| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 100 | CY |
$20.00 |
$10.32 |
$20.00 |
$37.25 |
| 2 | 202(D) 4781 |
UNCLASSIFIED BORROW (TOPSOIL) | 400 | CY |
$14.36 |
$10.65 |
$30.00 |
$66.39 |
| 3 | 209 0120 |
MACHINE GRADING | 620 | LF |
$6.65 |
$15.07 |
$10.00 |
$5.42 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 4,500 | SY |
$2.50 |
$1.47 |
$2.10 |
$1.44 |
| 5 | 307(A) 4200 |
FLY ASH | 1,450 | TON |
$61.35 |
$78.58 |
$82.00 |
$54.00 |
| 6 | 307(D) 4230 |
LIME | 295 | TON |
$131.17 |
$178.53 |
$164.00 |
$168.00 |
| 7 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 30,500 | SY |
$2.92 |
$3.00 |
$3.25 |
$1.70 |
| 8 | 307(G) 4260 |
LIME PRETREATMENT | 27,000 | SY |
$1.77 |
$1.09 |
$3.25 |
$1.11 |
| 9 | 317 4270 |
CEMENT TREATED BASE | 62,500 | SY |
$11.63 |
$12.20 |
$10.97 |
$18.74 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 62,500 | SY |
$1.19 |
$0.1000 |
$2.00 |
$0.7500 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 800 | TON |
$22.00 |
$31.80 |
$38.00 |
$40.13 |
| 12 | 408 5774 |
PRIME COAT | 42,500 | GAL |
$3.95 |
$1.00 |
$4.50 |
$4.43 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 70 | TON |
$210.00 |
$130.83 |
$115.00 |
$260.36 |
| 14 | 412 5267 |
COLD MILLING PAVEMENT | 1,800 | SY |
$2.16 |
$2.66 |
$3.60 |
$4.99 |
| 15 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 60,450 | SY |
$15.34 |
$13.76 |
$17.75 |
$16.85 |
| 16 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 15,100 | CY |
$118.00 |
$125.00 |
$110.00 |
$94.76 |
| 17 | 509(B) 0321 |
CLASS A CONCRETE | 680 | CY |
$427.98 |
$291.00 |
$200.00 |
$425.60 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$265.32 |
$266.43 |
$395.00 |
$301.79 |
| 19 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 1,000 | LF |
$5.71 |
$17.00 |
$7.00 |
$28.78 |
| 20 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 4,400 | LF |
$22.01 |
$12.46 |
$21.00 |
$11.38 |
| 21 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 1,600 | SY |
$42.00 |
$46.01 |
$34.00 |
$86.58 |
| 22 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 200 | SY |
$50.17 |
$47.93 |
$50.00 |
$76.44 |
| 23 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 32 | SF |
$25.44 |
$14.96 |
$21.00 |
$64.12 |
| 24 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 6 | EA |
$2,805.12 |
$2,786.44 |
$180.00 |
$2,269.93 |
| 25 | 611(G) 5704 |
INLET CDI RCP DES. 1 | 1 | EA |
$2,370.30 |
$3,211.19 |
$2,400.00 |
$3,531.75 |
| 26 | 611(G) 6006 |
INLET (SMD-TYPE 2B) | 1 | EA |
$3,375.10 |
$2,380.68 |
$2,300.00 |
$4,481.87 |
| 27 | 611(I) 4489 |
REPLACEMENT OF INLET FRM&GRT (SSIF-FRM,CIG-GRT-RVG-F) | 12 | EA |
$330.00 |
$534.63 |
$335.00 |
$497.55 |
| 28 | 611(M) 4488 |
REPLACEMENT OF CAST IRON HOOD | 12 | EA |
$282.00 |
$372.24 |
$170.00 |
$945.85 |
| 29 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 580 | LF |
$53.05 |
$46.21 |
$33.00 |
$80.54 |
| 30 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 64 | LF |
$62.95 |
$54.96 |
$50.00 |
$90.07 |
| 31 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 200 | CY |
$24.42 |
$64.47 |
$60.00 |
$58.93 |
| 32 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 86 | LF |
$3.87 |
$6.50 |
$4.00 |
$15.05 |
| 33 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 58,300 | SY |
$4.66 |
$3.94 |
$6.00 |
$7.94 |
| 34 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 8,550 | SY |
$3.75 |
$2.88 |
$3.60 |
$5.95 |
| 35 | 619(B) 4741 |
REMOVAL OF DRAINAGE INLETS | 1 | EA |
$549.51 |
$650.90 |
$850.00 |
$1,783.61 |
| 36 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 380 | SY |
$6.39 |
$9.15 |
