| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$10,500.00 |
$9,250.00 |
$10,000.00 |
$25,000.00 |
$30,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,420 | CY |
$8.00 |
$8.50 |
$14.25 |
$7.00 |
$16.00 |
$15.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 5,965 | CY |
$12.50 |
$7.75 |
$9.95 |
$10.00 |
$9.00 |
$25.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,750 | LF |
$3.50 |
$3.00 |
$1.75 |
$4.00 |
$2.50 |
$2.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 250 | LF |
$8.00 |
$10.00 |
$9.90 |
$8.00 |
$10.00 |
$10.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 9,960 | SY |
$2.10 |
$2.50 |
$1.70 |
$3.00 |
$2.50 |
$4.00 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.06 | AC |
$600.00 |
$400.00 |
$200.00 |
$350.00 |
$400.00 |
$1,500.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,428 | TON |
$32.00 |
$32.00 |
$26.83 |
$35.00 |
$45.00 |
$55.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$275.00 |
$250.00 |
$272.50 |
$300.00 |
$250.00 |
$400.00 |
| 10 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 140 | LF |
$32.00 |
$39.00 |
$31.00 |
$35.00 |
$80.00 |
$80.00 |
| 11 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 8 | EA |
$400.00 |
$450.00 |
$250.00 |
$300.00 |
$350.00 |
$2,000.00 |
| 12 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,200.00 |
$2,150.00 |
$2,010.00 |
$1,800.00 |
$1,600.00 |
$1,800.00 |
| 13 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$2,350.00 |
$1,890.00 |
$2,000.00 |
$2,800.00 |
$3,200.00 |
| 14 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$17.50 |
$12.00 |
$12.00 |
$12.00 |
$35.00 |
$25.00 |
| 15 | 501(F) 6352 |
GRANULAR BACKFILL | 46 | CY |
$65.00 |
$60.00 |
$75.00 |
$65.00 |
$60.00 |
$100.00 |
| 16 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 179 | LF |
$230.00 |
$215.00 |
$250.00 |
$197.00 |
$250.00 |
$230.00 |
| 17 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$190.00 |
$150.00 |
$232.50 |
$175.00 |
$150.00 |
$180.00 |
| 18 | 504(B) 1305 |
SAW-CUT GROOVING | 236.7 | SY |
$10.00 |
$14.00 |
$11.40 |
$12.00 |
$14.00 |
$15.00 |
| 19 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 172.6 | LF |
$75.00 |
$75.00 |
$82.50 |
$85.00 |
$135.00 |
$95.00 |
| 20 | 506(A) 1322 |
STRUCTURAL STEEL | 320 | LB |
$4.00 |
$4.00 |
$3.50 |
$5.00 |
$4.00 |
$3.00 |
| 21 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$750.00 |
$700.00 |
$650.00 |
$600.00 |
$1,400.00 |
$1,200.00 |
| 22 | 509(A) 1326 |
CLASS AA CONCRETE | 63.1 | CY |
$525.00 |
$650.00 |
$675.00 |
$800.00 |
$1,000.00 |
$550.00 |
| 23 | 509(B) 1328 |
CLASS A CONCRETE | 37 | CY |
$525.00 |
$600.00 |
$735.00 |
$850.00 |
$980.00 |
$600.00 |
| 24 | 511(A) 1332 |
REINFORCING STEEL | 16,950 | LB |
$0.9500 |
$1.20 |
$1.00 |
$1.10 |
$1.20 |
$1.20 |
| 25 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 170 | LF |
$32.50 |
$45.00 |
$70.00 |
$60.00 |
$64.00 |
$35.00 |
| 26 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 170 | LF |
$18.00 |
$25.00 |
$30.00 |
$12.00 |
$125.00 |
$45.00 |
| 27 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 28 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 825 | TON |
$38.00 |
$35.00 |
$39.10 |
$45.00 |
$45.00 |
$60.00 |
| 29 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 245 | TON |
$35.00 |
$30.00 |
$31.05 |
$35.00 |
$30.00 |
$40.00 |
| 30 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$25.00 |
$60.00 |
$35.00 |
$25.00 |
$20.00 |
$20.00 |
| 31 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$25.00 |
$10.00 |
$45.00 |
$25.00 |
$18.00 |
$20.00 |
| 32 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$15,000.00 |
$7,375.00 |
$10,000.00 |
$18,000.00 |
$25,000.00 |
| 33 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,000.00 |
$3,800.00 |
$3,000.00 |
$3,500.00 |
$4,000.00 |
$5,000.00 |
| 34 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$6,000.00 |
$7,000.00 |
$7,000.00 |
$3,500.00 |
$6,356.00 |
$5,000.00 |
| 35 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$2,500.00 |
$4,050.00 |
$3,500.00 |
$4,000.00 |
$3,500.00 |
| 36 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$35,000.00 |
$25,000.00 |
$36,450.00 |
$20,000.00 |
$55,000.20 |
$46,000.00 |