| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$9,000.00 |
$14,170.00 |
$10,000.00 |
$10,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,530 | CY |
$4.00 |
$6.00 |
$7.50 |
$4.25 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 5,240 | CY |
$5.00 |
$7.00 |
$9.65 |
$12.25 |
$10.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$12,227.78 |
$3,500.00 |
$8,000.00 |
$10,000.00 |
$5,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,293 | LF |
$3.00 |
$3.00 |
$1.60 |
$1.39 |
$1.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 182 | LF |
$8.00 |
$6.00 |
$10.00 |
$8.66 |
$10.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 17,608 | SY |
$1.00 |
$2.00 |
$1.72 |
$1.54 |
$2.00 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.64 | AC |
$500.00 |
$350.00 |
$537.50 |
$644.00 |
$1,000.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,062 | TON |
$30.00 |
$28.00 |
$26.57 |
$25.00 |
$30.00 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$250.00 |
$300.00 |
$275.00 |
$275.00 |
$300.00 |
| 11 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 54 | LF |
$50.00 |
$50.00 |
$47.00 |
$50.00 |
$75.00 |
| 12 | 613(P) 4573 |
42" X 29" GALV. STEEL CULVERT END SECTION ARCH | 2 | EA |
$500.00 |
$500.00 |
$532.00 |
$500.00 |
$600.00 |
| 13 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,059 | LF |
$4.00 |
$5.00 |
$4.70 |
$5.00 |
$9.00 |
| 14 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 1 | EA |
$500.00 |
$150.00 |
$896.00 |
$700.00 |
$2,500.00 |
| 15 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 84 | CY |
$25.00 |
$12.00 |
$10.50 |
$35.00 |
$20.00 |
| 16 | 501(G) 6309 |
CLSM BACKFILL | 82 | CY |
$100.00 |
$140.00 |
$170.00 |
$175.00 |
$150.00 |
| 17 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 416.67 | LF |
$200.00 |
$205.00 |
$186.75 |
$232.00 |
$225.00 |
| 18 | 504(B) 1305 |
SAW-CUT GROOVING | 319.6 | SY |
$4.50 |
$7.00 |
$7.00 |
$6.25 |
$7.00 |
| 19 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 275 | LF |
$75.00 |
$75.00 |
$73.00 |
$95.00 |
$90.00 |
| 20 | 506(A) 1322 |
STRUCTURAL STEEL | 1,810 | LB |
$3.50 |
$2.50 |
$2.70 |
$2.25 |
$5.00 |
| 21 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$750.00 |
$750.00 |
$800.00 |
$500.00 |
$1,000.00 |
| 22 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$750.00 |
$750.00 |
$800.00 |
$500.00 |
$1,000.00 |
| 23 | 509(A) 1326 |
CLASS AA CONCRETE | 80.6 | CY |
$450.00 |
$600.00 |
$585.00 |
$650.00 |
$600.00 |
| 24 | 509(B) 1328 |
CLASS A CONCRETE | 60.1 | CY |
$400.00 |
$650.00 |
$615.00 |
$650.00 |
$600.00 |
| 25 | 511(A) 1332 |
REINFORCING STEEL | 26,558 | LB |
$1.00 |
$1.00 |
$0.9000 |
$1.00 |
$1.00 |
| 26 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 80 | LF |
$30.00 |
$35.00 |
$39.55 |
$30.00 |
$30.00 |
| 27 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 882 | LF |
$35.00 |
$40.00 |
$33.25 |
$32.00 |
$35.00 |
| 28 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 80 | LF |
$15.00 |
$10.00 |
$16.95 |
$16.00 |
$40.00 |
| 29 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 882 | LF |
$15.00 |
$10.00 |
$14.25 |
$14.00 |
$40.00 |
| 30 | 601(D) 1357 |
TYPE II SPECIAL PLAIN RIPRAP | 1,610 | TON |
$30.00 |
$35.00 |
$36.28 |
$32.00 |
$40.00 |
| 31 | 602(C) 4205 |
FILTER FABRIC | 1,000 | SY |
$7.00 |
$2.00 |
$3.00 |
$2.00 |
$35.00 |
| 32 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$2,500.00 |
$5,000.00 |
$4,850.00 |
$7,500.00 |
$20,000.00 |
| 33 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 3 | EA |
$2,200.00 |
$2,200.00 |
$2,465.00 |
$2,000.00 |
$2,500.00 |
| 34 | 623(F) 6034 |
GUARDRAIL ANCHOR UNIT (TYPE III) | 1 | EA |
$2,000.00 |
$1,950.00 |
$1,905.00 |
$1,700.00 |
$2,500.00 |
| 35 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 17 | SF |
$18.00 |
$18.00 |
$15.68 |
$14.00 |
$25.00 |
| 36 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 34 | LF |
$14.00 |
$20.00 |
$8.96 |
$8.00 |
$25.00 |
| 37 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 16 | EA |
$20.00 |
$30.00 |
$20.16 |
$18.00 |
$50.00 |
| 38 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,000.00 |
$3,500.00 |
$2,300.00 |
$1,800.00 |
$3,500.00 |
| 39 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$6,000.00 |
$5,000.00 |
$9,400.00 |
$2,500.00 |
$5,000.00 |
| 40 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,500.00 |
$2,800.00 |
$2,500.00 |
$3,000.00 |
| 41 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$47,000.00 |
$10,000.00 |
$35,925.00 |
$50,000.00 |
$35,000.00 |