| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$24,000.00 |
$16,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 9,077 | CY |
$8.00 |
$7.50 |
$6.75 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 1,300 | CY |
$18.00 |
$12.00 |
$14.07 |
| 4 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,352 | CY |
$10.00 |
$10.00 |
$8.73 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$18,000.00 |
$4,400.29 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 858 | LF |
$3.00 |
$3.00 |
$10.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$7.00 |
$10.00 |
$15.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 8,075 | SY |
$2.00 |
$2.00 |
$1.85 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,564 | TON |
$24.00 |
$27.00 |
$20.00 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$300.00 |
$200.00 |
$350.00 |
| 11 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 580 | TON |
$35.00 |
$43.00 |
$33.50 |
| 12 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 193 | TON |
$25.00 |
$34.00 |
$23.00 |
| 13 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 30 | LF |
$45.00 |
$38.00 |
$20.50 |
| 14 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 138 | LF |
$50.00 |
$42.00 |
$28.75 |
| 15 | 613(B) 0693 |
42" CORR. GALV. STEEL PIPE | 54 | LF |
$50.00 |
$64.00 |
$47.00 |
| 16 | 613(P) 0761 |
24" GALV. STEEL CULVERT END SECTION ROUND | 6 | EA |
$500.00 |
$300.00 |
$200.00 |
| 17 | 613(P) 0764 |
42" GALV. STEEL CULVERT END SECTION ROUND | 2 | EA |
$900.00 |
$1,000.00 |
$700.00 |
| 18 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 87 | CY |
$30.00 |
$46.00 |
$60.00 |
| 19 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$17.00 |
$18.00 |
$16.50 |
| 20 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,700.00 |
$2,300.00 |
$1,450.00 |
| 21 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,300.00 |
$1,600.00 |
$2,100.00 |
| 22 | 624(A) 4281 |
FENCE-STYLE WWF | 410 | LF |
$7.00 |
$11.00 |
$10.00 |
| 23 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 1 | EA |
$250.00 |
$1,100.00 |
$1,000.00 |
| 24 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 10.18 | SF |
$20.00 |
$15.00 |
$14.00 |
| 25 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 24 | LF |
$15.00 |
$16.00 |
$8.00 |
| 26 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,000.00 |
$4,000.00 |
$2,503.93 |
| 27 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 208 | CY |
$20.00 |
$22.00 |
$40.00 |
| 28 | 501(C) 1308 |
SUBSTRUCTURE EXCAVATION ROCK | 12 | CY |
$100.00 |
$70.00 |
$1,000.00 |
| 29 | 501(F) 6352 |
GRANULAR BACKFILL | 66 | CY |
$75.00 |
$65.00 |
$100.00 |
| 30 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 358 | LF |
$200.00 |
$220.00 |
$250.00 |
| 31 | 504(C) 6250 |
SEALED EXPANSION JOINT | 29.17 | LF |
$270.00 |
$240.00 |
$450.00 |
| 32 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 295.67 | LF |
$68.00 |
$75.00 |
$65.00 |
| 33 | 506(A) 1322 |
STRUCTURAL STEEL | 780 | LB |
$3.50 |
$3.00 |
$3.50 |
| 34 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$2,000.00 |
$825.00 |
$1,100.00 |
| 35 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 6 | EA |
$2,100.00 |
$825.00 |
$1,100.00 |
| 36 | 509(A) 1326 |
CLASS AA CONCRETE | 93.6 | CY |
$550.00 |
$650.00 |
$800.00 |
| 37 | 509(B) 1328 |
CLASS A CONCRETE | 85.2 | CY |
$570.00 |
$675.00 |
$800.00 |
| 38 | 511(A) 1332 |
REINFORCING STEEL | 33,628.5 | LB |
$1.10 |
$1.10 |
$1.20 |
| 39 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 2,751.2 | LB |
$1.25 |
$1.50 |
$1.50 |
| 40 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 78 | LF |
$33.00 |
$37.00 |
$37.50 |
| 41 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 165 | LF |
$37.00 |
$46.00 |
$50.75 |
| 42 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 78 | LF |
$17.00 |
$13.00 |
$43.50 |
| 43 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 165 | LF |
$17.00 |
$14.00 |
$51.50 |
| 44 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 45 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 608.2 | TON |
$35.00 |
$45.00 |
$34.50 |
| 46 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 297.7 | TON |
$25.00 |
$34.00 |
$31.00 |
| 47 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$24.00 |
$12.00 |
$40.00 |
| 48 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$20.00 |
$12.00 |
$40.00 |
| 49 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$13,000.00 |
$12,000.00 |
$20,000.00 |
| 50 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$9,000.00 |
| 51 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,700.00 |
$6,000.00 |
| 52 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$52,000.00 |
$51,000.00 |
$75,000.00 |