$8.00 |
$18.23 |
| 37 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 506 | LF |
$2.90 |
$2.24 |
$4.00 |
$5.21 |
| 38 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 1,550 | LF |
$12.97 |
$10.65 |
$6.00 |
$14.30 |
| 39 | 619(C) 0924 |
SAWING PAVEMENT | 618 | LF |
$2.92 |
$3.32 |
$4.00 |
$5.91 |
| 40 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 300 | LF |
$16.48 |
$17.04 |
$20.00 |
$16.66 |
| 41 | 623(C) 5202 |
BEAM GUARDRAIL THRIE-BEAM SINGLE | 404 | LF |
$67.00 |
$23.38 |
$28.00 |
$22.86 |
| 42 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,130.46 |
$3,061.88 |
$2,700.00 |
$2,994.11 |
| 43 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$1,648.22 |
$2,279.10 |
$2,200.00 |
$2,228.66 |
| 44 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 8 | EA |
$10.48 |
$10.65 |
$17.80 |
$10.41 |
| 45 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 6,900 | LF |
$0.1700 |
$0.1100 |
$0.1200 |
$0.1000 |
| 46 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 6,900 | LF |
$0.1700 |
$0.5300 |
$0.5800 |
$0.5200 |
| 47 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 420 | SD |
$14.00 |
$5.33 |
$5.84 |
$5.24 |
| 48 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 210 | SD |
$13.33 |
$10.65 |
$11.68 |
$10.48 |
| 49 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,600 | LF |
$23.00 |
$25.00 |
$9.80 |
$19.70 |
| 50 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,600 | LF |
$3.50 |
$0.8000 |
$4.66 |
$3.94 |
| 51 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 420 | SD |
$4.36 |
$1.07 |
$1.17 |
$1.05 |
| 52 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,670 | SD |
$0.2200 |
$0.5300 |
$0.5800 |
$0.5200 |
| 53 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 16,170 | SD |
$0.6400 |
$0.1100 |
$0.1200 |
$0.1000 |
| 54 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,940 | SD |
$1.13 |
$4.26 |
$4.67 |
$4.19 |
| 55 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,410 | SD |
$0.3900 |
$0.2700 |
$0.2900 |
$0.2600 |
| 56 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$0.8800 |
$1.07 |
$1.17 |
$1.05 |
| 57 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 1,680 | SD |
$0.0500 |
$1.07 |
$1.17 |
$1.05 |
| 58 | 880(F) 8878 |
DRUMS | 14,280 | SD |
$0.1700 |
$0.2100 |
$0.2300 |
$0.2100 |
| 59 | 880(G) 8890 |
CHANNELIZER CONES | 13,440 | SD |
$0.2500 |
$0.2100 |
$0.2300 |
$0.2100 |
| 60 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 420 | SD |
$11.25 |
$10.65 |
$11.68 |
$10.48 |
| 61 | 802(A) 8310 |
2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 125 | LF |
$18.00 |
$10.65 |
$11.68 |
$10.52 |
| 62 | 802(B) 8334 |
1" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 109 | LF |
$10.00 |
$6.39 |
$7.01 |
$6.31 |
| 63 | 802(B) 8336 |
1 1/2" PVC SCH.40 PLASTIC CONDUIT BORED | 140 | LF |
$15.50 |
$14.91 |
$16.35 |
$14.73 |
| 64 | 802(B) 8338 |
1 1/2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 1,200 | LF |
$4.75 |
$4.26 |
$4.67 |
$4.21 |
| 65 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 160 | LF |
$4.20 |
$8.52 |
$9.34 |
$8.41 |
| 66 | 802(B) 8344 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 245 | LF |
$17.70 |
$21.30 |
$23.35 |
$21.04 |
| 67 | 802(B) 8346 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 620 | LF |
$8.90 |
$8.52 |
$9.34 |
$8.41 |
| 68 | 802(E) 8370 |
JUNCTION BOX(6" X 6" X 4") | 2 | EA |
$500.00 |
$372.75 |
$408.65 |
$368.14 |
| 69 | 803(A) 8065 |
PULL BOX(SIZE I) | 8 | EA |
$350.00 |
$367.43 |
$402.81 |
$362.89 |
| 70 | 803(A) 8066 |
PULL BOX(SIZE II) | 1 | EA |
$400.00 |
$441.98 |
$484.53 |
