| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$9,000.00 |
$6,600.00 |
$7,000.00 |
$40,000.00 |
$6,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$50,000.00 |
$86,979.00 |
$96,800.00 |
$100,000.00 |
$50,000.00 |
$88,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,600 | LF |
$2.50 |
$1.55 |
$1.71 |
$2.00 |
$2.00 |
$1.55 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 300 | LF |
$6.00 |
$8.00 |
$8.80 |
$11.00 |
$10.00 |
$8.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 10,775 | SY |
$2.50 |
$1.55 |
$1.49 |
$2.00 |
$2.00 |
$1.35 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.8 | AC |
$500.00 |
$200.00 |
$385.00 |
$900.00 |
$1,000.00 |
$350.00 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,271 | TON |
$30.00 |
$22.72 |
$23.10 |
$23.00 |
$40.00 |
$21.00 |
| 8 | 408 5774 |
PRIME COAT | 837 | GAL |
$4.50 |
$8.00 |
$6.60 |
$8.00 |
$10.00 |
$6.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$270.00 |
$353.13 |
$450.00 |
$400.00 |
$382.00 |
| 10 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 441 | TON |
$40.00 |
$36.98 |
$37.40 |
$38.00 |
$50.00 |
$34.00 |
| 11 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 50 | LF |
$30.00 |
$28.00 |
$28.60 |
$29.00 |
$100.00 |
$26.00 |
| 12 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 28 | LF |
$30.00 |
$38.00 |
$30.80 |
$31.00 |
$100.00 |
$28.00 |
| 13 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$300.00 |
$400.00 |
$192.50 |
$195.00 |
$2,000.00 |
$175.00 |
| 14 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$300.00 |
$360.00 |
$220.00 |
$222.00 |
$2,000.00 |
$200.00 |
| 15 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 230 | CY |
$15.00 |
$8.00 |
$33.60 |
$14.00 |
$10.00 |
$22.00 |
| 16 | 501(F) 6352 |
GRANULAR BACKFILL | 138 | CY |
$50.00 |
$67.50 |
$84.31 |
$70.00 |
$100.00 |
$73.00 |
| 17 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 404 | LF |
$300.00 |
$394.00 |
$328.03 |
$360.00 |
$300.00 |
$460.00 |
| 18 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 364.5 | LF |
$60.00 |
$73.00 |
$90.68 |
$75.00 |
$75.00 |
$103.00 |
| 19 | 506(A) 1322 |
STRUCTURAL STEEL | 1,100 | LB |
$3.00 |
$3.00 |
$2.86 |
$3.50 |
$10.00 |
$4.00 |
| 20 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$750.00 |
$900.00 |
$1,243.72 |
$1,220.00 |
$1,500.00 |
$1,142.00 |
| 21 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$800.00 |
$900.00 |
$1,243.72 |
$1,220.00 |
$1,500.00 |
$1,142.00 |
| 22 | 509(A) 1326 |
CLASS AA CONCRETE | 120.4 | CY |
$550.00 |
$585.00 |
$579.26 |
$555.00 |
$750.00 |
$1,060.00 |
| 23 | 509(B) 1328 |
CLASS A CONCRETE | 93.6 | CY |
$450.00 |
$620.00 |
$592.98 |
$555.00 |
$700.00 |
$709.00 |
| 24 | 511(A) 1332 |
REINFORCING STEEL | 42,580 | LB |
$0.9500 |
$0.8800 |
$1.03 |
$1.00 |
$1.50 |
$0.8000 |
| 25 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 140 | LF |
$30.00 |
$31.50 |
$33.17 |
$40.00 |
$35.00 |
$44.00 |
| 26 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 410 | LF |
$35.00 |
$34.30 |
$40.54 |
$48.00 |
$35.00 |
$58.00 |
| 27 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 140 | LF |
$12.00 |
$13.50 |
$16.80 |
$17.00 |
$35.00 |
$12.00 |
| 28 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 410 | LF |
$14.00 |
$14.70 |
$16.80 |
$17.00 |
$35.00 |
$12.00 |
| 29 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 3,210 | TON |
$35.00 |
$33.39 |
$33.48 |
$35.00 |
$50.00 |
$34.00 |
| 30 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 910 | TON |
$30.00 |
$25.97 |
$25.73 |
$26.00 |
$35.00 |
$28.00 |
| 31 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$20.00 |
$30.00 |
$19.54 |
$45.00 |
$10.00 |
$19.00 |
| 32 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$20.00 |
$30.00 |
$19.54 |
$10.00 |
$10.00 |
$19.00 |
| 33 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 200 | LF |
$18.00 |
$17.60 |
$18.48 |
$19.00 |
$20.00 |
$16.00 |
| 34 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,500.00 |
$1,400.00 |
$1,652.00 |
$1,700.00 |
$800.00 |
$550.00 |
| 35 | 623(F) 6030 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 4 | EA |
$3,000.00 |
$660.00 |
$504.00 |
$520.00 |
$1,500.00 |
$1,200.00 |
| 36 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$1,932.00 |
$2,000.00 |
$5,000.00 |
$1,725.00 |
| 37 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$7,800.00 |
$8,250.00 |
$8,000.00 |
$5,000.00 |
$10,600.00 |
| 38 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,800.00 |
$3,300.00 |
$2,500.00 |
$3,000.00 |
$2,500.00 |
| 39 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$48,000.00 |
$31,150.00 |
$45,643.83 |
$40,000.00 |
$50,000.00 |
$144,200.00 |