| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$1,500.00 |
$6,200.00 |
$15,000.00 |
$50,000.00 |
$4,917.99 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 358 | CY |
$7.00 |
$11.50 |
$25.00 |
$30.00 |
$7.74 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$1,000.00 |
$1,200.00 |
$4,000.00 |
$5,000.00 |
$1,004.19 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,775 | LF |
$2.50 |
$2.00 |
$2.00 |
$3.50 |
$2.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 28 | LF |
$7.00 |
$7.50 |
$10.00 |
$20.00 |
$21.51 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 1,008 | SY |
$2.00 |
$5.25 |
$5.00 |
$5.00 |
$7.94 |
| 7 | 232(B) 2814 |
SEEDING METHOD B | 0.42 | AC |
$500.00 |
$4,000.00 |
$4,500.00 |
$4,000.00 |
$1,958.00 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.21 | AC |
$400.00 |
$4,300.00 |
$5,000.00 |
$4,500.00 |
$1,595.00 |
| 9 | 241 2832 |
MOWING | 0.42 | AC |
$200.00 |
$3,000.00 |
$1,000.00 |
$3,000.00 |
$292.60 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 103 | CY |
$45.00 |
$35.00 |
$65.00 |
$70.00 |
$56.65 |
| 11 | 310(B) 0149 |
SUBGRADE, METHOD B | 505 | SY |
$3.00 |
$13.50 |
$1.00 |
$8.00 |
$9.50 |
| 12 | 325 5271 |
SEPARATOR FABRIC | 543 | SY |
$1.50 |
$2.25 |
$2.00 |
$5.00 |
$4.40 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 705.2 | TON |
$35.00 |
$20.00 |
$30.00 |
$35.00 |
$41.80 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 428 | TON |
$80.00 |
$95.00 |
$80.00 |
$80.00 |
$100.30 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 256 | TON |
$85.00 |
$110.00 |
$100.00 |
$90.00 |
$114.47 |
| 16 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 382 | SY |
$25.00 |
$32.00 |
$30.00 |
$35.00 |
$33.45 |
| 17 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 267 | SY |
$20.00 |
$47.00 |
$45.00 |
$40.00 |
$48.77 |
| 18 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 96 | CY |
$175.00 |
$125.00 |
$120.00 |
$250.00 |
$127.40 |
| 19 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$1,500.00 |
$8,000.00 |
$10,000.00 |
$7,500.00 |
$5,500.00 |
| 20 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 118 | SY |
$4.00 |
$20.00 |
$10.00 |
$14.00 |
$70.40 |
| 21 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 382 | SY |
$15.00 |
$14.50 |
$10.00 |
$25.00 |
$4.81 |
| 22 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 152 | LF |
$3.00 |
$3.85 |
$3.00 |
$4.00 |
$5.50 |
| 23 | 619(C) 0924 |
SAWING PAVEMENT | 1,135 | LF |
$3.00 |
$3.75 |
$3.00 |
$6.00 |
$5.50 |
| 24 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$600.00 |
$1,100.00 |
$2,000.00 |
$750.00 |
$1,320.00 |
| 25 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 625 | LF |
$20.00 |
$16.00 |
$15.00 |
$15.00 |
$17.05 |
| 26 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$2,250.00 |
$2,200.00 |
$2,000.00 |
$2,040.50 |
| 27 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,750.00 |
$1,750.00 |
$2,000.00 |
$1,800.00 |
$1,430.00 |
| 28 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 34 | CY |
$25.00 |
$17.50 |
$25.00 |
$25.00 |
$115.00 |
| 29 | 501(G) 6309 |
CLSM BACKFILL | 314 | CY |
$120.00 |
$125.00 |
$80.00 |
$150.00 |
$148.49 |
| 30 | 502(A) 6173 |
ENGINEERED FALSEWORK | 1 | LSUM |
$500,000.00 |
$550,000.00 |
$875,000.00 |
$550,000.00 |
$771,651.15 |
| 31 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 1,028.7 | LF |
$275.00 |
$335.00 |
$325.00 |
$475.00 |
$345.84 |
| 32 | 504(A) 1304 |
APPROACH SLAB | 353.2 | SY |
$185.00 |
$170.00 |
$185.00 |
$200.00 |
$247.42 |
| 33 | 504(B) 1305 |
SAW-CUT GROOVING | 1,484.2 | SY |
$5.00 |
$3.80 |
$4.00 |
$4.00 |
$4.14 |
| 34 | 504(C) 6250 |
SEALED EXPANSION JOINT | 89.8 | LF |
$250.00 |
$227.50 |
$265.00 |
$350.00 |
$349.37 |
| 35 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 668.1 | LF |
$75.00 |
$75.00 |
$75.00 |
$100.00 |
$97.21 |
| 36 | 506(A) 1322 |
STRUCTURAL STEEL | 4,567 | LB |
$4.00 |
$2.00 |
$1.50 |
$3.50 |
$3.98 |