$436.51 |
| 71 | 803(A) 8067 |
PULL BOX(SIZE III) | 11 | EA |
$295.00 |
$340.80 |
$373.62 |
$336.59 |
| 72 | 804(A) 2915 |
STRUCTURAL CONCRETE | 13.08 | CY |
$465.00 |
$665.63 |
$729.73 |
$657.40 |
| 73 | 804(B) 2916 |
REINFORCING STEEL | 1,827.4 | LB |
$1.25 |
$1.65 |
$1.81 |
$1.63 |
| 74 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$2,000.00 |
$1,065.00 |
$1,926.48 |
$733.11 |
| 75 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 10 | EA |
$135.06 |
$62.39 |
$105.08 |
$125.68 |
| 76 | 806(A) 8736 |
POLE & 50' TS MST.ARM(G.STL.) | 2 | EA |
$7,800.00 |
$12,780.00 |
$14,010.77 |
$12,622.11 |
| 77 | 806(A) 8740 |
POLE & TWIN TS MST.ARM(G.STL.) | 2 | EA |
$7,700.00 |
$13,632.00 |
$14,944.83 |
$13,463.58 |
| 78 | 810(A) 3118 |
SERVICE POLE | 1 | EA |
$1,960.00 |
$788.10 |
$864.00 |
$778.36 |
| 79 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 100 | LF |
$1.60 |
$1.07 |
$1.17 |
$1.05 |
| 80 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 120 | LF |
$0.6500 |
$1.07 |
$1.17 |
$1.05 |
| 81 | 825 8550 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 1 | EA |
$30,000.00 |
$22,737.75 |
$24,927.49 |
$22,456.84 |
| 82 | 828(A) 8142 |
VEHICLE LOOP DETECTOR | 22 | EA |
$250.00 |
$165.08 |
$180.97 |
$163.04 |
| 83 | 828(B) 8136 |
LOOP DETECTOR WIRE | 5,250 | LF |
$4.20 |
$3.62 |
$3.97 |
$3.58 |
| 84 | 831 8231 |
1WAY 3SEC. ADJ. SIG. HD. S-6 | 8 | EA |
$515.00 |
$548.48 |
$601.30 |
$541.70 |
| 85 | 831 8252 |
1WAY 3SEC. ADJ. SIG. HD. S-9 | 2 | EA |
$525.00 |
$521.85 |
$572.11 |
$515.40 |
| 86 | 831 8262 |
1WAY 3SEC. ADJ. SIG. HD. S-10 | 1 | EA |
$525.00 |
$521.85 |
$572.11 |
$515.40 |
| 87 | 833 3030 |
BACKPLATE | 15 | EA |
$70.00 |
$97.98 |
$107.42 |
$96.77 |
| 88 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 450 | LF |
$1.45 |
$1.76 |
$1.93 |
$1.74 |
| 89 | 834(A) 8209 |
9/C TRAFFIC SIGNAL ELECTRICAL CABLE | 550 | LF |
$2.60 |
$3.35 |
$3.68 |
$3.31 |
| 90 | 834(B) 8220 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 350 | LF |
$1.00 |
$1.07 |
$1.17 |
$1.05 |
| 91 | 840(A) 8592 |
E.P.S. OPTICAL EMITTER | 6 | EA |
$970.00 |
$654.98 |
$718.05 |
$646.88 |
| 92 | 840(B) 8593 |
E.P.S. OPTICAL DETECTOR | 6 | EA |
$595.00 |
$420.68 |
$461.19 |
$415.48 |
| 93 | 840(C) 8594 |
E.P.S. OPTICAL DETECTOR CABLE | 1,865 | LF |
$1.00 |
$1.07 |
$1.17 |
$1.05 |
| 94 | 840(D) 8595 |
E.P.S. 2 CHANNEL PHASE SELECTOR | 2 | EA |
$2,000.00 |
$1,650.75 |
$1,809.73 |
$1,630.36 |
| 95 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 1,500 | SF |
$16.95 |
$11.72 |
$12.84 |
$11.52 |
| 96 | 850(C) 8118 |
MAST ARM MOUNTED SIGNS(ALUMINUM) | 39 | SF |
$40.00 |
$40.47 |
$44.37 |
$39.97 |
| 97 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 1,400 | LF |
$6.15 |
$6.39 |
$7.01 |
$6.28 |
| 98 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 250 | LF |
$12.50 |
$7.46 |
$8.17 |
$7.33 |
| 99 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 23,560 | LF |
$0.4000 |
$0.7100 |
$0.7800 |
$0.7000 |
| 100 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 7,900 | LF |
$0.5000 |
$1.07 |
$1.17 |
$1.05 |
| 101 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 700 | LF |
$1.30 |
$4.26 |
$4.67 |
$4.19 |
| 102 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 220 | LF |
$7.00 |
$7.99 |
$8.76 |
$7.86 |
| 103 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 28 | EA |
$143.00 |
$78.28 |
$85.82 |
$77.00 |
| 104 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$22,070.29 |
$33,567.48 |
$75,000.00 |
| 105 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$215,000.00 |
$250,000.00 |
$210,390.00 |
$199,000.00 |