| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 9,814 | CY |
$6.50 |
$10.90 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$20,000.00 |
$54,500.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,000 | LF |
$2.25 |
$1.30 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 560 | LF |
$8.25 |
$6.55 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 24,752 | SY |
$1.85 |
$1.10 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 5.1 | AC |
$500.00 |
$202.00 |
| 7 | 307(A) 4200 |
FLY ASH | 322 | TON |
$65.00 |
$61.00 |
| 8 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 8,468 | SY |
$3.15 |
$4.55 |
| 9 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 3,153 | LF |
$6.20 |
$10.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 314 | TON |
$55.00 |
$42.00 |
| 11 | 407(B) 0250 |
TACK COAT | 5,654 | GAL |
$2.50 |
$4.10 |
| 12 | 408 5774 |
PRIME COAT | 2,590 | GAL |
$4.00 |
$5.15 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,880 | TON |
$90.00 |
$83.25 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,563 | TON |
$92.00 |
$98.00 |
| 15 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 400 | TON |
$180.00 |
$215.00 |
| 16 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 80 | LF |
$65.00 |
$88.25 |
| 17 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 120 | LF |
$185.00 |
$272.00 |
| 18 | 613(A) 0497 |
54" R.C.PIPE CLASS III | 120 | LF |
$195.00 |
$333.00 |
| 19 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 116 | LF |
$75.00 |
$160.00 |
| 20 | 613(A) 4499 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 80 | LF |
$205.00 |
$250.00 |
| 21 | 613(L) 4540 |
51" X 31" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$3,000.00 |
$1,180.00 |
| 22 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$750.00 |
$3,025.00 |
| 23 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$2,100.00 |
$3,450.00 |
| 24 | 613(L) 5740 |
54" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$2,400.00 |
$3,300.00 |
| 25 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 2 | EA |
$1,400.00 |
$2,400.00 |
| 26 | 619(C) 0924 |
SAWING PAVEMENT | 96 | LF |
$16.00 |
$16.95 |
| 27 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 70.26 | SF |
$35.00 |
$38.15 |
| 28 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 20,584 | LF |
$0.5500 |
$0.7000 |
| 29 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$4,000.00 |
| 30 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$6,000.00 |
$11,000.00 |
| 31 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$13,000.00 |
| 32 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$115,000.00 |
$140,000.00 |