| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$20,000.00 |
$15,750.00 |
$23,760.00 |
$3,622.50 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$40,000.00 |
$65,000.00 |
$64,755.00 |
$52,920.00 |
$62,734.11 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 450 | LF |
$2.00 |
$1.70 |
$2.25 |
$2.43 |
$1.54 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 520 | LF |
$9.00 |
$8.00 |
$9.00 |
$10.53 |
$7.34 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 9,750 | SY |
$1.90 |
$1.45 |
$1.59 |
$1.89 |
$1.22 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.02 | AC |
$700.00 |
$500.00 |
$400.00 |
$1,350.00 |
$400.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 675 | CY |
$60.00 |
$90.00 |
$84.50 |
$82.08 |
$76.00 |
| 8 | 311(B) 0152 |
PROCESSING EXISTING BASE & SURFACE, METHOD B | 1,344.78 | LF |
$5.50 |
$10.00 |
$7.75 |
$10.53 |
$3.97 |
| 9 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 377 | TON |
$110.00 |
$125.00 |
$143.00 |
$118.80 |
$110.00 |
| 10 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 371 | TON |
$125.00 |
$130.00 |
$156.00 |
$129.60 |
$120.00 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$400.00 |
$425.00 |
$860.39 |
$485.00 |
| 12 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 142 | LF |
$35.00 |
$35.00 |
$33.00 |
$37.80 |
$36.00 |
| 13 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$1,100.00 |
$1,200.00 |
$1,650.00 |
$1,188.00 |
$3,000.00 |
| 14 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$13.50 |
$20.00 |
$15.00 |
$23.00 |
$31.00 |
| 15 | 501(G) 6309 |
CLSM BACKFILL | 82 | CY |
$150.00 |
$200.00 |
$212.50 |
$217.64 |
$260.00 |
| 16 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 597 | LF |
$200.00 |
$180.00 |
$217.64 |
$196.59 |
$209.00 |
| 17 | 504(C) 6250 |
SEALED EXPANSION JOINT | 34.4 | LF |
$265.00 |
$260.00 |
$320.00 |
$339.34 |
$396.00 |
| 18 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 368 | LF |
$75.00 |
$70.00 |
$91.00 |
$114.39 |
$120.00 |
| 19 | 506(A) 1322 |
STRUCTURAL STEEL | 1,630 | LB |
$2.75 |
$4.00 |
$3.00 |
$3.52 |
$3.00 |
| 20 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$850.00 |
$500.00 |
$900.00 |
$1,268.39 |
$747.00 |
| 21 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$850.00 |
$500.00 |
$900.00 |
$1,268.39 |
$747.00 |
| 22 | 509(A) 1326 |
CLASS AA CONCRETE | 130 | CY |
$570.00 |
$700.00 |
$785.00 |
$798.66 |
$1,007.00 |
| 23 | 509(B) 1328 |
CLASS A CONCRETE | 129.8 | CY |
$575.00 |
$700.00 |
$807.50 |
$796.85 |
$879.00 |
| 24 | 511(A) 1332 |
REINFORCING STEEL | 55,555 | LB |
$0.9000 |
$1.00 |
$1.00 |
$1.15 |
$0.8000 |
| 25 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 124 | LF |
$32.00 |
$30.00 |
$45.50 |
$49.08 |
$40.00 |
| 26 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 280 | LF |
$40.00 |
$35.00 |
$49.00 |
$59.54 |
$51.00 |
| 27 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 124 | LF |
$15.00 |
$15.00 |
$19.50 |
$17.25 |
$15.00 |
| 28 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 280 | LF |
$15.00 |
$15.00 |
$21.00 |
$17.25 |
$15.00 |
| 29 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 30 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 115 | LF |
$700.00 |
$750.00 |
$977.00 |
$1,158.05 |
$927.00 |
| 31 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 850 | TON |
$40.00 |
$50.00 |
$52.00 |
$46.00 |
$49.00 |
| 32 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 280 | TON |
$35.00 |
$41.00 |
$43.50 |
$40.25 |
$39.00 |
| 33 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$15,000.00 |
$14,250.00 |
$11,500.00 |
$9,660.00 |
| 34 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 13.5 | LF |
$25.00 |
$25.00 |
$45.00 |
$28.75 |
$22.00 |
| 35 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 1 | EA |
$1,500.00 |
$3,000.00 |
$3,042.00 |
$4,427.50 |
$2,340.00 |
| 36 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 3 | EA |
$2,200.00 |
$2,200.00 |
$3,181.25 |
$3,507.50 |
$2,545.00 |
| 37 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$7,500.00 |
$3,200.00 |
$4,750.00 |
$3,220.00 |
$2,920.00 |
| 38 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$10,500.00 |
$11,500.00 |
$10,260.00 |
$5,955.00 |
| 39 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$2,500.00 |
$6,000.00 |
$4,320.00 |
$2,000.00 |
| 40 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$60,000.00 |
$40,000.00 |
$51,500.00 |
$80,185.01 |
$189,300.00 |