| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$7,500.00 |
$10,000.00 |
$13,250.00 |
$10,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,310 | CY |
$5.00 |
$5.00 |
$6.00 |
$7.50 |
$7.25 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 3,180 | CY |
$7.00 |
$8.00 |
$9.00 |
$8.50 |
$6.45 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,857 | LF |
$2.10 |
$1.50 |
$2.00 |
$1.65 |
$1.40 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 280 | LF |
$2.30 |
$12.35 |
$8.00 |
$7.00 |
$11.25 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 11,118.56 | SY |
$1.75 |
$1.80 |
$2.20 |
$2.05 |
$1.90 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.47 | AC |
$300.00 |
$650.00 |
$400.00 |
$300.00 |
$600.00 |
| 8 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 783.45 | CY |
$48.00 |
$37.00 |
$57.00 |
$60.00 |
$64.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 259.06 | TON |
$25.00 |
$27.00 |
$34.00 |
$30.56 |
$31.00 |
| 10 | 408 5774 |
PRIME COAT | 2,840 | GAL |
$5.00 |
$7.00 |
$7.00 |
$7.48 |
$7.50 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 602.69 | TON |
$90.00 |
$93.00 |
$98.00 |
$97.75 |
$95.00 |
| 12 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 88 | CY |
$8.00 |
$15.00 |
$18.00 |
$12.50 |
$20.00 |
| 13 | 509(B) 0321 |
CLASS A CONCRETE | 125.7 | CY |
$400.00 |
$400.00 |
$450.00 |
$437.50 |
$500.00 |
| 14 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$300.00 |
$250.00 |
$245.00 |
$300.00 |
| 15 | 511(A) 0332 |
REINFORCING STEEL | 18,690 | LB |
$1.00 |
$0.9000 |
$1.00 |
$0.8700 |
$0.9500 |
| 16 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 124 | TON |
$40.00 |
$39.00 |
$45.00 |
$46.00 |
$49.00 |
| 17 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 222 | LF |
$25.00 |
$27.00 |
$34.00 |
$28.00 |
$46.00 |
| 18 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 8 | EA |
$300.00 |
$150.00 |
$450.00 |
$300.00 |
$325.00 |
| 19 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 5,269 | LF |
$1.00 |
$0.5200 |
$1.10 |
$0.6500 |
$0.6000 |
| 20 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$8.00 |
$15.00 |
$10.00 |
$9.50 |
$10.00 |
| 21 | 501(F) 6352 |
GRANULAR BACKFILL | 56 | CY |
$30.00 |
$70.00 |
$60.00 |
$72.00 |
$90.00 |
| 22 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 209 | LF |
$190.00 |
$180.00 |
$214.00 |
$210.00 |
$219.00 |
| 23 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$175.00 |
$220.00 |
$170.00 |
$205.00 |
$260.00 |
| 24 | 504(B) 1305 |
SAW-CUT GROOVING | 261.2 | SY |
$5.00 |
$3.57 |
$7.00 |
$5.50 |
$20.00 |
| 25 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 196.6 | LF |
$60.00 |
$65.00 |
$65.00 |
$72.00 |
$77.00 |
| 26 | 506(A) 1322 |
STRUCTURAL STEEL | 100 | LB |
$2.25 |
$3.00 |
$15.00 |
$7.00 |
$2.30 |
| 27 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,000.00 |
$300.00 |
$650.00 |
$600.00 |
$280.00 |
| 28 | 509(A) 1326 |
CLASS AA CONCRETE | 75 | CY |
$450.00 |
$500.00 |
$450.00 |
$585.00 |
$595.00 |
| 29 | 509(B) 1328 |
CLASS A CONCRETE | 39.6 | CY |
$450.00 |
$550.00 |
$450.00 |
$605.00 |
$585.00 |
| 30 | 511(A) 1332 |
REINFORCING STEEL | 20,250 | LB |
$0.9000 |
$0.9000 |
$1.10 |
$0.8700 |
$0.9500 |
| 31 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 924 | LF |
$30.00 |
$30.00 |
$25.00 |
$25.90 |
$37.00 |
| 32 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 924 | LF |
$17.50 |
$15.00 |
$15.00 |
$11.10 |
$21.00 |
| 33 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 999.3 | TON |
$30.00 |
$37.00 |
$39.00 |
$40.03 |
$49.00 |
| 34 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 158.1 | TON |
$25.00 |
$31.00 |
$39.00 |
$32.51 |
$40.00 |
| 35 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$25.00 |
$25.00 |
$20.00 |
$31.00 |
$20.00 |
| 36 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$25.00 |
$25.00 |
$20.00 |
$40.00 |
$20.00 |
| 37 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$6,000.00 |
$10,000.00 |
$15,000.00 |
$14,000.00 |
$15,000.00 |
| 38 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,200.00 |
$2,275.00 |
$2,200.00 |
$2,100.00 |
$2,300.00 |
| 39 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,000.00 |
$1,630.00 |
$3,900.00 |
$2,050.00 |
$2,500.00 |
| 40 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,000.00 |
$7,700.00 |
$6,200.00 |
$8,000.00 |
$8,500.00 |
| 41 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$2,000.00 |
$3,500.00 |
$3,100.00 |
$7,500.00 |
| 42 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$16,500.00 |
$35,000.00 |
$27,500.00 |
$18,000.00 |