Bid tab 140291

Let Sep 18, 2014 · Division 5 · Dewey Sign up free

‹ Sep 2014 results

BRIDGE AND APPROACHES COUNTY ROAD (EW-0765): OVER LONE CREEK 5.5 MILES NORTH AND 5.2 MILES WEST OF THE US -183/SH-47 JUNCTION. PROJECT LENGTH = 0.284 MILE

Let date
Thursday, September 18, 2014
Contract
140291
J/P numbers
28695(04)
District
Division 5
County
Dewey
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (EW-0765): OVER LONE CREEK 5.5 MILES NORTH AND 5.2 MILES WEST OF THE US -183/SH-47 JUNCTION. PROJECT LENGTH = 0.284 MILE
Project number
STP-222D(005)CI

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$875,729
1 SEWELL BROS., INC. Low bidder $948,242 +8.3%
2 K & R BUILDERS, INC. $1,079,039 +23.2% +13.8%
3 OBC, INC. $1,124,960 +28.5% +18.6%
4 Reece Construction Co, Inc. $1,175,484 +34.2% +24.0%

Bid tab: unit prices 40 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SEWELL BROS., I…#2 K & R BUILDERS,…#3 OBC, INC.#4 Reece Construct…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $20,000.00 $20,000.00 $15,750.00 $23,760.00 $3,622.50
2202(H) 0185 EARTHWORK1LSUM $40,000.00 $65,000.00 $64,755.00 $52,920.00 $62,734.11
3221(C) 2801 TEMPORARY SILT FENCE450LF $2.00 $1.70 $2.25 $2.43 $1.54
4221(F) 0100 TEMPORARY SILT DIKE520LF $9.00 $8.00 $9.00 $10.53 $7.34
5230(A) 2806 SOLID SLAB SODDING9,750SY $1.90 $1.45 $1.59 $1.89 $1.22
6233(A) 2817 VEGETATIVE MULCHING2.02AC $700.00 $500.00 $400.00 $1,350.00 $400.00
7303(A) 2100 AGGREGATE BASE TYPE A675CY $60.00 $90.00 $84.50 $82.08 $76.00
8311(B) 0152 PROCESSING EXISTING BASE & SURFACE, METHOD B1,344.78LF $5.50 $10.00 $7.75 $10.53 $3.97
9411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)377TON $110.00 $125.00 $143.00 $118.80 $110.00
10411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)371TON $125.00 $130.00 $156.00 $129.60 $120.00
11509(D) 0325 CLASS C CONCRETE10CY $350.00 $400.00 $425.00 $860.39 $485.00
12613(B) 4528 28" X 20" CORR. GALV. STEEL PIPE ARCH142LF $35.00 $35.00 $33.00 $37.80 $36.00
13613(M) 7187 TYPE B4 CULVERT END TREATMENT4EA $1,100.00 $1,200.00 $1,650.00 $1,188.00 $3,000.00
14501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON200CY $13.50 $20.00 $15.00 $23.00 $31.00
15501(G) 6309 CLSM BACKFILL82CY $150.00 $200.00 $212.50 $217.64 $260.00
16503(A) 1311 PRESTRESSED CONCRETE BEAMS (TYPE II)597LF $200.00 $180.00 $217.64 $196.59 $209.00
17504(C) 6250 SEALED EXPANSION JOINT34.4LF $265.00 $260.00 $320.00 $339.34 $396.00
18504(D) 6239 CONCRETE RAIL (TR3)368LF $75.00 $70.00 $91.00 $114.39 $120.00
19506(A) 1322 STRUCTURAL STEEL1,630LB $2.75 $4.00 $3.00 $3.52 $3.00
20507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY12EA $850.00 $500.00 $900.00 $1,268.39 $747.00
21507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY12EA $850.00 $500.00 $900.00 $1,268.39 $747.00
22509(A) 1326 CLASS AA CONCRETE130CY $570.00 $700.00 $785.00 $798.66 $1,007.00
23509(B) 1328 CLASS A CONCRETE129.8CY $575.00 $700.00 $807.50 $796.85 $879.00
24511(A) 1332 REINFORCING STEEL55,555LB $0.9000 $1.00 $1.00 $1.15 $0.8000
25514(A) 6010 PILES, FURNISHED (HP 10X42)124LF $32.00 $30.00 $45.50 $49.08 $40.00
26514(A) 6011 PILES, FURNISHED (HP 12X53)280LF $40.00 $35.00 $49.00 $59.54 $51.00
27514(B) 6292 PILES, DRIVEN (HP 10X42)124LF $15.00 $15.00 $19.50 $17.25 $15.00
28514(B) 6294 PILES, DRIVEN (HP 12X53)280LF $15.00 $15.00 $21.00 $17.25 $15.00
29514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00
30516(A) 6094 DRILLED SHAFTS 48" DIAMETER115LF $700.00 $750.00 $977.00 $1,158.05 $927.00
31601(B) 1353 TYPE I-A PLAIN RIPRAP850TON $40.00 $50.00 $52.00 $46.00 $49.00
32601(C) 1355 TYPE I-A FILTER BLANKET280TON $35.00 $41.00 $43.50 $40.25 $39.00
33619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $10,000.00 $15,000.00 $14,250.00 $11,500.00 $9,660.00
34623(A) 1418 BEAM GUARDRAIL W-BEAM SINGLE13.5LF $25.00 $25.00 $45.00 $28.75 $22.00
35623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)1EA $1,500.00 $3,000.00 $3,042.00 $4,427.50 $2,340.00
36623(F) 6033 GUARDRAIL ANCHOR UNIT (TYPE II)3EA $2,200.00 $2,200.00 $3,181.25 $3,507.50 $2,545.00
37880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $7,500.00 $3,200.00 $4,750.00 $3,220.00 $2,920.00
38642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $7,500.00 $10,500.00 $11,500.00 $10,260.00 $5,955.00
39220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $7,500.00 $2,500.00 $6,000.00 $4,320.00 $2,000.00
40641 1399 MOBILIZATION1LSUM $60,000.00 $40,000.00 $51,500.00 $80,185.01 $189,300.00