| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$13,000.00 |
$11,250.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,570 | CY |
$7.50 |
$8.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 772 | CY |
$11.00 |
$17.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$14,000.00 |
$7,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 225 | LF |
$2.75 |
$4.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 160 | LF |
$9.00 |
$12.00 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 2 | CY |
$125.00 |
$750.00 |
| 8 | 227 0300 |
(SP)TURF REINFORCEMENT MAT | 2,264 | SY |
$5.00 |
$58.80 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 4,374 | SY |
$2.50 |
$2.39 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,504 | CY |
$41.00 |
$48.04 |
| 11 | 325 5271 |
SEPARATOR FABRIC | 2,640 | SY |
$2.00 |
$2.11 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 26 | TON |
$31.00 |
$60.00 |
| 13 | 408 5774 |
PRIME COAT | 588.6 | GAL |
$6.25 |
$8.60 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 529.6 | TON |
$85.50 |
$74.47 |
| 15 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 231.3 | TON |
$109.00 |
$108.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 67 | TON |
$117.50 |
$135.78 |
| 17 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 158 | LF |
$32.00 |
$25.00 |
| 18 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 8 | EA |
$950.00 |
$1,125.00 |
| 19 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$8,000.00 |
$5,250.00 |
| 20 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,318.7 | SY |
$5.50 |
$6.00 |
| 21 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 34 | LF |
$6.00 |
$14.00 |
| 22 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 712.5 | LF |
$16.00 |
$18.00 |
| 23 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$2,640.00 |
| 24 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,150.85 |
$2,280.00 |
| 25 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 250 | CY |
$15.00 |
$9.00 |
| 26 | 501(F) 6352 |
GRANULAR BACKFILL | 126 | CY |
$48.00 |
$59.47 |
| 27 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 418.67 | LF |
$215.00 |
$200.00 |
| 28 | 504(A) 1304 |
APPROACH SLAB | 194 | SY |
$169.00 |
$216.00 |
| 29 | 504(B) 1305 |
SAW-CUT GROOVING | 339.4 | SY |
$6.75 |
$6.37 |
| 30 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 291.3 | LF |
$70.00 |
$74.00 |
| 31 | 506(A) 1322 |
STRUCTURAL STEEL | 870 | LB |
$3.25 |
$3.00 |
| 32 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$1,100.00 |
$800.00 |
| 33 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$1,000.00 |
$800.00 |
| 34 | 509(A) 1326 |
CLASS AA CONCRETE | 107 | CY |
$510.00 |
$599.00 |
| 35 | 509(B) 1328 |
CLASS A CONCRETE | 91 | CY |
$503.00 |
$627.50 |
| 36 | 511(A) 1332 |
REINFORCING STEEL | 38,910 | LB |
$0.9100 |
$0.9000 |
| 37 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 129 | LF |
$31.00 |
$36.40 |
| 38 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 469 | LF |
$38.00 |
$36.40 |
| 39 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 129 | LF |
$13.50 |
$15.60 |
| 40 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 469 | LF |
$14.00 |
$15.60 |
| 41 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 72 | LF |
$25.50 |
$35.00 |
| 42 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 90 | LF |
$19.00 |
$30.00 |
| 43 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$35,000.00 |
$35,000.00 |
| 44 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,400.00 |
$1,530.00 |
| 45 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$13,000.00 |
$11,500.00 |
| 46 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$62,000.00 |
$45,000.00 |