| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 9,514 | CY |
$5.00 |
$4.75 |
$6.72 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,024 | CY |
$7.50 |
$7.50 |
$17.74 |
| 3 | 209 0120 |
MACHINE GRADING | 29,334 | LF |
$3.00 |
$1.50 |
$3.50 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,250 | LF |
$1.75 |
$1.30 |
$3.16 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,050 | LF |
$6.25 |
$5.94 |
$10.54 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 30,704 | SY |
$1.25 |
$5.00 |
$3.16 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 6.35 | AC |
$350.00 |
$900.00 |
$526.97 |
| 8 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 86,578 | SY |
$4.85 |
$5.00 |
$5.18 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,227 | TON |
$38.00 |
$27.50 |
$59.15 |
| 10 | 407(B) 0250 |
TACK COAT | 6,154 | GAL |
$3.00 |
$2.99 |
$3.00 |
| 11 | 408 5774 |
PRIME COAT | 18,182 | GAL |
$5.50 |
$4.00 |
$4.25 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 18,846 | TON |
$74.00 |
$81.40 |
$91.00 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 9,136 | TON |
$78.00 |
$87.15 |
$94.00 |
| 14 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 100 | LF |
$60.00 |
$50.00 |
$85.52 |
| 15 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 49 | LF |
$80.00 |
$65.00 |
$105.94 |
| 16 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$900.00 |
$2,200.00 |
$2,318.68 |
| 17 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,000.00 |
$2,200.00 |
$2,318.68 |
| 18 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,218 | SY |
$4.00 |
$5.00 |
$5.91 |
| 19 | 619(C) 0924 |
SAWING PAVEMENT | 104 | LF |
$3.00 |
$3.00 |
$7.14 |
| 20 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 75.44 | SF |
$27.00 |
$28.00 |
$29.51 |
| 21 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 111,533 | LF |
$0.4200 |
$0.3700 |
$0.3900 |
| 22 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 2 | EA |
$400.00 |
$1,250.00 |
$1,317.43 |
| 23 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$11,565.00 |
$13,407.76 |
| 24 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$31,000.00 |
$25,000.00 |
| 25 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$5,000.00 |
$5,000.00 |
| 26 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$148,000.00 |
$51,242.00 |
$90,000.00 |