| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$6,500.00 |
$3,622.50 |
$8,250.00 |
$5,000.00 |
$16,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$16,800.00 |
$35,000.00 |
$49,597.61 |
$29,747.30 |
$32,000.00 |
$30,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 605 | LF |
$2.00 |
$1.66 |
$1.28 |
$1.41 |
$1.50 |
$1.30 |
| 4 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$250.00 |
$300.00 |
$225.00 |
$247.50 |
$260.00 |
$225.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 91 | LF |
$8.00 |
$9.50 |
$8.12 |
$8.93 |
$9.00 |
$8.25 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 10,041 | SY |
$1.50 |
$1.47 |
$1.18 |
$1.30 |
$1.30 |
$1.40 |
| 7 | 230(F) 2812 |
WATERING | 803 | KGAL |
$6.50 |
$3.00 |
$2.48 |
$2.73 |
$2.80 |
$2.50 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.16 | AC |
$450.00 |
$200.00 |
$313.00 |
$344.30 |
$350.00 |
$315.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,187 | TON |
$30.00 |
$30.35 |
$31.00 |
$39.60 |
$33.00 |
$35.00 |
| 10 | 408 5774 |
PRIME COAT | 1,316 | GAL |
$5.00 |
$7.80 |
$6.00 |
$14.58 |
$6.00 |
$8.00 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$250.00 |
$300.00 |
$308.00 |
$275.00 |
$200.00 |
$250.00 |
| 12 | 611(G) 6006 |
INLET (SMD-TYPE 2B) | 1 | EA |
$3,000.00 |
$4,500.00 |
$2,455.00 |
$2,784.31 |
$5,000.00 |
$3,300.00 |
| 13 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 58 | LF |
$100.00 |
$125.00 |
$102.00 |
$110.00 |
$125.00 |
$125.00 |
| 14 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 114 | LF |
$25.00 |
$30.00 |
$22.00 |
$30.80 |
$40.00 |
$32.00 |
| 15 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 40 | LF |
$40.00 |
$26.00 |
$24.00 |
$44.00 |
$40.00 |
$32.00 |
| 16 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$300.00 |
$250.00 |
$162.00 |
$330.00 |
$300.00 |
$575.00 |
| 17 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$200.00 |
$250.00 |
$201.00 |
$220.00 |
$300.00 |
$475.00 |
| 18 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,200.00 |
$1,550.00 |
$1,718.00 |
$1,320.00 |
$1,400.00 |
$1,800.00 |
| 19 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$4,082.50 |
$6,050.00 |
$3,000.00 |
$15,000.00 |
| 20 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$20.00 |
$12.50 |
$19.00 |
$17.25 |
$25.00 |
$12.00 |
| 21 | 501(F) 6352 |
GRANULAR BACKFILL | 48 | CY |
$50.00 |
$72.25 |
$48.00 |
$74.57 |
$80.00 |
$100.00 |
| 22 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 256.6 | LF |
$70.00 |
$75.00 |
$105.00 |
$98.57 |
$75.00 |
$110.00 |
| 23 | 506(A) 1322 |
STRUCTURAL STEEL | 87,900 | LB |
$2.70 |
$2.02 |
$2.02 |
$2.02 |
$2.25 |
$2.20 |
| 24 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$700.00 |
$800.00 |
$287.00 |
$1,783.54 |
$360.00 |
$675.00 |
| 25 | 509(A) 1326 |
CLASS AA CONCRETE | 93.2 | CY |
$575.00 |
$635.00 |
$718.00 |
$596.19 |
$700.00 |
$750.00 |
| 26 | 509(B) 1328 |
CLASS A CONCRETE | 39.2 | CY |
$620.00 |
$667.50 |
$711.00 |
$616.50 |
$700.00 |
$850.00 |
| 27 | 511(A) 1332 |
REINFORCING STEEL | 24,320 | LB |
$1.00 |
$0.9500 |
$0.8000 |
$1.04 |
$1.05 |
$1.10 |
| 28 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 534 | LF |
$30.00 |
$29.40 |
$40.00 |
$39.87 |
$45.00 |
$52.00 |
| 29 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 534 | LF |
$10.00 |
$12.60 |
$9.00 |
$17.25 |
$11.00 |
$24.00 |
| 30 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 31 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,314 | TON |
$35.00 |
$40.28 |
$39.00 |
$45.73 |
$55.00 |
$50.00 |
| 32 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 418 | TON |
$30.00 |
$32.60 |
$29.00 |
$38.06 |
$42.00 |
$42.00 |
| 33 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$15.00 |
$30.00 |
$13.00 |
$28.75 |
$20.00 |
$20.00 |
| 34 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 180 | LF |
$15.00 |
$30.00 |
$13.00 |
$28.75 |
$20.00 |
$20.00 |
| 35 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$7,000.00 |
$10,867.50 |
$11,500.00 |
$13,000.00 |
$14,000.00 |
| 36 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,300.00 |
$1,425.00 |
$1,140.00 |
$1,782.50 |
$1,200.00 |
$1,900.00 |
| 37 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$2,262.50 |
$1,810.00 |
$2,259.75 |
$1,950.00 |
$2,400.00 |
| 38 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$3,340.00 |
$1,640.00 |
$1,886.00 |
$2,400.00 |
$3,000.00 |
| 39 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$11,000.00 |
$7,850.00 |
$5,530.00 |
$10,175.00 |
$9,000.00 |
$7,500.00 |
| 40 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,750.00 |
$1,500.00 |
$3,300.00 |
$2,500.00 |
$7,000.00 |
| 41 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$65,000.00 |
$32,500.00 |
$32,600.00 |
$59,700.26 |
$59,000.00 |
$17,000.00 |
| 42 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,330 | LF |
$5.00 |
$11.73 |
$10.20 |
$11.22 |
$10.20 |
$12.50 |