| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$20,000.00 |
$32,000.00 |
$50,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 227 | CY |
$6.00 |
$10.00 |
$12.23 |
$10.00 |
| 3 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$200,000.00 |
$180,000.00 |
$243,881.20 |
$350,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,100 | LF |
$3.00 |
$1.25 |
$1.18 |
$1.80 |
| 5 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$300.00 |
$175.00 |
$280.23 |
$220.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,870 | LF |
$8.00 |
$4.40 |
$4.20 |
$6.75 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 71,800 | SY |
$2.00 |
$1.08 |
$1.04 |
$1.40 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 22 | AC |
$400.00 |
$275.00 |
$261.23 |
$275.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 5,420 | CY |
$40.00 |
$35.00 |
$39.23 |
$40.00 |
| 10 | 311(B) 0152 |
PROCESSING EXISTING BASE & SURFACE, METHOD B | 9,066 | LF |
$1.00 |
$1.10 |
$2.20 |
$1.50 |
| 11 | 325 5271 |
SEPARATOR FABRIC | 34,125 | SY |
$1.25 |
$1.50 |
$1.23 |
$1.50 |
| 12 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 166 | TON |
$40.00 |
$21.50 |
$20.23 |
$40.00 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,640 | TON |
$70.00 |
$71.67 |
$69.23 |
$64.50 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,620 | TON |
$80.00 |
$74.30 |
$80.23 |
$75.50 |
| 15 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 14 | CY |
$15.00 |
$10.00 |
$20.20 |
$30.00 |
| 16 | 509(B) 0321 |
CLASS A CONCRETE | 49.5 | CY |
$400.00 |
$400.00 |
$423.20 |
$500.00 |
| 17 | 509(D) 0325 |
CLASS C CONCRETE | 41.6 | CY |
$250.00 |
$250.00 |
$223.23 |
$350.00 |
| 18 | 511(A) 0332 |
REINFORCING STEEL | 7,228 | LB |
$0.8000 |
$1.00 |
$1.10 |
$1.00 |
| 19 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 4,851 | TON |
$60.00 |
$33.00 |
$32.23 |
$58.00 |
| 20 | 611(G) 5334 |
INLET GPI TYPE 2 (DES. 8) | 1 | EA |
$2,200.00 |
$2,200.00 |
$2,200.00 |
$3,000.00 |
| 21 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 80 | LF |
$70.00 |
$35.00 |
$32.86 |
$70.00 |
| 22 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 122 | LF |
$125.00 |
$70.00 |
$62.42 |
$120.00 |
| 23 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 166 | LF |
$160.00 |
$110.00 |
$98.06 |
$150.00 |
| 24 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 42 | LF |
$40.00 |
$25.00 |
$26.23 |
$50.00 |
| 25 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 150 | LF |
$35.00 |
$20.00 |
$20.20 |
$50.00 |
| 26 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 216 | LF |
$40.00 |
$25.00 |
$28.23 |
$50.00 |
| 27 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 90 | LF |
$50.00 |
$32.00 |
$34.23 |
$65.00 |
| 28 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 60 | LF |
$60.00 |
$48.00 |
$42.23 |
$75.00 |
| 29 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 10 | EA |
$400.00 |
$110.00 |
$250.00 |
$350.00 |
| 30 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 12 | EA |
$500.00 |
$143.00 |
$220.23 |
$450.00 |
| 31 | 613(L) 4522 |
35" X 24" PREFAB. CULVERT END SECTION, ARCH | 6 | EA |
$575.00 |
$230.00 |
$350.20 |
$600.00 |
| 32 | 613(L) 4530 |
42" X 29" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$675.00 |
$350.00 |
$500.00 |
$680.00 |
| 33 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$250.00 |
$140.00 |
$756.23 |
$675.00 |
| 34 | 613(O) 4375 |
SPECIAL END SECTION OF 24" RCP ROUND | 1 | EA |
$1,000.00 |
$500.00 |
$756.23 |
$1,000.00 |
| 35 | 613(O) 4379 |
SPECIAL END SECTION OF 36" RCP ROUND | 4 | EA |
$1,200.00 |
$875.00 |
$1,596.00 |
$1,200.00 |
| 36 | 613(O) 4383 |
SPECIAL END SECTION OF 48" RCP ROUND | 2 | EA |
$1,500.00 |
$1,550.00 |
$2,323.23 |
$1,500.00 |
| 37 | 619(B) 4778 |
REMOVAL OF EXISTING STRUCTURES | 1 | EA |
$1,500.00 |
$1,000.00 |
$5,500.00 |
$1,500.00 |
| 38 | 619(C) 0924 |
SAWING PAVEMENT | 66 | LF |
$5.00 |
$5.00 |
$10.00 |
$4.00 |
| 39 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 725 | LF |
$18.00 |
$13.50 |
$12.06 |
$13.25 |
| 40 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 8 | EA |
$1,500.00 |
$950.00 |
$865.23 |
$952.00 |
| 41 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 5 | EA |
$100.00 |
$100.00 |
$100.00 |
$125.00 |
| 42 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 35.36 | SF |
$20.00 |
$15.00 |
$14.07 |
$24.25 |
| 43 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 78 | LF |
$15.00 |
$12.00 |
$11.05 |
$15.50 |
| 44 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 64,541 | LF |
$0.5000 |
$0.1500 |
$0.1400 |
$0.1000 |
| 45 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$20,000.00 |
$2,500.00 |
$2,500.00 |
$7,750.00 |
| 46 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$14,500.00 |
$14,500.00 |
$25,000.00 |
| 47 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$1,500.00 |
$4,500.00 |
$5,000.00 |
| 48 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$65,000.00 |
$50,000.00 |
$60,000.00 |
$125,000.00 |