| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$30,000.00 |
$20,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$213,000.00 |
$350,000.00 |
$375,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 12,882 | LF |
$2.50 |
$1.30 |
$1.35 |
| 4 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$225.00 |
$190.00 |
$250.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,232 | LF |
$6.00 |
$7.00 |
$6.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 62,113 | SY |
$1.50 |
$1.25 |
$1.05 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 25.66 | AC |
$400.00 |
$400.00 |
$350.00 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 14,592 | CY |
$40.00 |
$60.00 |
$60.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,426 | TON |
$25.00 |
$34.00 |
$31.00 |
| 10 | 408 5774 |
PRIME COAT | 44,994 | GAL |
$4.00 |
$2.00 |
$7.00 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 19,473 | TON |
$75.00 |
$52.75 |
$75.00 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 9,640 | TON |
$80.00 |
$64.00 |
$84.50 |
| 13 | 504(F) 6006 |
HANDRAILING | 29 | LF |
$200.00 |
$145.00 |
$175.00 |
| 14 | 509(A) 0319 |
CLASS AA CONCRETE | 77.95 | CY |
$600.00 |
$884.00 |
$800.00 |
| 15 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 5 | CY |
$700.00 |
$1,640.00 |
$1,500.00 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 96.1 | CY |
$300.00 |
$500.00 |
$300.00 |
| 17 | 511(A) 0332 |
REINFORCING STEEL | 10,181 | LB |
$1.00 |
$1.00 |
$1.15 |
| 18 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 441 | TON |
$40.00 |
$90.00 |
$47.50 |
| 19 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 66 | LF |
$10.00 |
$30.00 |
$25.00 |
| 20 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 708.5 | SY |
$60.00 |
$70.00 |
$65.00 |
| 21 | 611(G) 5706 |
INLET CDI RCP DES. 3 | 1 | EA |
$3,000.00 |
$2,100.00 |
$2,800.00 |
| 22 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 128 | LF |
$90.00 |
$97.00 |
$95.00 |
| 23 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 164 | LF |
$70.00 |
$98.00 |
$110.00 |
| 24 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 516 | LF |
$90.00 |
$114.00 |
$125.00 |
| 25 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 194 | LF |
$150.00 |
$180.00 |
$155.00 |
| 26 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 218 | LF |
$30.00 |
$35.00 |
$30.00 |
| 27 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 28 | LF |
$40.00 |
$38.00 |
$36.00 |
| 28 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 2,890 | LF |
$30.00 |
$38.00 |
$32.50 |
| 29 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 432 | LF |
$40.00 |
$45.00 |
$36.50 |
| 30 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 90 | LF |
$45.00 |
$71.00 |
$48.00 |
| 31 | 613(B) 5168 |
24" X 18" CORR. GALV. STEEL PIPE ARCH | 122 | LF |
$35.00 |
$41.00 |
$41.50 |
| 32 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 150 | EA |
$250.00 |
$320.00 |
$235.00 |
| 33 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 24 | EA |
$325.00 |
$350.00 |
$315.00 |
| 34 | 613(L) 4522 |
35" X 24" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$350.00 |
$475.00 |
$410.00 |
| 35 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 9 | EA |
$350.00 |
$325.00 |
$300.00 |
| 36 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$400.00 |
$400.00 |
$375.00 |
| 37 | 613(O) 4377 |
SPECIAL END SECTION OF 30" RCP ROUND | 5 | EA |
$1,600.00 |
$1,000.00 |
$950.00 |
| 38 | 613(O) 4800 |
SPECIAL END SECTION OF 22" X 13" RCP ARCH | 8 | EA |
$1,700.00 |
$1,150.00 |
$875.00 |
| 39 | 613(O) 4804 |
SPECIAL END SECTION OF 28" X 18" RCP ARCH | 18 | EA |
$2,000.00 |
$1,200.00 |
$1,200.00 |
| 40 | 613(O) 4814 |
SPECIAL END SECTION OF 43" X 26" RCP ARCH | 5 | EA |
$2,200.00 |
$3,500.00 |
$1,500.00 |
| 41 | 613(P) 7030 |
24" X 18" GALV. STEEL CULVERT END SECTION ARCH | 6 | EA |
$325.00 |
$350.00 |
$310.00 |
| 42 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$25,000.00 |
$35,000.00 |
| 43 | 619(B) 0291 |
REMOVAL OF HEADWALL | 7 | EA |
$1,100.00 |
$1,600.00 |
$1,000.00 |
| 44 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 56,988 | SY |
$2.00 |
$2.00 |
$4.25 |
| 45 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 713 | SY |
$10.00 |
$10.00 |
$8.00 |
| 46 | 619(C) 0924 |
SAWING PAVEMENT | 293 | LF |
$3.00 |
$8.00 |
$5.00 |
| 47 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 30 | LF |
$10.00 |
$75.00 |
$25.00 |
| 48 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 68 | EA |
$250.00 |
$400.00 |
$175.00 |
| 49 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 38 | EA |
$150.00 |
$50.00 |
$45.00 |
| 50 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 204.32 | SF |
$20.00 |
$31.00 |
$28.00 |
| 51 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 448 | LF |
$15.00 |
$9.00 |
$8.00 |
| 52 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 78,857 | LF |
$0.2500 |
$0.1200 |
$0.1400 |
| 53 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$40,000.00 |
$45,000.00 |
$14,500.00 |
| 54 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$29,970.00 |
$108,000.00 |
$108,500.00 |
| 55 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$6,000.00 |
$8,500.00 |
| 56 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$9,885.00 |
$5,000.00 |
| 57 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$226,050.00 |
$240,000.00 |
$390,003.56 |