307(F) 4250 |
CEMENTITIOUS MODIFIED SUBGRADE | 2,113 | SY |
$6.00 |
$5.00 |
$5.00 |
$5.00 |
$6.29 |
$24.00 |
$7.00 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 2,004 | SY |
$2.00 |
$2.00 |
$2.00 |
$2.00 |
$2.23 |
$2.00 |
$3.60 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 355 | TON |
$36.00 |
$35.00 |
$75.00 |
$30.00 |
$22.33 |
$30.00 |
$31.16 |
| 15 | 408 5774 |
PRIME COAT | 1,502 | GAL |
$6.00 |
$9.50 |
$9.50 |
$9.50 |
$5.00 |
$12.00 |
$12.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 108 | TON |
$160.00 |
$262.00 |
$262.00 |
$262.00 |
$125.00 |
$315.00 |
$330.00 |
| 17 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 531 | SY |
$30.00 |
$25.00 |
$20.00 |
$60.00 |
$30.20 |
$20.00 |
$65.00 |
| 18 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 1,321 | SY |
$45.00 |
$30.00 |
$40.00 |
$80.00 |
$33.96 |
$65.00 |
$75.00 |
| 19 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 140 | SY |
$75.00 |
$125.00 |
$105.00 |
$60.00 |
$111.52 |
$110.00 |
$125.00 |
| 20 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 515 | CY |
$150.00 |
$145.00 |
$175.00 |
$155.00 |
$154.78 |
$130.00 |
$145.00 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$3,000.00 |
$500.00 |
$1,500.00 |
$5,000.00 |
$2,937.09 |
$5,000.00 |
$12,500.00 |
| 22 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 1,276 | SY |
$10.00 |
$15.00 |
$20.00 |
$15.00 |
$7.12 |
$10.00 |
$35.00 |
| 23 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 693 | SY |
$7.00 |
$24.00 |
$20.00 |
$15.00 |
$7.12 |
$10.00 |
$31.00 |
| 24 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 154 | LF |
$12.00 |
$5.00 |
$5.00 |
$5.00 |
$6.95 |
$10.00 |
$10.00 |
| 25 | 619(B) 5150 |
REMOVAL OF BRICK CHATTER MEDIAN | 140 | SY |
$10.00 |
$23.80 |
$35.00 |
$15.00 |
$7.12 |
$25.00 |
$18.00 |
| 26 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 44 | LF |
$25.00 |
$20.00 |
$33.00 |
$33.00 |
$28.24 |
$25.00 |
$24.00 |
| 27 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,500.00 |
$2,300.00 |
$2,200.00 |
$2,200.00 |
$2,952.65 |
$2,800.00 |
$2,875.00 |
| 28 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$2,000.00 |
$1,775.00 |
$1,950.00 |
$1,950.00 |
$2,278.68 |
$2,200.00 |
$2,220.00 |
| 29 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 313.4 | CY |
$20.00 |
$15.00 |
$35.00 |
$22.00 |
$16.33 |
$42.00 |
$16.00 |
| 30 | 501(G) 6309 |
CLSM BACKFILL | 492.4 | CY |
$150.00 |
$120.00 |
$145.00 |
$120.00 |
$174.31 |
$150.00 |
$186.00 |
| 31 | 504(A) 1304 |
APPROACH SLAB | 703.6 | SY |
$210.00 |
$175.00 |
$165.00 |
$225.00 |
$262.08 |
$192.00 |
$322.50 |
| 32 | 504(B) 1305 |
SAW-CUT GROOVING | 2,333.4 | SY |
$4.00 |
$3.05 |
$5.00 |
$3.05 |
$3.92 |
$5.00 |
$4.00 |
| 33 | 504(C) 6250 |
SEALED EXPANSION JOINT | 154.8 | LF |
$275.00 |
$300.00 |
$325.00 |
$270.00 |
$380.86 |
$275.00 |
$410.00 |
| 34 | 504(E) 1381 |
CONCRETE PARAPET | 653.4 | LF |
$70.00 |
$95.00 |
$135.00 |
$90.00 |
$160.91 |
$150.00 |
$175.00 |
| 35 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 478,768 | LB |