| 37 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$3,500.00 |
$3,600.00 |
$3,850.00 |
$5,000.00 |
$4,623.58 |
| 38 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$3,500.00 |
$3,600.00 |
$3,850.00 |
$5,000.00 |
$4,623.58 |
| 39 | 509 6152 |
SPECIAL CONCRETE FINISH | 246 | SY |
$35.00 |
$72.50 |
$90.00 |
$50.00 |
$267.38 |
| 40 | 509(A) 1326 |
CLASS AA CONCRETE | 433 | CY |
$500.00 |
$400.00 |
$300.00 |
$800.00 |
$561.80 |
| 41 | 509(B) 1328 |
CLASS A CONCRETE | 489 | CY |
$500.00 |
$500.00 |
$600.00 |
$700.00 |
$523.83 |
| 42 | 509(D) 1331 |
CLASS C CONCRETE | 2.8 | CY |
$400.00 |
$1,000.00 |
$400.00 |
$500.00 |
$539.12 |
| 43 | 510(A) 6334 |
RETAINING WALL | 124 | SY |
$1,000.00 |
$257.00 |
$740.00 |
$750.00 |
$1,317.88 |
| 44 | 511(A) 1332 |
REINFORCING STEEL | 1,346 | LB |
$1.00 |
$1.05 |
$1.00 |
$1.00 |
$1.76 |
| 45 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 251,231 | LB |
$1.10 |
$1.10 |
$1.00 |
$1.25 |
$0.9400 |
| 46 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,431 | SY |
$4.00 |
$3.75 |
$4.00 |
$4.00 |
$4.03 |
| 47 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 484 | LF |
$700.00 |
$600.00 |
$800.00 |
$850.00 |
$992.09 |
| 48 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 176 | LF |
$850.00 |
$900.00 |
$1,350.00 |
$1,500.00 |
$1,130.66 |
| 49 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 12 | EA |
$750.00 |
$1,500.00 |
$1,100.00 |
$1,500.00 |
$1,703.44 |
| 50 | 516(D) 6400 |
CSL ACCESS TUBES | 3,540 | LF |
$8.00 |
$12.00 |
$10.00 |
$13.00 |
$5.64 |
| 51 | 536(A) 2000 |
(SP) ABC - HORIZONTAL SLIDE | 1 | LSUM |
$250,000.00 |
$375,000.00 |
$350,000.00 |
$350,000.00 |
$898,725.00 |
| 52 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,262 | TON |
$40.00 |
$29.00 |
$40.00 |
$50.00 |
$31.25 |
| 53 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 271 | TON |
$40.00 |
$25.00 |
$35.00 |
$45.00 |
$28.47 |
| 54 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 160 | LF |
$20.00 |
$15.00 |
$30.00 |
$15.00 |
$27.43 |
| 55 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 7 | LF |
$20.00 |
$40.00 |
$30.00 |
$15.00 |
$10.18 |
| 56 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$130,000.00 |
$110,000.00 |
$125,000.00 |
$75,000.00 |
$122,130.00 |
| 57 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | EA |
$60.00 |
$11.00 |
$11.00 |
$500.00 |
$11.00 |
| 58 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$150.00 |
$265.00 |
$275.00 |
$100.00 |
$275.00 |
| 59 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 25 | LF |
$9.23 |
$16.00 |
$17.00 |
$10.00 |
$16.50 |
| 60 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$20.00 |
$5.50 |
$11.00 |
$10.00 |
$12.10 |
| 61 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 2,960 | LF |
$1.25 |
$0.9000 |
$1.00 |
$1.50 |
$0.9400 |
| 62 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 630 | SD |
$0.7500 |
$0.9000 |
$1.00 |
$2.25 |
$0.9400 |
| 63 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 126 | SD |
$1.15 |
$2.80 |
$2.20 |
$5.00 |
$2.20 |
| 64 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 84 | SD |
$1.75 |
$4.50 |
$4.40 |
$5.00 |
$4.40 |
| 65 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 42 | SD |
$2.00 |
$3.50 |
$2.75 |
$5.00 |
$2.75 |
| 66 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 168 | SD |
$0.1500 |
$0.5500 |
$0.5500 |
$2.00 |
$0.5500 |
| 67 | 880(I) 8902 |
FLAGGER | 10 | SD |
$100.00 |
$265.00 |
$200.00 |
$150.00 |
$110.00 |
| 68 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 84 | SD |
$15.00 |
$105.00 |
$110.00 |
$50.00 |
$110.00 |
| 69 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$21,250.00 |
$8,500.00 |
$15,000.00 |
$50,000.00 |
$8,525.00 |
| 70 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$7,500.00 |
$5,000.00 |
$7,500.00 |
$5,432.00 |
| 71 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$191,547.46 |
$190,000.00 |
$220,000.00 |
$175,000.00 |
$235,019.99 |