| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 729 | CY |
$8.00 |
$10.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,017 | CY |
$10.00 |
$20.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,650 | LF |
$2.00 |
$1.23 |
| 4 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 22 | EA |
$275.00 |
$300.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,610 | LF |
$8.50 |
$7.33 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 5,000 | SY |
$1.50 |
$1.58 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 13 | AC |
$350.00 |
$423.00 |
| 8 | 241 2832 |
MOWING | 176 | AC |
$100.00 |
$88.00 |
| 9 | 310(B) 0149 |
SUBGRADE, METHOD B | 862 | SY |
$2.00 |
$1.75 |
| 10 | 407(B) 0250 |
TACK COAT | 23,838 | GAL |
$2.90 |
$3.00 |
| 11 | 408 5774 |
PRIME COAT | 3,247 | GAL |
$4.50 |
$5.50 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,461 | TON |
$66.00 |
$61.50 |
| 13 | 411(B) 5950 |
(SP) SUPERPAVE, TYPE S3(PG 76-28 E) | 12,477 | TON |
$72.00 |
$85.00 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,679 | TON |
$75.00 |
$63.25 |
| 15 | 411(D) 5980 |
(SP) SUPERPAVE, TYPE S5(PG 76-28 E) | 6,680 | TON |
$80.00 |
$88.20 |
| 16 | 411(J) 6410 |
(SP) RICH INTERMEDIATE LAYER | 6,061 | TON |
$90.00 |
$100.00 |
| 17 | 412 5267 |
COLD MILLING PAVEMENT | 137,083 | SY |
$2.00 |
$2.75 |
| 18 | 509(B) 0321 |
CLASS A CONCRETE | 36 | CY |
$350.00 |
$950.00 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 397 | CY |
$250.00 |
$260.00 |
| 20 | 511(A) 0332 |
REINFORCING STEEL | 3,749 | LB |
$1.00 |
$1.50 |
| 21 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 4 | LF |
$55.00 |
$80.00 |
| 22 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 98 | LF |
$85.00 |
$171.40 |
| 23 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 1,468 | LF |
$28.00 |
$30.00 |
| 24 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 60 | LF |
$35.00 |
$36.45 |
| 25 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$680.00 |
$1,800.00 |
| 26 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 24 | EA |
$900.00 |
$1,100.00 |
| 27 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 3 | EA |
$1,800.00 |
$1,225.00 |
| 28 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 25 | EA |
$1,000.00 |
$1,150.00 |
| 29 | 613(M) 7202 |
TYPE BB6 CULVERT END TREATMENT | 3 | EA |
$2,000.00 |
$1,350.00 |
| 30 | 613(W) 4508 |
48" JACKED CONDUIT | 75 | LF |
$150.00 |
$300.00 |
| 31 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$5,000.00 |
| 32 | 619(B) 0291 |
REMOVAL OF HEADWALL | 8 | EA |
$800.00 |
$1,000.00 |
| 33 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 4,323 | LF |
$3.00 |
$1.25 |
| 34 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 4,075 | LF |
$15.00 |
$15.00 |
| 35 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 10 | EA |
$800.00 |
$875.00 |
| 36 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 8 | EA |
$2,300.00 |
$2,050.00 |
| 37 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 4 | EA |
$60.00 |
$65.00 |
| 38 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 2 | EA |
$125.00 |
$100.00 |
| 39 | 629(C) 4960 |
MAILBOX | 9 | EA |
$50.00 |
$25.00 |
| 40 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 6 | EA |
$3.00 |
$10.00 |
| 41 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 97 | EA |
$10.00 |
$9.50 |
| 42 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 33,500 | LF |
$0.1500 |
$0.1000 |
| 43 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 2,792 | EA |
$0.8000 |
$0.5000 |
| 44 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 72,770 | LF |
$0.1700 |
$0.0300 |
| 45 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 90 | SD |
$20.00 |
$75.00 |
| 46 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 90 | SD |
$8.50 |
$2.00 |
| 47 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,350 | SD |
$0.5000 |
$0.1000 |
| 48 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 360 | SD |
$1.00 |
$2.00 |
| 49 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 900 | SD |
$1.25 |
$2.00 |
| 50 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,080 | SD |
$0.4500 |
$0.1000 |
| 51 | 880(C) 8848 |
WING BARRICADES | 630 | SD |
$1.10 |
$0.1000 |
| 52 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,440 | SD |
$0.1500 |
$0.6500 |
| 53 | 880(F) 8878 |
DRUMS | 1,350 | SD |
$0.1500 |
$0.7500 |
| 54 | 880(G) 8890 |
CHANNELIZER CONES | 1,980 | SD |
$0.1000 |
$0.7500 |
| 55 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 200 | HOUR |
$65.00 |
$90.00 |
| 56 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 180 | SD |
$16.00 |
$10.00 |
| 57 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$2,646.33 |
$500.00 |
| 58 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 375.16 | SF |
$16.00 |
$11.00 |
| 59 | 851(C) 8324 |
2" SQUARE TUBE POST | 771.5 | LF |
$6.50 |
$5.00 |
| 60 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 72,770 | LF |
$0.5000 |
$0.3800 |
| 61 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$18,000.00 |
$25,000.00 |
| 62 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$190,000.00 |
$190,000.00 |