| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 3,400 | CY |
$10.00 |
$19.10 |
$10.00 |
$20.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$110,000.00 |
$79,500.00 |
$117,737.00 |
$50,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,600 | LF |
$2.00 |
$1.60 |
$1.45 |
$1.50 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 420 | LF |
$7.25 |
$7.40 |
$7.96 |
$7.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 39,530 | SY |
$1.50 |
$1.05 |
$1.25 |
$1.25 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 8.2 | AC |
$375.00 |
$190.00 |
$250.00 |
$400.00 |
| 7 | 307(A) 4200 |
FLY ASH | 4,393 | TON |
$58.00 |
$61.50 |
$58.00 |
$55.00 |
| 8 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 80,942 | SY |
$2.55 |
$2.90 |
$3.00 |
$3.25 |
| 9 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 30,165 | LF |
$5.25 |
$3.35 |
$7.57 |
$9.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 540 | TON |
$48.00 |
$61.60 |
$51.94 |
$55.00 |
| 11 | 407(B) 0250 |
TACK COAT | 5,603 | GAL |
$3.50 |
$3.55 |
$3.40 |
$2.20 |
| 12 | 408 5774 |
PRIME COAT | 26,003 | GAL |
$3.75 |
$4.50 |
$3.40 |
$3.50 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 19,815 | TON |
$82.00 |
$77.00 |
$74.98 |
$84.00 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 8,321 | TON |
$92.00 |
$87.00 |
$89.72 |
$94.00 |
| 15 | 501(G) 6309 |
CLSM BACKFILL | 95 | CY |
$185.00 |
$117.00 |
$125.00 |
$150.00 |
| 16 | 504 6179 |
BRIDGE TRAFFIC RAIL | 208 | LF |
$150.00 |
$132.50 |
$156.00 |
$200.00 |
| 17 | 509(B) 0321 |
CLASS A CONCRETE | 27.09 | CY |
$605.00 |
$583.00 |
$1,000.00 |
$700.00 |
| 18 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 4.6 | CY |
$550.00 |
$662.50 |
$1,500.00 |
$1,500.00 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$375.00 |
$583.00 |
$750.00 |
$400.00 |
| 20 | 511(A) 0332 |
REINFORCING STEEL | 2,950 | LB |
$1.00 |
$1.60 |
$1.25 |
$1.25 |
| 21 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 46 | TON |
$87.00 |
$84.80 |
$85.94 |
$99.00 |
| 22 | 611(L) 0487 |
JUNCTION BOXES | 55.44 | CF |
$100.00 |
$95.40 |
$82.17 |
$110.00 |
| 23 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 166 | LF |
$75.00 |
$103.00 |
$211.75 |
$106.00 |
| 24 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 96 | LF |
$85.00 |
$129.00 |
$233.50 |
$132.00 |
| 25 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 36 | LF |
$115.00 |
$143.00 |
$245.63 |
$148.00 |
| 26 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 64 | LF |
$235.00 |
$175.00 |
$273.46 |
$181.00 |
| 27 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 618 | LF |
$26.00 |
$21.50 |
$37.98 |
$22.00 |
| 28 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 86 | LF |
$28.00 |
$30.00 |
$45.13 |
$31.00 |
| 29 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 120 | LF |
$35.00 |
$37.00 |
$54.06 |
$39.00 |
| 30 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 102 | LF |
$53.00 |
$55.00 |
$71.29 |
$55.00 |
| 31 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 34 | EA |
$205.00 |
$159.00 |
$614.06 |
$165.00 |
| 32 | 613(L) 4506 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 8 | EA |
$775.00 |
$1,060.00 |
$1,945.00 |
$1,100.00 |
| 33 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 6 | EA |
$850.00 |
$1,170.00 |
$2,050.00 |
$1,250.00 |
| 34 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$375.00 |
$223.00 |
$709.10 |
$225.00 |
| 35 | 613(L) 4522 |
35" X 24" PREFAB. CULVERT END SECTION, ARCH | 6 | EA |
$460.00 |
$371.00 |
$878.00 |
$385.00 |
| 36 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,000.00 |
$1,378.00 |
$2,250.00 |
$1,500.00 |
| 37 | 613(L) 4530 |
42" X 29" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$650.00 |
$583.00 |
$1,133.00 |
$650.00 |
| 38 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,300.00 |
$1,908.00 |
$2,900.00 |
$2,000.00 |
| 39 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$60,000.00 |
$26,500.00 |
$83,000.00 |
$12,000.00 |
| 40 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$6,000.00 |
$23,108.00 |
$7,500.00 |
$5,000.00 |
| 41 | 619(C) 0924 |
SAWING PAVEMENT | 136 | LF |
$6.25 |
$16.80 |
$3.00 |
$3.00 |
| 42 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 400 | LF |
$17.00 |
$16.50 |
$16.98 |
$15.40 |
| 43 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 16 | EA |
$2,050.00 |
$1,190.00 |
$1,234.80 |
$1,120.00 |
| 44 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 16 | EA |
$2,200.00 |
$2,280.00 |
$2,370.38 |
$2,150.00 |
| 45 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 195.67 | SF |
$55.00 |
$43.50 |
$45.00 |
$41.00 |
| 46 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 19,704 | LF |
$0.5000 |
$0.8500 |
$0.8000 |
$0.8000 |
| 47 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$30,000.00 |
$5,300.00 |
$20,000.00 |
$5,000.00 |
| 48 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$38,000.00 |
$39,900.00 |
$29,000.00 |
$50,000.00 |
| 49 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,800.00 |
$16,800.00 |
$10,000.00 |
$25,000.00 |
| 50 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$175,000.00 |
$219,000.00 |
$140,000.00 |
$229,000.00 |