$2.50 |
$1.85 |
$2.10 |
$1.66 |
$2.02 |
$1.90 |
$2.22 |
| 36 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$2,500.00 |
$2,750.00 |
$4,450.00 |
$2,500.00 |
$3,004.90 |
$2,400.00 |
$3,650.00 |
| 37 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 30 | EA |
$2,500.00 |
$2,750.00 |
$4,120.00 |
$2,600.00 |
$3,004.90 |
$2,200.00 |
$3,750.00 |
| 38 | 509 6152 |
SPECIAL CONCRETE FINISH | 264 | SY |
$15.00 |
$118.00 |
$120.00 |
$88.00 |
$174.04 |
$30.00 |
$110.00 |
| 39 | 509(A) 1326 |
CLASS AA CONCRETE | 501.4 | CY |
$650.00 |
$700.00 |
$600.00 |
$815.00 |
$828.82 |
$1,005.00 |
$1,175.00 |
| 40 | 509(B) 1328 |
CLASS A CONCRETE | 4.6 | CY |
$1,400.00 |
$1,450.00 |
$2,500.00 |
$1,000.00 |
$1,818.63 |
$1,350.00 |
$2,500.00 |
| 41 | 509(D) 1331 |
CLASS C CONCRETE | 10.6 | CY |
$400.00 |
$800.00 |
$1,600.00 |
$700.00 |
$611.04 |
$690.00 |
$675.00 |
| 42 | 511(A) 1332 |
REINFORCING STEEL | 204 | LB |
$1.00 |
$0.8000 |
$3.81 |
$1.00 |
$1.00 |
$1.00 |
$2.05 |
| 43 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 184,046 | LB |
$1.10 |
$0.9000 |
$1.10 |
$1.50 |
$1.05 |
$1.00 |
$1.21 |
| 44 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 300 | SY |
$550.00 |
$400.00 |
$350.00 |
$300.00 |
$658.33 |
$300.00 |
$346.00 |
| 45 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,140 | SY |
$4.00 |
$3.50 |
$3.50 |
$3.50 |
$4.49 |
$5.25 |
$4.03 |
| 46 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 96 | LF |
$35.00 |
$30.50 |
$30.50 |
$30.00 |
$44.98 |
$60.00 |
$40.00 |
| 47 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 3.2 | GAL |
$90.00 |
$100.00 |
$100.00 |
$100.00 |
$147.49 |
$120.00 |
$100.00 |
| 48 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 52 | SY |
$550.00 |
$624.50 |
$624.50 |
$500.00 |
$921.07 |
$720.00 |
$732.00 |
| 49 | 523(A) 6550 |
SEALER CRACK PREPARATION | 464.2 | LF |
$4.00 |
$4.00 |
$4.00 |
$4.00 |
$5.13 |
$5.00 |
$4.60 |
| 50 | 523(B) 6560 |
SEALER RESIN | 3.9 | GAL |
$100.00 |
$120.00 |
$120.00 |
$120.00 |
$154.05 |
$144.00 |
$172.50 |
| 51 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,095 | TON |
$40.00 |
$35.00 |
$64.00 |
$40.00 |
$32.58 |
$55.00 |
$40.87 |
| 52 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 224 | TON |
$35.00 |
$25.00 |
$32.00 |
$30.00 |
$25.40 |
$45.00 |
$31.43 |
| 53 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 144 | LF |
$30.00 |
$20.00 |
$40.00 |
$25.00 |
$21.67 |
$20.00 |
$30.00 |
| 54 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$25.00 |
$20.00 |
$40.00 |
$25.00 |
$22.96 |
$20.00 |
$45.00 |
| 55 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$221,000.00 |
$100,000.00 |
$158,000.00 |
$237,000.00 |
$82,730.56 |
$100,000.00 |
$331,760.00 |
| 56 | 805(A) 8712 |
(PL)REMOVAL OF LIGHT POLE | 4 | EA |
$1,000.00 |
$350.00 |
$1,200.00 |
$50.00 |
$1,863.14 |
$9,000.00 |
$1,600.00 |
| 57 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 3 | EA |
$150.00 |
$150.00 |
$100.00 |
$150.00 |
$192.56 |
$180.00 |
$172.50 |
