Bid tab 110319

Let May 19, 2011 · Division 8 · Tulsa Sign up free

‹ May 2011 results

BRIDGE REHABILITATION US -75: OVER NICKLE CREEK 1.9 MILES NORTH OF SH -117 IN THE CITY OF JENKS.

Let date
Thursday, May 19, 2011
Contract
110319
J/P numbers
27634(04)
District
Division 8
County
Tulsa
Highway
Limits
BRIDGE REHABILITATION US -75: OVER NICKLE CREEK 1.9 MILES NORTH OF SH -117 IN THE CITY OF JENKS.
Project number
SBR-172N(517)SB

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$784,539
1 PBX Corporation Low bidder $531,676 -32.2%
2 MERIDIAN CONTRACTING, INC. $655,893 -16.4% +23.4%
3 BECCO CONTRACTORS, INC. $628,766 -19.9% +18.3%
4 OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV) $650,994 -17.0% +22.4%
6 SCR CONSTRUCTION CO., INC. $875,494 +11.6% +64.7%

Bid tab: unit prices 38 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 PBX Corporation#2 MERIDIAN CONTRA…#3 BECCO CONTRACTO…#4 OBC, INC./PLAIN…#6 SCR CONSTRUCTIO…
1209 0120 MACHINE GRADING591LF $4.50 $3.00 $10.00 $20.00 $22.00 $15.00
2407(B) 0250 TACK COAT333GAL $5.00 $3.25 $8.00 $3.00 $3.63 $8.00
3408 5774 PRIME COAT42GAL $7.50 $8.50 $5.00 $3.00 $15.40 $12.00
4411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)588TON $90.00 $130.00 $130.00 $65.00 $127.60 $200.00
5412 5267 COLD MILLING PAVEMENT2,667SY $5.00 $4.00 $5.00 $2.00 $5.50 $8.00
6414(E) 0225 FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY)80SY $30.00 $30.00 $25.00 $75.00 $71.19 $140.00
7414(G) 5275 P.C. CONCRETE FOR PAVEMENT2CY $750.00 $130.00 $220.00 $200.00 $124.90 $95.00
8509(B) 0325 CLASS A CONCRETE(LONG. BAR. DES. 1-A)116CY $375.00 $286.00 $250.00 $400.00 $421.90 $75.00
9511(A) 0332 REINFORCING STEEL2,352LB $2.00 $1.00 $1.50 $2.00 $1.58 $2.00
10619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $5,000.00 $800.00 $14,800.00 $5,000.00 $5,500.00 $15,000.00
11619(B) 4728 REMOVAL OF ASPHALT PAVEMENT197SY $5.00 $14.00 $12.00 $10.00 $11.00 $10.00
12619(B) 4915 REMOVAL OF CONCRETE MEDIAN BARRIER591LF $20.00 $15.00 $15.00 $10.00 $11.00 $30.00
13627(A) 4317 CONCRETE LONGITUDINAL BARRIER, DESIGN 1564LF $170.00 $55.00 $45.00 $90.00 $61.90 $180.00
14627(B) 4410 CONCRETE LONGITUDINAL BARRIER END SECTIONS1EA $1,700.00 $1,200.00 $850.00 $25,000.00 $1,577.00 $5,000.00
15871(A) 8325 (SP)IMPACT ATTENUATOR1EA $25,000.00 $17,000.00 $10,900.00 $20,000.00 $18,700.00 $20,000.00
16501(G) 6309 CLSM BACKFILL69CY $150.00 $125.00 $140.00 $100.00 $88.86 $200.00
17504(A) 1304 APPROACH SLAB143SY $150.00 $150.00 $200.00 $200.00 $124.65 $185.00
18504(B) 1305 SAW-CUT GROOVING608SY $5.00 $6.00 $8.00 $5.00 $6.20 $7.00
19504(C) 6250 SEALED EXPANSION JOINT58LF $180.00 $300.00 $300.00 $250.00 $327.12 $300.00
20504(E) 6190 42" F-SHAPED PARAPET343LF $75.00 $80.00 $60.00 $100.00 $61.64 $110.00
21506(A) 1322 STRUCTURAL STEEL3,700LB $5.00 $5.00 $5.00 $5.00 $4.73 $4.00
22509 6386 SILICONE CONSTRUCTION JOINT62LF $30.00 $5.00 $20.00 $10.00 $34.50 $40.00
23509(A) 1326 CLASS AA CONCRETE205.7CY $600.00 $550.00 $350.00 $650.00 $650.00 $400.00
24511(B) 6010 EPOXY COATED REINFORCING STEEL30,790LB $1.00 $1.15 $1.50 $1.00 $1.20 $3.00
25512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $6,300.00 $12,000.00 $28,500.00 $15,000.00 $15,516.95 $14,000.00
26512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $1,800.00 $750.00 $7,500.00 $6,000.00 $1,391.50 $4,000.00
27513(B) 6019 CLASS B BRIDGE DECK REPAIR30SY $270.00 $125.00 $75.00 $200.00 $480.70 $350.00
28515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)162SY $4.00 $7.00 $11.00 $9.00 $9.20 $20.00
29619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $5,000.00 $20,000.00 $75,164.00 $15,000.00 $51,750.00 $78,000.00
30855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)800LF $0.7800 $2.00 $2.50 $2.00 $2.20 $2.50
31857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)800LF $0.1300 $0.3500 $2.50 $0.4000 $0.3900 $0.4500
32857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)600LF $0.1200 $0.5500 $2.50 $0.4000 $0.6000 $0.7000
33871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.70SD $10.46 $5.00 $40.00 $5.00 $5.50 $6.00
34877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER800LF $24.79 $10.00 $25.00 $20.00 $18.70 $45.00
35880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $8,000.00 $11,400.00 $9,800.00 $10,000.00 $10,450.00 $25,000.00
36882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN140SD $8.79 $50.00 $40.00 $55.00 $55.00 $50.00
37642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $7,500.00 $3,000.00 $14,850.00 $500.00 $3,300.00 $6,000.00
38641 1399 MOBILIZATION1LSUM $32,000.00 $26,014.00 $66,437.00 $55,000.00 $36,549.45 $60,000.00