| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$21,000.00 |
$10,000.00 |
$28,100.00 |
$65,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 17,039 | CY |
$6.00 |
$9.50 |
$9.30 |
$7.90 |
$10.75 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 47,496 | LF |
$2.50 |
$1.15 |
$1.05 |
$1.05 |
$0.9700 |
| 4 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 34 | EA |
$175.00 |
$240.00 |
$180.00 |
$160.00 |
$150.84 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 336 | LF |
$6.00 |
$7.50 |
$6.25 |
$8.00 |
$7.54 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 42,858 | SY |
$2.50 |
$1.12 |
$1.25 |
$1.35 |
$1.27 |
| 7 | 232(B) 2814 |
SEEDING METHOD B | 8.85 | AC |
$500.00 |
$440.00 |
$250.00 |
$330.00 |
$312.46 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 8.85 | AC |
$500.00 |
$460.00 |
$450.00 |
$557.40 |
$527.95 |
| 9 | 307(A) 4200 |
FLY ASH | 3,316 | TON |
$70.00 |
$67.00 |
$65.00 |
$68.75 |
$96.47 |
| 10 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 76,691 | SY |
$3.00 |
$2.20 |
$2.00 |
$1.60 |
$2.20 |
| 11 | 408 5774 |
PRIME COAT | 18,572 | GAL |
$4.50 |
$5.00 |
$6.00 |
$6.20 |
$5.85 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 15,827 | TON |
$62.00 |
$63.50 |
$64.40 |
$65.85 |
$94.00 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,716 | TON |
$70.00 |
$75.50 |
$73.50 |
$79.20 |
$94.00 |
| 14 | 509(A) 0319 |
CLASS AA CONCRETE | 138 | CY |
$500.00 |
$1,050.00 |
$550.00 |
$622.00 |
$895.00 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$300.00 |
$350.00 |
$330.00 |
$398.00 |
$200.00 |
| 16 | 511(A) 0332 |
REINFORCING STEEL | 19,883 | LB |
$1.20 |
$1.00 |
$1.50 |
$1.05 |
$1.00 |
| 17 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 9 | TON |
$45.00 |
$49.00 |
$50.00 |
$57.00 |
$50.00 |
| 18 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 84 | LF |
$70.00 |
$57.00 |
$65.00 |
$51.75 |
$75.00 |
| 19 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 32 | LF |
$75.00 |
$100.00 |
$124.00 |
$72.00 |
$95.00 |
| 20 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 64 | LF |
$30.00 |
$29.00 |
$22.75 |
$25.00 |
$25.00 |
| 21 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 30 | LF |
$35.00 |
$35.00 |
$30.00 |
$31.50 |
$30.00 |
| 22 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 450 | LF |
$30.00 |
$40.00 |
$22.95 |
$25.45 |
$26.00 |
| 23 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 56 | LF |
$33.00 |
$67.00 |
$30.00 |
$31.74 |
$33.00 |
| 24 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 30 | EA |
$500.00 |
$285.00 |
$175.00 |
$235.00 |
$250.00 |
| 25 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$550.00 |
$560.00 |
$230.00 |
$163.50 |
$300.00 |
| 26 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$500.00 |
$365.00 |
$230.00 |
$265.50 |
$200.00 |
| 27 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$550.00 |
$920.00 |
$1,550.00 |
$769.20 |
$900.00 |
| 28 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$600.00 |
$1,000.00 |
$1,880.00 |
$843.00 |
$1,000.00 |
| 29 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$25,000.00 |
$20,000.00 |
$18,250.00 |
$55,000.00 |
| 30 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 76,669 | SY |
$1.50 |
$0.8500 |
$2.00 |
$1.45 |
$2.80 |
| 31 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 107 | LF |
$2.75 |
$4.10 |
$3.40 |
$3.90 |
$3.72 |
| 32 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 3,350 | LF |
$3.00 |
$4.10 |
$3.47 |
$4.00 |
$3.74 |
| 33 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 7 | EA |
$100.00 |
$110.00 |
$50.00 |
$100.00 |
$105.59 |
| 34 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$100.00 |
$110.00 |
$100.00 |
$100.00 |
$52.80 |
| 35 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 63.23 | SF |
$20.00 |
$12.25 |
$12.00 |
$13.75 |
$12.80 |
| 36 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 144 | LF |
$15.00 |
$10.25 |
$10.00 |
$11.50 |
$10.67 |
| 37 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 53,094 | LF |
$0.1500 |
$0.1300 |
$0.1300 |
$0.1500 |
$0.1400 |
| 38 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$20,000.00 |
$10,000.00 |
$7,500.00 |
$15,000.00 |
$8,500.00 |
| 39 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,000.00 |
$30,000.00 |
$75,000.00 |
$55,000.00 |
$45,000.00 |
| 40 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$10,000.00 |
$13,000.00 |
$7,500.00 |
| 41 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$190,280.00 |
$29,450.00 |
$150,000.00 |
$170,000.00 |
$50,000.00 |