| 58 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 33 | LF |
$15.00 |
$6.00 |
$15.00 |
$6.00 |
$7.70 |
$8.00 |
$7.00 |
| 59 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 6 | EA |
$12.00 |
$15.00 |
$12.00 |
$15.00 |
$25.68 |
$18.00 |
$18.00 |
| 60 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 6,192 | LF |
$1.00 |
$0.8500 |
$1.00 |
$0.8500 |
$1.09 |
$1.00 |
$1.10 |
| 61 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 239 | LF |
$2.50 |
$3.00 |
$2.00 |
$3.00 |
$3.85 |
$3.60 |
$4.00 |
| 62 | 805(A) 8712 |
(PL)REMOVAL OF LIGHT POLE | 2 | EA |
$1,000.00 |
$350.00 |
$1,200.00 |
$1,500.00 |
$1,863.14 |
$9,000.00 |
$1,600.00 |
| 63 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,480 | LF |
$0.5000 |
$0.2500 |
$0.3500 |
$0.2500 |
$0.3200 |
$0.3000 |
$0.5000 |
| 64 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 5,210 | LF |
$0.7500 |
$0.8000 |
$0.8500 |
$0.8000 |
$1.03 |
$1.00 |
$1.00 |
| 65 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,244 | LF |
$0.5000 |
$0.5000 |
$0.5000 |
$0.5000 |
$0.6400 |
$0.6000 |
$0.6500 |
| 66 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 420 | SD |
$15.00 |
$5.00 |
$10.00 |
$5.00 |
$6.42 |
$6.00 |
$7.00 |
| 67 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 610 | LF |
$35.00 |
$35.01 |
$30.00 |
$70.00 |
$22.98 |
$36.00 |
$52.00 |
| 68 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 610 | LF |
$5.00 |
$7.02 |
$8.00 |
$10.00 |
$7.06 |
$6.00 |
$8.00 |
| 69 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,300 | SD |
$0.5000 |
$0.2000 |
$0.1000 |
$0.2000 |
$0.2600 |
$0.4000 |
$0.3000 |
| 70 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 630 | SD |
$1.00 |
$1.00 |
$2.00 |
$1.00 |
$1.28 |
$3.60 |
$1.20 |
| 71 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,150 | SD |
$1.50 |
$2.00 |
$2.00 |
$2.00 |
$2.57 |
$3.60 |
$2.40 |
| 72 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 630 | SD |
$0.5000 |
$1.00 |
$2.50 |
$1.00 |
$1.28 |
$4.20 |
$1.20 |
| 73 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$2.00 |
$1.00 |
$2.00 |
$1.00 |
$1.28 |
$1.20 |
$1.20 |
| 74 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,310 | SD |
$0.2000 |
$0.5000 |
$0.3500 |
$0.5000 |
$0.6400 |
$0.6000 |
$0.7000 |
| 75 | 880(F) 8878 |
DRUMS | 17,220 | SD |
$0.2500 |
$0.1000 |
$0.1500 |
$0.1000 |
$0.1300 |
$0.1500 |
$0.1500 |
| 76 | 880(G) 8890 |
CHANNELIZER CONES | 4,620 | SD |
$0.3000 |
$0.1000 |
$0.1500 |
$0.1000 |
$0.1300 |
$0.1500 |
$0.1500 |
| 77 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 420 | SD |
$10.00 |
$7.50 |
$15.00 |
$7.50 |
$9.63 |
$9.00 |
$10.00 |
| 78 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$35,000.00 |
$10,000.00 |
$19,000.00 |
$4,700.00 |
$39,010.38 |
$40,000.00 |
$17,500.00 |
| 79 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$15,000.00 |
$7,000.00 |
$3,500.00 |
$2,500.00 |
$4,200.00 |
$8,000.00 |
| 80 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$176,000.00 |
$224,000.00 |
$120,000.00 |
$262,600.00 |
$126,647.02 |
$186,000.00 |
$200,000.00 |