| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$8,905.12 |
$22,624.84 |
$11,547.49 |
$30,750.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 6,200 | CY |
$8.00 |
$4.54 |
$8.00 |
$10.79 |
$12.30 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,500 | CY |
$13.00 |
$7.95 |
$11.53 |
$20.09 |
$15.38 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$11,354.03 |
$9,553.29 |
$16,500.00 |
$20,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 100 | LF |
$3.50 |
$6.87 |
$4.63 |
$2.19 |
$2.24 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 320 | LF |
$6.50 |
$6.45 |
$10.37 |
$10.95 |
$11.22 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 2,613 | SY |
$5.00 |
$2.39 |
$3.19 |
$2.37 |
$2.43 |
| 8 | 232(B) 2814 |
SEEDING METHOD B | 1.1 | AC |
$740.00 |
$221.52 |
$1,036.72 |
$218.90 |
$224.37 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.1 | AC |
$800.00 |
$217.06 |
$1,036.72 |
$214.50 |
$219.86 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 928 | CY |
$45.00 |
$46.39 |
$44.74 |
$54.75 |
$47.15 |
| 11 | 307(K) 4300 |
STABILIZED SUBGRADE | 7,931 | SY |
$10.00 |
$5.73 |
$4.05 |
$4.90 |
$7.15 |
| 12 | 325 5271 |
SEPARATOR FABRIC | 9,497 | SY |
$2.00 |
$1.65 |
$1.16 |
$1.73 |
$2.56 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 346 | TON |
$35.00 |
$25.07 |
$31.99 |
$26.31 |
$43.05 |
| 14 | 407(B) 0250 |
TACK COAT | 303 | GAL |
$5.00 |
$2.62 |
$6.29 |
$3.12 |
$2.96 |
| 15 | 408 5774 |
PRIME COAT | 908 | GAL |
$5.00 |
$5.33 |
$5.25 |
$4.19 |
$6.02 |
| 16 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 696 | TON |
$75.00 |
$89.06 |
$97.57 |
$78.50 |
$100.76 |
| 17 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,393 | TON |
$75.00 |
$96.57 |
$99.44 |
$85.00 |
$109.25 |
| 18 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 1,205 | SY |
$70.00 |
$21.01 |
$18.82 |
$15.55 |
$30.75 |
| 19 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 268 | CY |
$150.00 |
$111.29 |
$115.83 |
$131.87 |
$99.94 |
| 20 | 509(B) 0321 |
CLASS A CONCRETE | 137 | CY |
$350.00 |
$260.00 |
$364.88 |
$319.03 |
$344.40 |
| 21 | 509(D) 0325 |
CLASS C CONCRETE | 100 | CY |
$325.00 |
$260.00 |
$364.88 |
$230.59 |
$410.00 |
| 22 | 511(A) 0332 |
REINFORCING STEEL | 7,110 | LB |
$1.00 |
$1.15 |
$1.16 |
$0.5800 |
$1.13 |
| 23 | 601(G) 1362 |
TYPE III LAID UP RIPRAP | 160 | SY |
$55.00 |
$35.87 |
$31.90 |
$91.63 |
$87.13 |
| 24 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 208 | SY |
$4.00 |
$2.62 |
$3.48 |
$12.21 |
$87.13 |
| 25 | 609(B) 1513 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) | 200 | LF |
$18.00 |
$29.29 |
$17.38 |
$37.42 |
$25.63 |
| 26 | 613(A) 4503 |
14" X 23" R.C.PIPE ELLIPTICAL CLASS HE-III | 793 | LF |
$60.00 |
$54.37 |
$42.92 |
$55.59 |
$76.88 |
| 27 | 613(A) 4520 |
19" X 30" R.C.PIPE ELLIPTICAL CLASS HE-IV | 241 | LF |
$80.00 |
$59.42 |
$81.29 |
$64.35 |
$97.16 |
| 28 | 613(M) 7191 |
TYPE AA4 CULVERT END TREATMENT | 2 | EA |
$800.00 |
$3,579.80 |
$231.67 |
$2,221.61 |
$1,230.00 |
| 29 | 613(O) 5099 |
SPECIAL END SECTION OF 14" X 23" RCP ELLIPTICAL | 38 | EA |
$600.00 |
$956.70 |
$752.92 |
$722.09 |
$1,019.88 |
| 30 | 613(O) 5157 |
SPECIAL END SECTION OF 19" X 30" RCP ELLIPTICAL | 10 | EA |
$750.00 |
$1,011.55 |
$805.51 |
$816.16 |
$1,116.23 |
| 31 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 317 | CY |
$30.00 |
$23.08 |
$27.24 |
$67.19 |
$41.00 |
| 32 | 613(V) 1180 |
TRENCH EXCAVATION | 357 | CY |
$10.00 |
$7.26 |
$23.70 |
$36.02 |
$10.25 |
| 33 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$7,000.00 |
$2,685.51 |
$10,678.32 |
$19,945.78 |
$12,300.00 |
| 34 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 4,588 | SY |
$3.50 |
$3.63 |
$2.87 |
$4.99 |
$5.64 |
| 35 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 91 | SY |
$3.50 |
$8.43 |
$22.31 |
$19.59 |
$10.25 |
| 36 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 440 | LF |
$6.00 |
$14.01 |
$10.21 |
$24.34 |
$12.30 |
| 37 | 619(C) 0924 |
SAWING PAVEMENT | 189 | LF |
$5.00 |
$2.88 |
$8.73 |
$5.00 |
$6.15 |
| 38 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 9 | EA |
$45.00 |
$55.66 |
$57.92 |
$55.00 |
$56.38 |
| 39 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 72.11 | SF |
$16.00 |
$20.04 |
$16.22 |
$15.40 |
$15.79 |
| 40 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 128 | LF |
$12.00 |
$13.36 |
$11.58 |
$11.00 |
$11.28 |
| 41 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 7,982 | LF |
$0.8000 |
$0.9500 |
$0.9300 |
$0.8800 |
$0.9000 |
| 42 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 2 | EA |
$300.00 |
$834.86 |
$347.50 |
$330.00 |
$338.25 |
| 43 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$6,700.00 |
$7,540.13 |
$11,583.41 |
$8,800.00 |
$9,020.00 |
| 44 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$16,000.00 |
$15,494.90 |
$20,979.88 |
$14,619.00 |
$15,660.00 |
| 45 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$879.95 |
$3,000.00 |
$6,050.00 |
$6,150.00 |
| 46 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$792.27 |
$5,791.71 |
$9,255.44 |
$9,225.00 |
| 47 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$35,000.00 |
$48,020.00 |
$27,000.00 |
$54,000.00 |
$48,175.00 |